Loading…
Loading…
11,213 results • Best match
Maintenance and repairing work of Simlapal Sarenga Bamundiaghat Road from CH 23.00 KMP to 30.50 KM in stretches under Bankura Highway Division in the District of Bankura (2nd Call).
Surjopur-Dhamua Road from 1.00 kmp to 5.00 kmp, Emergent patch repairing work under South 24 Parganas Highway Division, P.W (Roads) Dte. in the District of South 24 Parganas.
Bamandanga to Pumlia Road- from 0.00 kmp to 2.95 kmp - Emergent potholes repairing work in stretches under Habra Highway Division No. II. in the dist. of North 24 Parganas
Jalpaiguri to Choulhati road, maintenance work from chainage 1.00Kmp to 3.00Kmp, 4.00kmp to 7.50Km and 8.50km to 10.50km (stretches work) under Jalpaiguri Highway Division during the year 2021-2022
Polba Keswara road 0.00 km to 5.14 km, Widening and Strengthening work under Hooghly Highway Division No.- I, P.W.(Roads) Directorate in the District of Hooghly under RIDF-XXX
Kolkata-Basanti road from 42.00kmp to 55.00 kmp (except rigid pavement portions) Emergent patch repairing work under South 24 Parganas Highway Division in the District of South 24 Pgs.
Sreepally Bajitpur Road from 0.00 kmp to 21.00 kmp (Except Mastic Zone 3.1946 km),Surfacing work under Barasat Highway Division No. II in the District of North 24-Parganas.
Emergent repairing of Makdampur Bhatol Road from 0.00 Km to 5.50 Km in stretches under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur During the year 2025_2026
Repairing of RCC slab culvert at 13.85 km of Churaman Itahar Kushmandi Road in the district of Uttar Dinajpur under Uttar Dinajpur Highway Division during the year 2023-24
Panchami- Hatgachia road, Special Repair work from 0.00 Km. to 5.50 Km under Birbhum Highway Division No.-I in the district of Birbhum in the Financial year 2020-2021.
Mungpoo Rambhibazar Road at Ch. 12.00 Km, Improvement of road side drain and protective work under Darjeeling Highway Division in the district of Darjeeling during the year 2024-25.
Estimate for Emergent restoration work of Bus Buffer Zone at Ramjan Nagar under Diamond Harbour Highway Division in the District of South 24 Parganas for ensuing Gangasagar Mela 2025.
Birohi - Parmajdia Road from 0.00 Km to 1.88 Km, Strengthening Work under Nadia Highway Division No.ll, P.W.(Roads) Directorate, in the District of Nadia during the year 2025-2026
Midnapur Keshpur Road (SH-7) from 0.00kmp to 20.550km, (Excluding Rigid Pavement and RUF), Surfacing work under Midnapore Highway Division in the district of Paschim Medinipur. Project ID PD232402306S000.
Feeder Road from STKK Road to Jerat Feeder Road from 0.00 Kmp. to 2.93 Km., Widening and Strengthening Works under Hooghly Highway Division-II in the district of Hooghly.
R.C.C Trestle Bridge over local Khari at 2nd Km of Mahipal Chowrangee more to Kantabari Road, Rehabilitation work under Dakshin Dinajpur Highway Division, in the District of Dakshin Dinajpur.
Repairing of protection work of road side flank at Ch. 1.70kmp. of Buxa-Jayanti Road under Alipurduar Highway Division in the district of Alipurduar during the year 2022-23.
Construction of Bituminous Road Bhebia Gabtala Maji Para 2.00 km. at Hasnabad Block in the District of North 24 Parganas under Barasat Highway Division No-I. (SDB Deposit Work)
Raipur Akkuta More road from ch 12.00 kmp to ch 16.00 kmp in stretches repairing and maintenance work Pre Monsoon under Bankura Highway Division in the district of Bankura.
Sarda Bhujung Road from 0.00 kmp to 3.20 kmp except mastic zone Surfaceing work under Birbhum Highway Division-I in the district of Birbhum during the year 2022-2023
Rehabilitation work of inside portion of hollow box girder of Sarada Setu at 4.385 km of Bishnupur Sonamukhi Rangamati Road under Bankura Highway Division in the District of Bankura
Kabley Moloypur Health Centre Road from 0.00kmp to 8.20 km., Strengthening work under Hooghly Highway Division No.- I, P.W.(Roads) Directorate in the district of Hooghly under RIDF-XXX.
Bebari Bridge over Goborjoti River at Ch. 11.630kmp. of Hasimara-Jaigaon Road - Construction of Diversion by Hume Pipe Culvert and Allied work under Alipurduar Highway Division. (Project Id- PD242529012S000)
Bagnan Mankur Road from 0.00 Km to 9.25 Km,(In stretches) Patch Repair Under Howrah Highway Division in the District of Howrah during 2020-2021 under Non Plan Head
Chagram Dhankol to Patharghata Panchayet office via Choto Baharkuli Sadhupatty, from 0.00 kmp to 5.10 km, Surfacing Work under Burdwan South Highway Division in the district of Purba Bardhaman
Construction of RCC storm water drain and a Box Culvert at Asansol Bypass to Domohani Road at 1.9 km, under Asansol Highway Division in the District of Paschim Burdwan.
