Loading…
Loading…
11,214 results • Best match
Recovery and Restoration of road and embankment at Ch. 3 35 km of Nagrakata-Chengmari Road due to excessive rainfall under Jalpaiguri Highway Division in the district of Jalpaiguri
NJP to Bhutki road for emergent repairing of potholes and damaged road surface (in stretches) from chainage 1.30km to 2.10km under Jalpaiguri Highway Division during the year 2024-25
Sirkabad-Ajodhya-Bagmundi road from 14.00 Kmp to 21.00 Kmp Repairing work with premix surfacing and seal coat in stretches under Purulia Highway Division in the district of Purulia.
SAHUDANGI TO BELACOBA ROAD FOR EMERGENT REPAIRING OF POTHOLES AND DAMAGED ROAD SURFACE (IN STRETCHES) FROM CHAINAGE 0.00KMP TO 2.00KMP UNDER JALPAIGURI HIGHWAY DIVISION DURING THE YEAR 2023-24
Fatapukur to Gadra road from chainage 4.20kmp to 6.40km for emergent repairing of potholes and damaged road surface (in stretches) under Jalpaiguri Highway Division during the year 2024-25.
Bhagwanpur Paschimbar Road from 0.00kmp to 6.70km, Surfacing work including protective and drainage work under Tamluk Highway Division in the district of Purba Medinipur. Project ID PD232400821S000. 2nd Call
Kurseong - Pankhabari road at chainage 6.95 Km construction of guard wall alongwith road safety measure work under Darjeeling Highway Division in the of Darjeeling during the year 2022-23.
Rampur Bridge over Chaita Khal at 5.40Km. Of Chandpara-Nahata-Akaipur Road Rehabilitation Work under Barasat Highway Division No-II in the district of North 24 Parganas.(2nd Call)
Road safety work by Traffic calming measures at the junction of Hinjuri More of Bishnupur Patrasayer Road and Link Road under Bankura Highway Division in the district of Bankura
Mungpoo Rambhibazar Road-Restoratio of disastrous land slide at Ch 8.95 Km in Khad side under Darjeeling Highway Division in the district of Darjeeling during the year 2024-25
Gurudasnagar Railway Station to Diamond Harbour Road from Ch. 0.000 kmp to Ch. 2.85 Km, Strengthening work Under Diamond Harbour Highway Division in the District of South 24 Parganas.
Kolkata Basanti Road from 0.700 Km to 29.00 Kmp, renewal of wearing Surface (P R Works) under South 24 Parganas Highway Division in the district of South 24 Paragans.
Restoration of underground drinking water distribution pipeline due to widening and strengthening of Balarampur to Bagmundi Road (0.0KMP to 26.00 KMP) by Purulia Highway Division P. W. Directorate in
Garidhura-Mirik-SimanabustyRoad, construction of wall at ch. 35.15 km damaged due to heavy rainfall under Darjeeling Highway Division in the district of Darjeeling during the year 2024-2025.
Gondermore to Sahudangi road for emergent repairing of potholes and damaged road surface (in stretches) from chainage 0.00kmp to 2.00km under Jalpaiguri Highway Division during the year 2024-25
Emergent road restoration works at Ch. 3.40 km (both side) of Nagrakata to Chengmari Road under Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2025-26
Matigara-Kurseong Road chainage from 12.50 Km to 15.00 Km Restoration of flank in stretches under Darjeeling Highway Division in the district of Darjeeling during the year 2023-24.
Bridge over River Nuni at Sitladanga Road, Construction work in replacement of the existing damaged narrow Bridge under Asansol Highway Division in the district of Paschim Bardhaman. (2nd call)
SAHUDANGI TO BELACOBA ROAD FOR EMERGENT REPAIRING OF POTHOLES AND DAMAGED ROAD SURFACE (IN STRETCHES) FROM CHAINAGE 5.00KMP TO 7.00KMP UNDER JALPAIGURI HIGHWAY DIVISION DURING THE YEAR 2023-24
Bodra Champahati Road from 0.00 Kmp to 15.00 Kmp Strengthening work under South 24-Paragans Highway Division in the District of South 24-Paragans under RIDF-XXVI. (2nd Call)
Rajagram Bridge approach Road, Rajagram Bridge at 1.20 km and a minor Bridge at 1.50 km, Rehabilitation and protection work under Bankura Highway Division in the district of Bankura.
Julpia-Chakdah hat Road from 8.00 Kmp to 12.895 km, Pre monsoon repairing and maintenance work under South 24-Parganas Highway Division in the Dist of South 24-Parganas.
Emergent Pothole Repairing Work of Link Road to Kaljani Health Centre Road, in Stretch Between 0.00 km to 2.00Km, under Cooch Behar Highway Division in district of Cooch Behar.
Mirik Bye Pass from Kmp 0.00 to 3.30, Clearing of drain, slip and jungle cutting under Darjeeling Highway Division in the district of Darjeeling during the year 2026-27.
