Loading…
Loading…
84 live57 closing this weekmost from Yamuna Expressway Industrial Development Authority and National Highways Authority of India
84 results • Best match
CONSTRUCTION OF INTERLOCKING ROAD FROM G T ROAD HIGHWAY TO PRAKASH CHAND HOUSE VIA RAMCHANDRA HOUSE IN WARD 1 AMBEDKAR NAGAR NAI BAZAR IN NAGAR PANCHAYAT KHAGA FATEHPUR
Development of High Speed AC GF Highway from Shamli Gorakhpur from Ch.466.000 to Ch.510.700 in the State of Uttar Pradesh on HAM mode Package9 Design Length 44.700 Km
Development of High Speed Access Controlled Greenfield Highway from Shamli-Gorakhpur from Ch. 662.400 to Ch.745.594 in the State of Uttar Pradesh on HAM mode (Package-12) (Design length 83.194 Km)
Rehabilitation and Upgradation of existing 4L highway to a 6L divided carriageway of Orai Barah Section of NH27 from Ex. Km 1515.713 to Km 1578.383 in the State of Uttar Pradesh on HAM (Total Length 62.670 km).
Operation and Maintenance of 6-lane Badarpur Elevated Highway (including service roads ramps approaches PUPs and Parks) on Delhi-Agra Section on NH-2 from Km. 16.100 to Km. 20.500 in Delhi and Haryana on Item Rate (Percentage) basis.
Rehabilitation and Upgradation of existing 4L highway to a 6L divided carriageway of Jhansi Orai Section (PKG-2) from Design Km 1423.000 Sultanpura Village to Design Km 1469.000 near Ingui Khurd Village NH-27 in UP on HAM mode. (TL46.000 kms).
Rehabilitation and Upgradation of existing 4L highway to a 6L divided carriageway of Jhansi-Orai Sec. (PKG-1) from Design Km 1378.915 near Jhansi (Sijwaha Tiraha NH27) to Design 1423.000 near Sultanpura Village NH-27 in UP on HAM mode. (TL44.085 kms)
Rehabilitation and Upgradation of existing 4L highway to a 6L divided carriageway of Jhansi Orai Section (PKG-3) from Design Km 1469.000 near Ingui Khurd Village to Design Km 1515.710 near Orai (Bandha Village) NH-27 in Uttar Pradesh on HAM mode.
Dev of 4/6L of AC Kanpur Kabrai GF highway start 0.000 (Kanpur Ring road) to 117.700 near Kabrai Sec1 and Overlay/Strengthen other road safety and improvement works on exist Kanpur Kabrai sec from 7.430 to 130.100 of NH34 in UP Sec2 on DBFOT pattern
Construction of CC road, drains, and interlocking work on the side berms from NH-28 Highway via the house of Raghavendra Ram Tripathi and the house of Dr. S. K. Sharma up to the public toilet, and from the house of Chiranjan Dubey up to Prem Kunj in
Construction of 75.00 mtr wide road peripherial road and sewer line between sector -09 and Airport yeida WC-03
Development work for 7 Abadi plots of village salarpur yeida. WC-03
Development work of village kadalpur to be develop as smart village , yea WC-06
Development work of village Achhepur to develop as smart village in YEA WC-06
Construction of 45mtr wide road in sector -8D yeida(between plot no-03 to plot no-1H) WC-04
Construction of 45mtr wide road in sector -8D yeida(between plot no -04 to plot-23) WC-04
Construction of 75.00mtr wide peripherial road and sewer line between sector- 5 and 6 yeida .WC-3
Development work of village .parsol (majra- bagh) to be develop as smart village ,YEA.WC-6
Development work of 7 Abadi plots of village- Acchheja Bujurg Situated at Doongarpur Reel kha, YEIDA.WC-01
Balance internal development work industrial sector -29 part -B ,YEIDA WC-04
Construction of service road along 75.00 mtr wide peripheral road (sector -08 side) between sector -08 and 8B, yeida wc-03
Providing and laying drain and sewer line in sector -10 YEA .WC-02
Construction of community center in village -chak Jalalabad, Yeida. wc-06
Construction of Service Road of 45mtr wide Road Along Patanjali to Plot No.-04 in Sector- 24A, YEIDA.wc-4
C/O RCC drain from node 358 to 365 in sec-21.yea. WC-02
Construction of 04 Nos tubewell with rising main in sector -8D, YEIDA WC-04
Request for Proposal (RFP) for Constituting Panel of Chartered Accountants for conducting Statutory Audit for development of International Film City in YEIDA
Request for Proposal (RFP) for Selection of Agency for Conducting Independent Engineer Services for development of International Film City in YEIDA
Construction of Service road on 45.0mtr. wide road different location along pocket-5A, 1A, 1B Between Pocket- 7C and T.S-2, 7B and 7C, 7D along 7F with Maintenance for Five Year in Sector-18 YEA. WC-01
Request for Proposal (RFP) for Hiring of Design development and Project Management Consultants for Internal Infrastructure Development of Sector 8 and 8D at YEIDA
Construction work of RCC box culvert
Maintenance of 33, 11 KV and LT line and replacement of cable box of 11 KV and 33 KV XLPE Cable installed at highway rod Crossing and other works in the jurisdiction of EDSD Chuttmalpur under EDD Behat
Maintenance of 33, 11 KV and LT Line and replacement of cable box of 11 KV and 33 KV XPE Cable installed at highway rod crossing and other works in the jurisdiction of EDSD Ghunna under EDD Sarsawa