Loading…
Loading…
4,636 results • Best match
Development of 6Lane AC Highway from Adhoya Musalmana Ambala dist to Sadopur Ambala dist from Ch. 84.400 to 121.786 of Shamli Ambala sec of Bareilly Ludhiana EC on EPC under BMP Ph-1 in Haryana Pkg3
Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-I from Hridaipur (km 0.000) to Shahapur (km 42.500) on EPC Mode in the state of Uttar Pradesh
Construction of 6lane Greenfield Varanasi-Ranchi-Kolkata Highway from Jn with NH20 in Bongabar village to Jn with NH320 in Lepo village from km 325.500 to km 358.500 under BMP in Jharkhand on HAM (Package 12)
Damaged Poles on Highway and roads
From Highway Bypass upto Munsif urt
Request for Proposal (“RFP”) issued by NHIT Western Projects Private Limited (NWPPL) for Engagement of Agency/Firm for Design, Supply, Installation, Testing, and Commissioning of Drip Irrigation System in Median for Agra Bypass Highway Project of NWPPL
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with Chandauli-Chainpur Road near Khainti village to junction with Bhabhua-Adhaura road near Palka village (Km.27.000-Km.54.000) under BMP in Bihar on HAM
Cutting, Repairing and Painting of old Tree Guards of various Sector (KP-1, 2, 3, Techzone, Chi, Phi, P-3, P-4, Ecotech-6, Highway, IT City, Builders Area, GBU, including road side etc.) in Greater Noida.
Under road safety in the financial year 2023-24 in Ghaziabad district, short-term improvement work of black spot number BS-5800 (2021) of Rajendranagar roundabout on Gyani Border to Mohannagar road (urban part of Highway 24)
Development of of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under BP from Design Chainage 56.500 (Vill-Karaunda Mahajan) to Design Chainage 82.000 (Vill-Khyawari) in UP on EPC Mode (PKG-III).
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from Anarbansalea village to Sagrampur village (From KM. 151.200 to KM. 184.700 Pkg-7 Total Length 33.50 Km) under Bharatmala Pariyojana in the state of Bihar on HAM
Operation and Maintenance of 6-lane Badarpur Elevated Highway (including service roads ramps approaches PUPs toilets and Parks) on Delhi-Agra section of NH-2 from Km.16.100 to 20.500 in the State of Delhi and Haryana
Development of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 27.000 (Vill-Lohadda) to Design Chainage 56.500 (Vill-Karaunda Mahajan) in UP on EPC Mode (PKG-II)
IE Services for Supervision of Const. of 6lane GF Varanasi-Ranchi-Kolkata Highway from Deoria vill. to junc with NH20 in Bongabar viLL from km253.000 to km325.500 under Bharatmala Pariyojana in the State of Jharkhand on HAM
Construction of underpasses at 5 blackspot locations in the project highway at specified locations from Ch. 23.600 to Ch. 149.900 of NH34 (Old NH91) from Ghaziabad to Aligarh on EPC Mode in the State of Uttar Pradesh
Development of 6Lane AC Highway from Ranipur Barsi Saharanpur dist to Adhoya Musalmana Ambala dist Ch. 45.500 to 84.400 of Shamli Ambala sec of Bareilly Ludhiana EC on EPC under BMP Ph-1 in Haryana Pkg-2
Providing and fixing of Welded mesh fencing on both side of MCW, Cattle catcher at entry/exit of Interchanges and MBCB work on both side of electric poles in Median for safety under Road Safety works for Traffic on Agra-Lucknow access controlled (gre
Hiring of Five no. of High Roof Ambulances (Tata Winger/ Force Traveller/SML ISUZU or Equivalent make High Roof, 2018 Model or later, having AC with Heater and Advanced Category of Life Support Equipment. Minimum height of the Ambulance 2500MM)
Widening and Strengthening Work of Prayagraj Highway (A.H.-1) from Narwal Modh to Saadh via Kanpur Connect to the Defense Node with 04 lanes (Including 5 Years maintenance cost) in Distt Kanpur Nagar under Bithoor and Maharajpur Constituency
Engagement of user fee agency through e-quotation for 6lane access controlled GF highway of Delhi Saharanpur Dehradun Economic Corridor under Bharatmala Pariyojna for Phase-I (NH-709B) from Akshardham to Junction of EPE at Baghpatto Saharanpur Bypass
Construction of 6-lane Greenfield Varanasi Ranchi Kolkata Highway from Donoreshan village to junction with NH20 in Bongabar village from km 288.600 to km 325.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (PKG11)
Development of six- lane access-controlled highway from design chainage 0.000 (Ganespur) to design chainage 8.130 (near Mohand) of Ganeshpur Dehradun section of NH-72A in the state of Uttar Pradesh under Bharatmala pariyojana (Package1) on EPC mode
Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana-Shamli-Muzaffarnagar Miranpur Bijnor at Kotawali to two-four lane in the State of UP on EPC Mode Pkg-IV (Bijnor to Kotawali NH-709AD)
Development of Six-Lane Access Controlled Highway from Gogwan Jalalpur to Ranipur Barsi (from Ch.(000.600) to 45.500) of Shamli-Ambala section of Bareilly-Ludhiana EC under BMP Phase-I in the State of Uttar Pradesh (Package-1)
Survey Investigation and designing Hydrographic Hydraulic Structural etc of Construction of Drain From Lakshmi Gate to STP Plant to Sudha Vihar Colony Gate no 2 to Highway in Jhansi including supply of all material labour Tand P etc
Development of 6 lane access control greenfield highway of Delhi-Saharanpur Dehradun economic corridor under BMP from Design Chainage 82.000 Vill-Khyawari to Design Chainage 119.068 (Vill-Latifpur at Saharanpur Bypass) in UP on EPC Mode (Package-IV)
FOR LINE SHIFTING OF CHANAGE NUMBER 255/467 LOOP AREA GANGA EXPRESSWAY UNDER EDD-JALALABAD UNDER UNDER EDC SHAHJAHANPUR (MVVNL)
Shfiting of 33kv, 11kv, LT Line and other works in the way of Ganga expressway in area of EDD-Garh
COLLECTION OF USER FEES AND OPERATION OF TOLL PLAZAS ALONG WITH DEPLOYMENT OF AMBULANCES AND PATROL VEHICLES ALONG BUNDELKHAND EXPRESSWAY
Selection of a Contractor for Maintenance of Agra-Lucknow Expressway, its Service Roads, Structures, all appurtenances and Project facilities etc.
