Loading…
Loading…
11,246 results • Best match
RCC Box Bridge (6/54/0) over a canal at 3rd km of Bindol Bhatol Road in replacement of existing HPC under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur.
Fulbari to Dhainagar Road from 0.382 km to 7.150 km and 7.39 km to 13.50 km, Surfacing work under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur, Project ID PD252637143S000
Parui-Batikar Road from 5.730 km to 6.050 km and from 7.60 km to 10.24 km urgent repairing and maintenance (in stretches) under Birbhum Highway Division-II, in the District of Birbhum..
Construction of Bridge over Nokari Khal at 0.75 Km of Ranaghat - Aranghata (Old) Road,in replacement of old bridge under Nadia Highway Division No-II in the district of Nadia.(2nd Call)
Bodra-Champahati road from 0.00 kmp to 2.30 km, Emergent Pot-holes repairing work in patches under South 24 Pgs. Highway Division, P.W.(Roads)Dte. in the Dist of South 24 Parganas.
Nagrakata to Chengmari Road at Ch. 3.65 km to 4.05 kmp, Restoration of road flanks and protection work under Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2024-2025
Repairing of distressed Bridge including restoration of DS apron of the Syphonic Irrigation Bridge at 29.6652 Km of Chandrakona Goaltore Sarenga Simlighat Road under Bankura Highway Division in the District of Bankura
Dabra to Iswarpara C.P.W.D Road from 0.00 Kmp to 1.33 Km (Stretches), Urgent patch repairing work under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur - during the year 2024-25.
Multi cell Box Culvert at 2.40km of Gajoldoba Barrage to Kranti-Odlabri Connector at Bagan Bari More road, renovation and other allied Works under Jalpaiguri Highway Division in the district of Jalpaiguri.
Engagement of 10 (Ten) nos. Security Personnel on purely temporary basis of different categories for guarding at Government Stack-yard, Office etc. under the control of the Executive Engineer, Alipurduar Highway Division
Peshoke Mungpoo Road repair of damaged drops structure, restoration of land slide affected zone at Ch. 0.250 Km under Darjeeling Highway Division in the district of Darjeeling during the year 2025-26.
Installation of Height Bar at Ganthla (at 10.00 Km of Jibanti-Sherpur Road) and Asalpur (at 17.00 Km of Kuli- Moregram Road) under Murshidabad Highway Division No.II during the year 2025-26
Dinhata Balarampur Chilakhana Road from 6.00 km to 12.00 km, Emergent rain damage repairing work (by brick stitching ) under Cooch Behar Highway Division in the District of Cooch Behar during 2024-25
Chora Bhatkunda Mankar Road from 0.00 km. to 3.00 km and 5.00 km to 19.54 km, strengthening work under Asansol Highway Division in the district of Paschim Bardhaman. Ch. to.- RIDF-XXVII
Bridges at 12.20 km and 12.40 km of Shikharpur Kulti Canal Road, Repair and Rehabilitation Work under South 24 Parganas Highway Division in the district of South 24 Parganas. Project-ID-PD252632182S000.
Bediamari-Jibantala Road from 0.700 km to 1.280 km from 1.880km to 6.00 km, Emergent restoration work in patches, under South 24 Parganas Highway Division in the District of South 24 Parganas.
Mahipal-Chowrangee more to Kantabari Road from 5.00 Km to 7.00 Km, Bituminous Patch Repairing Work, under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur during the year 2025-26
Dubrajpur Bakreswar Chandrapur Road from 1.00 Kmp to 4.00 Kmp, urgent repair and maintenance work due to flood / excessive rainfall in patches under Birbhum Highway Division-II, in the District of Birbhum
Supply and Installation of new Air conditioning Machine at Executive Chamber, Establishment Section, Accounts section, Computer Section and Guest House of Burdwan North Highway Division, PW(Roads) Dte-SITC of AC Machine
Bakshi Kulia Road, At 3.6 Km (Right Side), Construction of Safety Wall in front of Ajangachi Primary School under Howrah Highway Division in the District of Howrah during the Year 2025-26
Bhagawanpur Paschimbar Road from 0.00 km to 6.70 km, repairing work by jhama metal consolidation in patches under Tamluk Highway Division in the District of Purba Medinipur during the year 2023 2024
Hiring of One (1) No. Motor Cab/Maxi Cab as Inspection Vehicle on monthly basis for the official use of the Assistant Engineer, Mal Highway Sub Division, P.W.(Roads) Dte., Malbazar, Jalpaiguri
Garidhura-Mirik-Simanabusty Road, Emergent clearance of slip and restoration of landslides at 34.5 due to heavy rainfall under Darjeeling Highway Division in the district of Darjeeling during the year 2025 -2026
Repairing of 2 nos. Bridges at 2nd km. of Galsi-Gohogram Road via Adrahati under Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman, during the year 2024-25
Dhamua-Amratala Road with link to Ranganberia Road from 7.90 km to 10.64 km, Emergent restoration work in patches, under South 24 Parganas Highway Division in the District of South 24 Parganas.
