Loading…
Loading…
4,630 results • Best match
Selection of Authoritys Engineers (AE) for supervision of construction of bypass for providing Inter-connectivity amongst National Highways (NHs) arround the pratapghar city (Pratapgarh Bypass ) on EPC Mode in the state of Uttar Pradesh
Balance work for Construction of Bypass for Providing Inter-connectivity amongst National Highways (NHs) around the Pratapgarh City (Pratapgarh Bypass) on Item rate from Km 2.9 to 13.88 in the state of Uttar Pradesh
QUANTUM OF WORKS FOR 33 KV LINE, 11 KV AND L.T. LINE DUE TO ROAD WIDENING OF MEERUT TO PRAYAHRAJ ROAD (GANGA EXPRESSWAY), UNNAO UNDER DEPOSITE SCHEME UNDER THE AREA OF EDD-V, HASANGANJ, UNNAO
REPLACEMENT OF DAMAGED UNDERGROUND 300 METER 11KV XLPE CABLE 3X185 SQ.MM. BY HDD METHOD EXPRESSWAY CROSSING BY NEW 11KV XLPE CABLE 3X185 SQMM ALONG WITH 04 Nos CABLE BOX etc WORK UNDER EDD KARHAL MAINPURI
M/o of sewer line and MSPS/SPS at Expressway (Emergency work Replacing, Supply and Laying of Burst High Tension 11 KV Grade XLPE and other related Electric works for MSPS-1 Sec-136) NOIDA
Construction of Six lane upgradable to Eight lane of Kanpur Lucknow Expressway including spur from Km 28.500 to Km 73.744 in the state of Uttar Pradesh on Hybrid Annuity mode under Bharatmala Pariyojana (Package-2)
Construction of Six lane upgradable to Eight lane of Kanpur Lucknow Expressway including spur from Km 10.980 to Km 28.500 in the state of Uttar Pradesh on Hybrid Annuity mode under Bharatmala Pariyojana (Package-I)
D/o Sector 163 To 167 A and 167 B (C/o R.C.C Central Verge, R.C.C Drain, Footpath and Service Road On 45.00 Mtr Wide Road Parallel to Expressway from Sector-167 to 163) Noida
Releasing Commercial Connection 7.5kw Under Deposit Scheme to Regional Officer U.P. Pollution Central Board, Near eastern peripheral expressway Duhai Ghaziabad in the area of EUDD-VII GZB under the jurisdiction of SE EUDC-III Ghaziabad
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAYS ON LEASE BASIS IN THE STATE OF UTTAR PRADESH AND BIHAR (DBOT-3 SITES)NH-34/Aligarh-Kanpur/Pkg-3/295 PLUS750/LHS/Saray Maddu/UP
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Uttar Pradesh (Package NO- CE-RO/LKO/DPR /Lot-II/Package-I)
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Uttar Pradesh (Package NO- CE-RO/LKO/DPR/ Lot-II/Package-III)
D/o Sector-152, 153 and 154 ( Repair/Raising of Drain and Laying of Cover and Painting work on Central Verge, Footpath for 45 Mtr wide road infront of sector-153 and 154 Expressway Side ) Noida.
Strenghtening of Water Supply ( Shifting of Tube Wells No. 1/152 to Sector-153 Due to Widening of Kondli Underapass at Expressway) Noida( Errection of New Boring, C/o Foundation and Room and Making Connection) Noida
QUANTUM OF WORKS FOR SHIFTING OF 33 KV LINE, 11 KV AND L.T. LINE DUE TO ROAD WIDENING OF MEERUT TO PRAYAHRAJ ROAD (GANGA EXPRESSWAY), UNNAO UNDER DEPOSITE SCHEME UNDER THE AREA OF EDD-I, UNNAO
M/o Deep Sewer line (C/o Destroyed Manholes and Balance Sewer line at LHS Sector-96B and RHS Sector-126 chanage 2.360 KM Noida Gr. Noida Expressway due to construction of major Under Pass) Noida
CS for AE of Const. of 4L South East Bypass for Azamgarh City connecting NH28 at exist Ch. Km 218.800 to Purvanchal Expressway at exist Ch. Km 247.850 TL 14.905 Km in UP on EPC Mode
Work of supply and installation of electrification, fire fighting networking and DG set in the construction of administrative building of Cyber Police Station at Pocket C Sector 20 Yamuna Expressway Industrial Development Authority in Police Commissi
Development of Fuelling Area (Category WSA-WF) at WSA sites with works at location WSA LKE RHS LKE Pkg-2 60 300 RHS UP on Lucknow Kanpur Expressway Dist. Unnao under Kanpur DO of UPSO-I
Under District Gorakhpur, Construction of CC road from Hanuman Mandir Highway to Ramakant Ki Hut in village Betaua, Lot No 2
M/o Green belt and RSP , 02 year maintenance Express Highway 5.00 to 10.00 Km Service Road and Green Belt LHS
M/o RSP and Green belt along with Express Highway 00.00 Km to 5.00 Km LHS Service Road , two year maintenance.
