Loading…
Loading…
30,246 results • Best match
HIGHWAY PETROLLING RESCUE EQUIPMENT -50 set
HIGHWAY PATROLLING RESCUE EQUIPMENT -50 SETS
OTHER NON CONSULTANCY SERVICES Traffic Survey for Feasibility Study and preparation of Detailed Project Report for the Development of Expressways in Gujarat Package 2 Surendranagar to Pipavav, Length 211km)
Construction of Eight Lane access controlled Expressway from Km 3 to Km 20.200 Shirsad to Akloli section Spur of Vadodara Mumbai Expressway Project in the state of Maharashtra on EPC Mode under Bharatmala Pariyojana
Securing of ROW for four lane Greenfield Expressway for Connection of Amritsar with Delhi Amritsar Katra Expressway from km 40.900 to km 70.950 of NE 5A in the state of Punjab Amritsar Spur II
4 Lane Expressway from km 26.400 to km 53.500 of Malur to Bangarpet Section of Bangalore Chennai Expressway on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Karnataka (Phase-I Package-II)
4 Lane Expressway from km 53.500 to km 71.000 of Bangarpet to Bethamangala Section of Bangalore Chennai Expressway on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Karnataka (Phase-I Package-III)
Construction of Eight lane access controlled Expressway from Km 154.600 to Km 190.000 of Vadodara Mumbai Expressway Jujuwa to Gandeva Section in the State of Gujarat on HAM under BMP Phase I-Pkg VIII
Please refer tender notice
siver road Nirman ka karya
Please refer to BOQ
NALA NIRMAN KARYA
BOQ
refer to BOQ
AS PER NIT
Road Safety Measure by providing Road marking, Road Studs and Sign Board for different roads under Mayurakshi Bridge Highway Sub-Division of Murshidabad Highway Division No. II.
Selection of Developers for Development of Wayside Amenities along the Bundelkhand, Purvanchal and Gorakhpur Link Expressway on DBFOT Basis.
Retarring of Highway hope road
Boner Highway pwer Interlocking Work
Supply of LED Highway Light
SUPPLY OF HIGHWAY ENGINEERING LABORATORY
HART COMMUNICATOR (Highway Addressable Remote
Replacement of damaged PQC Panels along Mumbai Pune Expressway between Km 33To 60 Mumbai Corridor and Km 60To 95 Mumbai Corridor
M/o Trees Shubs and lawn on 60mtr Wide road 7.10km to 12.60km and 50 mtr wide green belt along 60 mtr wide road left side of expressway from Ch.7.10km to 15.60km for two years YEA.
M/o Trees shrubs and lawn on 120m wide road ch.2.10km to 6.50km left side of Yamuna expressway and adjoin 100m wide road and 30m wide road in Sec-17 Central verge for two year WC-Horti
Estimate for Providing of Temporary Lighting in view of Sri Rama Navami Usthavalu and Rathayatra at Ram mandir to Mangal Basthi, Gandhi Theme park, National Highway, Old Market Kaman, gollabasthi, Sarai road to ram Mandhir for 4 Days i.e, from 05.04.2025 to 08.04.2025 in Patancheru division - 113 in the month of April - 2025 in Ramachandrapuram and Patancheru Circle - 22 in Serilingampally Zone, GHMC.
Construction of National Highway Crossing of 6 Lane Bridge and additional 2 Lane Service road Bridge on either side at Km.88.035 of Polavaram Irrigation Project Left Main Canal near Bendapudi(V) of Thondangi(M) in East Godavari District, Andhra Pradesh (NH-16 at Km.832.600) with approach roads connecting to existing 4 Lane NH road, Canal Excavation and Canal CC Lining.
Estimate for Providing of Temporary lighting in view Sri Rama Navami Usthavalu and Rathayatra at Ram Mandir to Mangal Basthi, Gandhi Theme Park, National Highway, old Market kaman, Golla Basthi, Sarai Road to Ram Mandhir for 4 Days i.e, from 29.03.2023 to 01.04.2023 in Patancheru Division-113 in the month of March-2023 in R.C.Puram and Patancheru Circle-22, in Serilingampally Zone,GHMC.
Construction of National Highway Crossing of 6 Lane Bridge and additional 2 Lane Service road bridge on either side at Km.64.375 of Polavaram Irrigation Project Left Main Canal near Prathipadu(V)of Prathipadu(M)in East Godavari District,Andhra Pradesh (NH-16 at Km.858.200) with approach roads connecting to existing 4 Lane NH road,Canal Excavation and CC Lining.
Estimate for Providing of Temporary Lighting in view of Sri Rama Navami Usthavalu and Rathayatra at Ram mandir to Mangal Basthi, Gandhi Theme park, National Highway, Old Market Kaman, gollabasthi, Sarai road to ram Mandhir for 4 Days i.e, from 16.04.2024 to 19.04.2024 in Patancheru division-113 in the month of April-2024 in Ramachandrapuram and Patancheru Circle-22 in Serilingampally Zone,GHMC.