Chalsa Metelli Road from Ch. 1.80 km to 1.91 km construction of Paver Block shoulder under Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2024-25.
Randhamali to Bodaganj Road from ch. 4.50kmp to 6.30kmp for emergent repairing of potholes and damaged road surface (In stretches) under Jalpaiguri Highway Division during the year 2024-25.
Garidhura-Mirik-Simanabusty Road from chainage 5.50 km to 13.95 km, Road safety measure work under Darjeeling Highway Division in the district of Darjeeling during the year 2025-26
Matigara Kurseong road clearing of drain and white washing from 15.00 kmp to 21.00 Kmp under Darjeeling Highway Division in the district of Darjeeling during the year 2023-24
Uluberia Boaliaghat Road from 5.00 Km to 7.00 Km Patch Repairing Flank Restoration work under Howrah Highway Division in the District of Howrah for the year of 2025-26
Chalsa Metelli Road from Ch. 7.80 km to 8.00 km construction of CC Block shoulder under Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2024-25
Keder Roy Road 5.30km to8.30km patch repairing work in stretches under Mollarpur Sub-Division of Birbhum Highway Division-I in the district of Birbhum during the year 2024-2025.
NJP to Bhutki road for emergent repairing of potholes and damaged road surface (in stretches) from chainage 0.00kmp to 1.30km under Jalpaiguri Highway Division during the year 2024-25.
Amgachhia Health Centre Road from 0.00kmp to 0.975km, Patch repairing work in different stretches under South 24 Parganas Highway Division in the Dist. of South 24 Parganas.(SL-03)
Bibirhat- Gotalahat Road from 0.000km to 4.200kmExcept 1200 m Mastic Surface and 5.70km 6.10km, Surfacing work under South 24-Parganas Highway Division in the district of South 24-Parganas
Padmarhat-Mograhat Road from 0.00 kmp to 4.00 km, Emergent repairing work in patches under South 24 Parganas Highway Division in the Dist. of South 24 Parganas..(2nd Call)
Bhungkulung Soureni Road, Emergent mixed slip clearance alongwith other allied works from 0.00 kmp to 7.60 kmp necessitated due to heavy rainfall under Darjeeling Highway Division during 2020-21.
Restoration of damaged Sausage Crates at 4th km of Bamihati Idgah to Dakshin Sarai Idgah road under Habrat Highway Division No. II. in the dist. of North 24 Parganas
Restoration of underground drinking water distribution pipeline due to widening and strengthening of Bandwan - Asanpani Road from 0.00 Kmp to 16.00 Kmp by Purulia Highway Division P. W. Directorate
Maynaguri-Domohani road from 2.50km to 4.50km patch repairing works with SDBC and allied works under Jalpaiguri highway division in the district of Jalpaiguri during the year 2020-21.
Preparation of Detailed Project Report (DPR) for strengthening of Berhampore Hariharpara Amtala Road from 0.00 km to 17.00 km under Murshidabad Highway Division No.I in the District of Murshidabad
Bishnupur-Sonamukhi-Rangamati Road, 0.10 km to 0.40 km, Construction of storm water drain under Bankura Highway Division in the district P.W. (Roads) Directorate in the District of Bankura.
Kuli-Moregram Road from 12.00 Km to 13.00 Km by mending potholes and depression by stitching picked jhama bricks (in Stretches) under Murshidabad Highway Division No.II during 2023-24
Garidhura Mirik Simanabusty Road from 26.00 to 35.00, Clearing of drain, slip and jungle cutting under Darjeeling Highway Division in the district of Darjeeling during the year 2026-27
Sabrakone Morar Road Repairing Wing wall and other allied of Culvert at Ch. 11.80 km. and painting of other culvert under Bankura Highway Division in the district of Bankura
Construction of RCC Box drain at Ch 17.950 km, 18.020 km of Midnapore Keshpur Road at 13 Mile village under Midnapore Highway Division in the district of Paschim Medinipur
Mahinagar Debpur Road, Construction of Bridge over Irrigation Canal at 11th km under Asansol Highway Division, in the district of Purba Bardhaman. (2nd call) Ch. to.- State Development Schemes.
Huslurdanga-Sustirhat road from 7.50km to 10.00kmp and Huslurdanga Bazar portion for patch repairing work under Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2020-2021.
Patch repair works on Panrui-Bramandihi-Koyra Road (MDR) from 6.00 kmp to 11.00 kmp in stretches under Birbhum Highway Division -II , in the District of Birbhum(2nd call)
Garidhura-Mirik-Simanabusty Road from 14.00 Kmp to 16.00 kmp bituminous patch repair in stretches under Darjeeling Highway Division in the district of Darjeeling during the year 2022-23
Budpur-Payrachali Road from 0.00 kmp. to 7.00 kmp. Surfacing Work and construction of cross drainage structures under Purulia Highway Division in the district of Purulia. (Project ID- PD192011943S000)