Renewal of Diwanganj Devigarh, Moti Ka Purwa,Bhaisana Katehati Hanumangadhi Bazar via Sedhha Dhanapur Highway road (Year 2024-25) (Length 2.800Km)
Block Moradabad ke gram Godhi me Mohammad Umar Haji ji ki chakki se Moradabad highway Ring Road tak Mitti Khadanja karye
Construction Of C.C. Road From Raja Ka Taal Road Near Of Maharaja Agrasain Dham To Agra - Delhi Highway, Block- Tundla, Firozabad.
SIRKONI GRAM SABHA MAHARUPUR (MADAIYA) NAYE HIGHWAY SE MADAIYA INTER LOCKING TAK EVAM AMOD, AKHILESH CHAUHAN KE GHAR KE TARAF LEPAN
M/o RSP and Green belt along with Express Highway 10.00 Km to 15.00 Km RHS Service Road , two year maintenance.
WARD NO 22 MOHALLA KHELKALAN MEIN RAMRA ROAD PAR JAHID KE MAKAN SE PANIPAT HIGHWAY TAK COVERED R.C.C NALA NIRMAN KARYA
Under District Ambedkarnagar, Const. of CC Road at Village Gokula Baskhari from Mansharam House to NH 233 Highway Lot No 2
M/o RSP and Green belt along with Express Highway 10.00 Km to 15.00 Km RHS Service Road , two year maintenance.
Construction of Culvert At COD Nala In front of navin morrum mandi kanpur-hamirpur highway road ward 87 under zone 3
4. Construction work of drain and interlinking road from Puranpur Highway Verma Tiles to Amit Dixit house in Baba Charandas Colony
Construction of Road and Drain from Ahamau in Sultanpur Highway at Gulab Hostel to Lucknow Law College ke aage Puliya tak
VIDHYAK NIDHI 2023-24 KE ANTARGAT CONSTRUCTION OF samart chandra gupt mourya dwar at near aryan inn highway entry of lalitpur
M/o RSP and Green belt along with Express Highway 5.00.00 Km to 10.00 Km RHS Service Road , two year maintenance.
D/o Green belt , Express Highway LHS AND RHS with two year maintenance in front of Village Mohiyapur Nalgarha AND Jhatta.
M/o Green belt and RSP , 02 year maintenance Express Highway 5.00 to 10.00 Km Service Road and Green Belt LHS
Construction work of four-lane road from two-lane road from highway bypass to Civil Enclave Terminal (O.D.R.) in Saharanpur district.
Nagar Palika Parikshad Pukhranya Ward no 01 (Shiva ji nagar) Indra Nagar Construction of interlocking Road From Pukhrayan Highway To Hospital.
Construction work of drain from Sukhi ka Dibba towards Dayaram house near the highway road in development block Birdha village Bamraula.
Construction of Road and nali at Nagar Nigam Ward Bahadri gram malak chaturi prayagraj Faizabad highway to Dr Meena Patel house
Construction work of 400 meter interlocking from Ballia Sultanpur Highway to Dara Singh house in Development Block Sodhi Gram Sabha Suris
WARD NO 13 RADHA SWAMI NAGAR RAIBAREAILY HIGHWAY BLUE WORLD FACTORY BAGAL SE BCC HEIGHT NALI VA CC SADAK KA KARYA
Construction work of Ekdala Highway Hanumangunj Road to Bind Basti Hote Hue Pushpendra Bind ke Age Mukhya road Tak Link Road
LINE 04 BILARI SHAHABAD HIGHWAY PER BAJAR SE BABULU KI DUKAN KE SAMNE E STORE INDIAN TAK RCC NALA NIRMAN KARYA
Harsingpur mein Bhola Dube ke Ghar se Highway se Rambabu Sonkar ke ghar jaane wale Marg per CC road ka Nirman
M/o Sewerage (P/L Sewer Line, Making Sewerage Connection for Indian Academy of Highway Engineers (IAHE) in Sector-62) Noida
Year 2024-25 Construction work of 4 lane road from village Asalatpur Jarai to Baniyakheda Highway for Hindustan Industrial Place Park.
Gram Rampura me hari singh khadagbanshi ke makan se jharveer mandir se hokar bamneta highway tak nayi sadak ka nirman karya
Construction of residual CC road on the road leading to the highway in village Majhagawa of Rani Ki Sarai development block