Supply and Delivery of Plants & Tree, Manure(Gobar), Vermi-Compost, Red Soil & for Haritha Haram Plantation on occassion of Honble CM KCR Birthday as Near Ayyappa Temple, National Highway,Road both sides ,More Market to RDO Office and 11th ward road to Yellaiah Kunta both road side and various area Replacement plants in Toopran Municipality under Pattana Pragathi Fund 2020-21
Construction of National Highway crossing of 6 Lane Bridge and additional 2 Lane Service road bridge on either side at Km.77.175 of Polavaram Irrigation Project Left Main Canal near Chendurthi(V) of Gollaprolu(M) in East Godavari District, Andhra Pradesh(NH-16 at Km.843.62) with approach roads connecting to existing 4 Lane NH road, Canal Excavation and CC Lining.
REMOVING SILT From Chuttugunta circle to national highway Lalpuram West Side,From chuttugunta circle to adarsh nagar entrance NRT Road South Side,Adarsh Nagar Main Road From D.No:88-7-2176 to 88-8-3049 Towards East Tower Road and Durga Nagar 1st Line, Uppu Vagu from kkr theatre to SSS Apartment in Div No.25 Under AE-3 Section
REMOVING SILT From Chuttugunta circle to national highway Lalpuram West Side,From chuttugunta circle to adarsh nagar entrance NRT Road South Side,Adarsh Nagar Main Road From D.No:88-7-2176 to 88-8-3049 Towards East Tower Road and Durga Nagar 1st Line, Uppu Vagu from kkr theatre to SSS Apartment in Div No.25 Under AE-3 Section
Construction of National Highway crossing of 6 Lane Bridge and additional 2 Lane Service Road Bridge on either side at Km.173.609 of Polavaram Irrigation Project Left Main Canal near Pisinikada(V) of Kasimkota(M) in Visakhapatnam district, Andhra Pradesh (NH-16 at Km.747.950) with approach roads connecting to the existing 4 Lane NH road, Canal Excavation and Canal CC Lining.
Construction of National Highway Crossing of 6 Lane Bridge and additional 2 Lane Service Bridge on either side at Km.173.609 of Polavaram Irrigation Project Left Main Canal near Pisinikada(V) of Kasimkota(M) in Visakhapatnam District, Andhra Pradesh (NH-16 at Km.747.950) with approach roads connecting to existing 4 Lane NH road,Canal Exvation and Canal CC Lining.
Construction of National Highway crossing of six Lane Bridge and additional 2 Lane Service Road Bridge on either side at Km.173.609 of Polavaram Irrigation Project Left Main Canal near Pisinikada(V) of Kasimkota(M) in Visakhapatnam District, Andhra Pradesh(NH-16 at Km.747.950) with approach Roads connecting to existing 4 Lane NH Road,Canal excavation and CC LIning.
REMOVING SILT From Chuttugunta circle to national highway Lalpuram West Side,From chuttugunta circle to adarsh nagar entrance NRT Road South Side,Adarsh Nagar Main Road From D.No:88-7-2176 to 88-8-3049 Towards East Tower Road and Durga Nagar 1st Line, Uppu Vagu from kkr theatre to SSS Apartment in Div No.25 Under AE-3 Section
Construction of National Highway crossing of 6 Lane Bridge and additional 2 Lane Service Road Bridge on either side at KM.173.609 of Polavaram Irrigation Project Left Main Canal near Pisinikada(V) of Kasimkota(M) in Visakhapatnam District, Andhra Pradesh(NH-16 at KM 747.950) with approach roads connecting to existing 4 Lane NH road, canal Excavation and Canal CC Lining.
Construction of National Highway crossing of 6 Lane Bridge and additional 2 Lane Service Road Bridge on either side at KM.173.609 of Polavaram Irrigation Project Left Main Canal near Pisinikada(V) of Kasimkota(M) in Visakhapatnam District, Andhra Pradesh(NH-16 at KM 747.950) with approach roads connecting to existing 4 Lane NH road, canal Excavation and Canal CC Lining.
Supplying and Plantation of 18000 saplings to be planted along Kundli- Manesar- Palwal Expressway between section Pachgaon Chowk to Nuh District Border and Farrukhnagar crossing to Jhajjar District Border including maintenance for five years
Providing Cement Concrete Pavement at Ismail road to Highways road in Arasarkulam Thenpathi Panchayat
Pot Holes Filling Work at State Highways Roads which Renewal by Hot Mix Plant
Maintenance of State Highways in (R&B) Section, Gannavaram for the year 2020-21
Maintenance of State Highways in (R&B) Section, Mandapeta for the year 2025-26
Maintenance of State Highways in (R&B) Section, Draksharama for the year 2025-26