Loading…
Loading…
11,213 results • Best match
Damda-Chakoltore-Daradi-Kenda-Manbazar Road (SH-5) from 24.00 kmp to 32.00kmp, Surfacing work under Purulia Highway Division, in the district of Purulia. Project ID PD212243778S000. 3rd Call
Replacement of existing damaged Hume Pipe Culvert with 1200 dia NP4 HP culvert (Ch. 1.324km) of Poktapole - Dasagram Road under Midnapore Highway Division in the District of Paschim Medinipur
Simulia-Salar-Kagram Road from 0.00 Km to 3.30 Km and 7.445 Km to 10.37Km, Repairing work under Murshidabad Highway Division-II in the district of Murshidabad. (2nd Call)
Diversion work of Sahibgaunge- Majhipara Bridge at 11th Km of Mahinagar- Debpur Road under Asansol Highway Division in the district of Paschim Bardhaman. Ch. to-Plan Head.2nd call.
Dhulagarh Domjur via Begri Road from 2.60 km to 6.341 km, Restoration work of PHE Cutting for laying pipe line under Howrah Highway Division in the District of Howrah
Balance work of Kotwali Ferryghat to Pukuria Ferryghat Road, from 6.00 kmp to 13.80 kmp, Widening and Strengthening under Malda Highway Division, in the district of Malda (2nd Call).
Strengthening of Gopalnagar Chowberia - Ukhra Road from 0.00 Kmp. To 23.00 Kmp. Under Barasat Highway Division No.II in the District of North 24 Parganas under RIDF-XXVII. (2nd Call)
Moydah-Khakurdah-Beliachandi Road from 0.00 Kmp to 8.00 Km, Restoration in patches with surfacing work Under South 24 Parganas Highway Division in the District of South 24 Parganas.
Repairing work of Bogula-Nonaganj road from 7.50Kmp to 9.00Kmp under Nadia Highway Division No-I,P.W. (Roads) Dte. in the District of Nadia During the year 2023-2024
Rafipur Padmalavpur Kakinara road from 3.00 kmp to 8.00 kmp temporary restoration work by brick stitching under Barasat Highway Division No II in the district of North 24 Parganas
Bridge over river Jarda at ch. 2.5 km of Maynaguri Changrabandha to Jalpesh temple Road, Rehabilitation works under Jalpaiguri Highway Division in the district of Jalpaiguri. Project ID PD202132951S000
Tapan to Kardaha road from 0.60 Km to 8.145 Km, patch repairing works under Dakshin Dinajpur Highway Division, in the District of Dakshin Dinajpur, during the year 2020-21.
G.T. Road to Talandu Railway Station from 0.00 kmp. to 1.43 km., Widening and Strengthening work under Hooghly Highway Division No.- II in the district of Hooghly. (3rd Call)
Link Road from Bhatar -Samanti road to Burdwan Katwa Road from 0.00kmp. To 3.35km. Through bituminous surfacing work under Burdwan North Highway Division in the dist of Purba Bardhaman
Rajagram Bridge Approach Road between ch 0.00 kmp to 0.500 km in stretches Maintenance and Repairing Work under Bankura Highway Division , P.W. Roads Dte. In the District of Bankura
Sitai Kayeterbari Road from 0.00 kmp to 2.170 kmp , Patch repairing and surfacing (in streches) under Coochbehar Highway Division in the District of Coochbehar during the year 2020-21.
Emergent Rain Damaged repair work (Bituminous) in different stretches of Gopiballavpur - Nayagram Road, from chainage 37.00 Kmp to 41.60 Km under Jhargram Highway Division in the district of Jhargram.
Link Road to Hetampur- Rajbati from 0.00 kmp. to 1.70 km, Improvement work under Birbhum Highway Division No. II in the district of Birbhum. Ch. to.- State Development Schemes.
Kadma Panighta Road, from Ch 1.00Kmp to 4.00 Kmp bituminous patch repair works (in stretches) under Darjeeling Highway Division in the district of Darjeeling during the year 2025-26.
Hotor-Amratala Road from 0.00 kmp to 4.50km, Repair and Restoration work in patches under South 24 Parganas Highway Division in the district of South 24 Parganas.(SL-04)
Rejinagar - Sarbangapur Road from 0.50 km. to 1.50 Km. and 8.00 Kmp. to 10.50 km repairing work (in stretches) under Murshidabad Highway Division No.I. during the year 2026-2027.
Jamaldah to Ranirhat road from Ch. 0.00 kmp to ch. 5.00 Kmp (in stretches) Patching and repairing potholes work under Cooch Behar Highway Division in district of Cooch Behar.
Bhebia Bazar to Sirishtola Road via Dakshin Bhebia from 0.80 kmp to 9.00 kmp, Surfacing work under Barasat Highway Division No. I in the District of North 24 Parganas.
Maintenance and repairing of Ramchandrapur Health Centre Road between CH 0.00 Kmp to 4.50 km in stretches under Bankura Highway Division, P.W. Roads Directorate in the district of Bankura.