AS PER BOQ
AS PER BOQ
AS PER BOQ
As per SOW
As Per Attatched Document
AS ABOVE
Consultancy Services for AE(i)Improvement and Upgradation of Highway starting configuration- Muzaffarnagar to Miranpur pkg-III Phase-VII (ii) Two-four lane with paved shoulder configuration-Bijnor to Kotwali pkg-IV in UP under NHDP Phase-VII
Construction of Widening of existing 4-lane Highway 7.5m(Average) width to 10m width from 0.000 (Design Chainage) to Km 4.200 (Design Chainage) on Kanpur to Kabrai Section of NH-86 in the state of Uttar Pradesh- 3rd call
Const. of 4L highway from Barabanki ch. Km 0.000 to Mustafabad ch. Km 43.030 Existing Ch. Km 0.000 to Ch. Km 43.700 on the section of NH-927 in Uttar Pradesh on HAM Mode under NH(O) Scheme PKGI
Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-III from Pindari (km 78.150) to Rawalganj Bypass (km 117.120) on EPC Mode in the state of Uttar Pradesh and Bihar
Engagement of user fee agency through e-quotation for Siwaya Fee Plaza located at km 75.990 for 4laning divided highway of Meerut Muzaffarnagar Section of NH-58 from Km. 52.250) to Km.130.560 in the state of Uttar Pradesh
CONSTRUCTION WORK FROM SITAPUR HIGHWAY TO BNCET COLLEGE
CL MATHIYAPURWA BAHCAICH ROAD (HIGHWAY SE 220 DOOR)
G.T. road Highway se kakrabad sampark marg ka anurakshan karya, Kunwarpur road se mandi samiti road se Jafarabad tak marg ka anurakshan karya, chaudagara marg se korsam mavaiya sampark marg ka anurakshan karya, G.T. road se pariharan Dera hote huye D
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with Bhabhua-Adhaura road in Bhairopur village to Konki village (from Km.54.000-Km.90.000 Pkg-3 Total Length 36Km) under BMP in the state of Bihar on HAM
Quantum of work for Construction of 11 KV new Line required for connecting NH highway to Ram milan tubewell and Rameshwar temple to Audhar Baba of Bighapur Town of EDSD-Bighapur under Division-III, Purwa Unnao. against sanctioned package no
New connection 450 KVA HV-2 applied on Nivesh Mitra portal under Electricity Distribution Division, Muradnagar, M/s Prakash Asphalting and Tall Highway India Ltd., Prof. Shri Jai Prakash Verma, Milk Chakarpur Muradnagar, Ghaziabad, 450 KVA HV-2 new c
WORK OF DETAILED SURVEY AND SOIL TESTING FOR HEIGHT RAISING / SHIFTING OF TOWER (LOCATION No. 121-122) OF 400 KV GORAKHPUR-AZAMGARH LINE BEIGH INFRINGED IN THE CORRIDOR OF RAMJANKI MARG PROPOSED BY MINISTRY OF ROAD TRANSPORT AND HIGHWAY, GORAKHPUR UN
The shifting of 11 kV LT lines poles and distribution T F which obstruct the road-widening and strengthening the road from NH-135 Dagmagpur to the Indian Oil Terminal Hinauti into a four-lane highway under the EDD Chunar Mirzapur
Development of six lane access controlled in Uttar Pradesh portion of Delhi Saharanpur Highway from Delhi/UP Border to EPE Junction (Ch.14.750 to Ch. 31.200) in Uttar Pradesh on EPC mode under Economic Corridor in phase1 of Bharatmala Pariyojana