Construction of Road User Fee (RUF) collection Plaza of Midnapore Keshpur Chandrakona Town Road (SH-7) at Ch-17.500km on 12 Mile under Midnapore Highway Division in the district of Paschim Medinipur.
Restoration of Road surface from Ch. 6.60 Km. to Ch. 7.60 Km. (Main carriageway of Airport flank) of KNI Avenue under Barasat Highway Division-I in the district of North 24 Parganas.
Shibpur-Mahipaldighi Road from 3.00 Km to 8.00 Km, Urgent Bituminous Patch Repairing Work in stretches, under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur during the year 2025-26.
Emergent work from Fulbari to Ambari-Falakata road from chainage 0.00kmp to 6.98km Canel side wheel kerb painting and clearing drain garbage works under Jalpaiguri Highway Division during the year 2025-26
Sobha Bridge at 20.530 Km, on Balarampur- Bagmundi Road (SH-4) Restoration of damaged footpath, Protective works, Slope protection works and allied Works under Purulia Highway Division in the District of Purulia.
Beautification of compound at Murarai Inspection Bunglow by preparation of beds for gardening planting of different trees under Birbhum Highway Division- I in the district of Birbhum during the year 2025-26
Fatepur-Dehaband Road from 6.00 Kmp to 12.00 Kmp, Urgent Bituminous Patch Repairing Work in stretches, under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur during the year 2025-26.
Supplying of Security Personnel on purely temporary basis for guarding at different Govt. Stackyard, offices etc. under the control of Executive Engineer, Bankura Highway Division, P.W.Roads Directorate in the district of Bankura
Mungpoo Rambhibazar Road, Emergent Restoration of drops and guide wall at 5.50 Km and 5.20 Km on Downstreams under Darjeeling Highway Division in the district of Darjeeling during the year 2022-23.
Construction of Paver Block Road from Dimdima Bridge Asian Highway to Dangapara via Heaven Shelter Parivar within Sishujhumra G.P under Madarihat Block in the district of Alipurduar.(Length - 1500m and 3.75m width).
Boring of Tube Well including distribution line at All weather helipad at Sagar Island under Diamond Harbour Highway Division in the distict of South 24 Parganas for the financial year 2023-2024.
Mallarpur Majhipara Bolpur Road from 34.00 kmp to 39.00 kmp,urgent repair and maintence work due to flood /exessive rainfall in patches under Birbhum Highway Division -II , in the District of Birbhum.
Supplying of Security Personnel on purely temporary basis for guarding at different Govt. Stackyard, offices etc. under the control of Executive Engineer, Bankura Highway Division, P.W.Roads Directorate in the district of Bankura
Mohisgote Bridge at 7.10 km of Sanjua-Maheshtala Road, Repair and Maintenance of Footpath, railing , painting of Superstructure etc under South 24 Parganas Highway Division in the District of South 24 Parganas.
Nigasai Bridge at Hijla, 23.750 Km on Balarampur-Barabazar-Sindri Road (SH-4), Restoration of Damaged Protective Works, Slope Protection and allied Works under Purulia Highway Division in the District of Purulia.
Kushmandi - Mahipaldighi Road from 0.00 Km to 5.50 Km, Urgent Bituminous Patch Repairing Work in stretches, under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur during the year 2024-25.
Table top speed breaker and road safety work at Maity Gola bus stop chainage 7.00 Kmp on Midnapur - Keshpur Road (SH-7) under Midnapore Highway Division in the district of Paschim Medinipur.
Radahanagar Ghat Bridge over river Jalangi at 34.50 km of Beldanga-Amtala-Patikabari road, Rehabilitation work under Murshidabad Highway Division No. I in the district of Murshidabad during the year 2020-21
Urgent repairing of potholes of Chotomahadev village road from 0.00 kmp to 6.00 kmp (in stretches) under Cooch Behar Highway Division in the district of Cooch Behar during the year 2019-20.
Emergent flood damage repair of Embankment near Khukurdaha Bridge at 9.900 km of Panskura - Ghatal Road (S.H.-4) under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
Mundamari - Pingla - Paramanandapur - Moyna Road from 0.000 kmp to 6.000 kmp and 14.00 kmp to 19.00 kmp, Patch repair under Midnapore Highway Division in the district of Paschim Medinipur during 2020-2021.
Repairing and Painting work of R.C.C. Bridge NONAI at 2.70km. and CHEKO at 3.80km. of Alipurduar-Kumargram Road under Alipurduar Highway Division in the district of Alipurduar during the year 2022-23.
Repair of Khanyan Itachuna Road from 0.00kmp to 3.70kmp Except Mastic Portion 1.50km of C.H.S.D under Hooghly Highway Division No-II in the district of Hooghly during the year of 2024-2025.
Preparation of Detailed Project Report DPR for the work of Dhantala Biprit Road from 9.00 kmp to 12.90 kmp Strengthening work in the district of Uttar Dinajpur under Uttar Dinajpur Highway Division
Hiring of 1 no. Inspection Vehicle on Daily basis for official use of the Assistant Engineer, Suri Highway Sub-Division, P.W.(Roads)Dte. (Mass Emission Standard BS-IV and above Diesel Engine.