Sahebbarihat Village path from 0.80km to 5.50km emergent restoration work of road side damages due to heavy rainfall under Cooch Behar Highway Division in the district of Cooch Behar
Repairing of Bridge at 1st km. of Galigram-Kutruki-Chandipur Road under Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman, during the year 2024-25
NJP TO BHUTKI ROAD FOR EMERGENT REPAIRING OF POTHOLES AND DAMAGED ROAD SURFACE (IN STRETCHES) FROM CHAINAGE 0.00KM TO 1.50KM UNDER JALPAIGURI HIGHWAY DIVISOION DURING TE YEAR 2023-24
Keorapukur-Julpia Road from 4.00 kmp to 10.00 kmp , Patch Repair under South 24 Pgs. Highway Division in the Dist. of South 24 Parganas during 2020-2021. (2nd Call)
Gondermore to Sahudangi road foe emergent repairing of potholes and damaged road surface (in stretches) from chainage 5.50km to 7.10km under Jalpaiguri Highway Division during the year 2024-25
Mungpoo Rambhibazar Road from 8.40 Km to 9.00 Kmp emergent reconstruction of drain in stretches under Darjeeling Highway Division in the District of Darjeeling during the year 2023 24.
Emergent restoration of Alipurduar end Approach road at 17.50 Km Culvert of Alipurduar-Kumargram road under Alipurduar Highway Division in the district of Alipurduar during the year 2025-2026.
Minor Bridges at 91.35 Km.,91.60 km.,93.11 km. of Ramjibanpur-Ketugram-Katwa Road (SH-6) , Rehabilitation work under Burdwan North Highway Division in the district of Purba Bardhaman.
Supply and Plantation of Avenue trees along the road side flanks of Hiramoti Gurudevpur road from 0.00 kmp to 2.40km under Jalpaiguri Highway Division during the year 2019-20.
Habra-Prithiba Road from 5.790 Km to 6.00 Km, Widening and Strengthening with Concrete Paver Block under Barasat Highway Division No. II in the district of North 24 Parganas.
Emergent replacement of damaged culvert by providing 2.50 M span slab culvert at 2.70 Km of Burwan-Belgram Road under Murshidabad Highway Division No.II in the District of Murshidabad
Hiring of 01One nos Wooden Hull Luxury Launch with Crew and Operating Staff at Lot No. 8 of Kakdwip for ferrying to Sagar Island under Diamond Harbour Highway Division
Abhirampur-Paraj-Kolkol Road 2.00kmp. to 6.50kmp., emergent patch repair work under Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman during the year 2022-23
Kalaberia - Pirakata - Dhansole - Lalgarh Road from 12.00 kmp to 25.00 kmp, Surfacing work under Midnapore Highway Division, P.W (Roads) Dte., in the district of Paschim Medinipur. Project ID PD212246224S000
Dismantling of existing abandoned diversion road to clear the waterways beside Rupai Bridge at 8.489 Km of Jhalda-Bagmundi Road under Purulia Highway Division in the District of Purulia.
Chakoltore - Barabazar Road, from 10.00 kmp. to 23.10km., surfacing work including new construction of 6.0 nos. damaged cross drainage scheme under Pirulia Highway Division in the district of Purulia.
Gadli bridge to Khaterbari road, from 0.00 km to 4.32 km, embankment protection by providing bamboo walling and boulder sausage, under Coochbehar Highway Division in the District of Coochbehar.
Kobla Bridge over Chuni Khal at 1.700 Km of Nimtala Bazar Baidyanagar Road, Reconstruction of bridge under Burdwan South Highway Division in the district of Purba Burdhaman. (2nd Call)
Kolkata-Basanti road from 29.00kmp to 60.00kmp, Emergent repairing of Bituminous portion in patches under South 24 Pgs. Highway Division in the Dist. of South 24 Parganas.(2nd Call)
Construction of Temporary pandel and wooden platform etc. at Banganagar Bus Buffer zone on the occasion of Gangasagar Mela - 2026 under Falta E.P.Z. Highway Sub Division, P.W. (Roads) Directorate
Painting parapet, Crush barrier, Guard post and Jungle cutting from Sirkabad-Ajodhya-Bagmundi Road from 0.00 Kmp to 14.00 Kmp under Purulia Highway Division in the District of Purulia.
Construction of Kitchen shed attached to the guard room within the campus of the Office of the Executive Engineer Barasat Highway Division II PW Roads D during 2025 2026
Gondermore to Sahudangi road for emergent repairing of potholes and damaged road surface (in stretches) from chainage 3.00km to 5.00km under Jalpaiguri Highway Division during the year 2024-25
Dinhata Balarampur road from 7.00 km to 12.00 km, Emergent rain damage repairing work (by brick stiching) (in stretches) under Coochbehar Highway Division in the district of Cooch Behar.
Joynagar- Moydah- Jibonmondalhat Road from 0.00 Kmp to 9.00 Kmp - Strengthening work under Diamond Harbour Highway Division in the district of South 24 Parganas under RIDF-XXVI. 2nd Call.
Salbari High school to Salbari Cold storage road from 0.00 Kmp to 4.50 Km, Surfacing work under Jalpaiguri Highway Division in the district of Jalpaiguri. Project ID PD 222365483S000.