Garidhura-Mirik-Simanabusty Road Restoration of landslides at Ch. 16.3 Km due to heavy rainfall under Darjeeling Highway Division in the district of Darjeeling during the year 2025-26.
Sonarpur Kheadah gangajoara Road from 0.00 Kmp to 5.00 Km, Restoration in patches with surfacing work Under South 24 Parganas Highway Division in the District of South 24 Parganas.
Bankura Saltora Road at CH 12.20 Km construction of new Slab Culvert by replacing the existing damaged Slab Culvert under Bankura Highway Division in the district Bankura 2nd Call
Emergent Patch repair work at Madartala - Chayani Bazar Road in stretches from 0.00 Kmp. to 3.00 Kmp. under Barasat Highway Division I in the district of North 24 Parganas
Construction RCC Box Culvert 4.0m X 4.0m (5cell) over river Behula at 1.75 KM of Terabank Patharghata Road under Burdwan South Highway Division in the District of Purba Burdwan.
Construction of (4.0 m X 3.0 m) Single cell Box Culvert at 9.20 km of Aherbelma Pahalanpur road under Burdwan South Highway Division in the district of Purba Bardhaman
Dabra to Iswarpara C.P.W.D Road from 0.00 kmp to 1.33 km, Surfacing work, under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur during the year 2023-24.
Sitai Barthore Road from 0.00 kmp to 4.00 kmp , Patch repairing and surfacing (in streches) under Coochbehar Highway Division in the District of Coochbehar during the year 2020-21.
Hatimore to Ambari-Falakata road from 4.80km to 6.50km (in stretches), for emergent repairing of Potholes and damaged road surface under Jalpaiguri Highway Division during the year 2020-2021.
Sui Bridge over River Sui at Ch. 15.00 km of Churamon-Itahar-Kushmondi Road- Rehabilitation of the bridge under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur.
Rafipur Padmalabhpur Kakinara Road. Emergent repairing of potholes from 10.50 kmp to 13.30 kmp in stretches under Barasat Highway Division No. II in the district of North 24 Parganas
Falardanga Joist Bridge at Ch. 2.140 km of Gadli Bridge to khaterbari Road, Protection and Repairing work Under Coochbehar Highway Division in the District of Coochbehar. Project ID PD232405243S000.
Gopiballavpur-Nayagram Road (SH-9) from 0.00 kmp to 15.00 kmp Repair works in Patches under Jhargram Highway Division in the district of Jhargram, during the year 2020-21.
Belpahari Banspahari Road from 13.00 kmp to 14.00 kmp Repair and Maintenance work in Stretches under Jhargram Highway Division in the district of Jhargram, during the year 2020-21.
Taldangra Panchmura-Chowbeta Road-Balance portion from CH 2.00 kmp to CH 7.00 kmp In stretches , repairing and maintenance work under Bankura Highway Division in the district of Bankura.
Jaldhaka - Ranirhat Road from 0.00 KM to 8.30 KM for Strengthening works under Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2018-19. (Under PLAN head)
Mungpoo Rambhibazar Road, Emergent Restoration of Khadside Side slips along with other allied works at 7.15 km necessitated due to heavy rainfall under Darjeeling Highway Division during 2020-2021.
Construction of 2 X 2 RCC Box Culvert at 4.90 KM of Kholapota - Bhebia Samsan Road under Barasat Highway Division No. I in the district of North 24 Parganas.
Emergent potholes repairing work by brick stitching from 22.40 Km to 22.80 Km of Kalaberia - Pirakata - Dhansole - Lalgarh Road under Midnapore Highway Division in the District of Paschim Medinipur.
Installation of Road Sinage Boards and Markings at different roads under the jurisdiction of Asansol Highway Division in the district of Paschim Bardhaman. 2nd Call. Ch. To- Plan Head.
Garidhura-Mirik-Simanabusty Road chainage 1.00 Kmp to 4.18 km bituminous patch repair in stretches under Darjeeling Highway Division in the district of Darjeeling during the year 2023-24
Maintenance and repairing of Simlapal Sarenga Bamundiaghat Road from CH 9.00 Kmp to 14.00 kmp in stretches under Bankura Highway Division, P.W. Roads Directorate in the district of Bankura.
Installation of Signage Board at Falakata Stack yard Mathabhanga college more stackyard, Bairagirhat Stackyard, Jamaldaha Stackyard, Ranirhat Stackyard, Changrabandha Stackyard and Changrabandha section office under Mathabhanga Highway Sub Divisio
Simulia-Salar-Kagram Link Road from 1.00 Kmp to 3.00 Kmp and 4.00 Kmp to 5.30 Km Patch repair under Murshidabad Highway Division No.II during the year 2020-21