Loading…
Loading…
11,246 results • Best match
Link Road from Burdwan-Kalna road to Simlon village road from 0.00 kmp to 2.00 kmp, Surfacing Work under Burdwan South Highway Division In the district of Purba Bardhaman ( Plan, 1st Call)
Maintenance and Repairing of Chandrakona Goaltore Sarenga Simlighat Road in Streaches between 29.00 Kmp. to 31.80 Km and 36.60 Km to 41.40 Km. under Bankura Highway Division in the District of Bankura.
Birnagar Aranghata Road from Ch. 0.00 Km to Ch.2.00 Km Strengthening Works Excluding mastic zone under Nadia Highway Division No II in the District of Nadia during the Year 2025-2026
Panskura Ghatal Road (SH-4) from 2.00 KMp to 33.750 Km, Widening from 2 Lane Road to 2 Lane Road with paved shoulder (10.00 m) and Strengthening works under Midnapore Highway Division
Taldi-Chandaneswar Road from 3.00 to 4.00kmp, Emergent Restoration work in patches damaged caused due to cyclone YAASunder South 24 Pgs. Highway Division in the Dist. of South 24 Parganas.(SL-04)
Restoration of damage of Rautari Teraparajalpai Road from ch. 8.50 km to 9.85 km, caused due to laying of PHE pipe line under Tamluk Highway Division in the District of Purba Medinipur
Peshoke-Mungpoo Road Repairing of damaged parapet wall and colour wash from Ch. 0.00 Kmp to 17.00 Kmp under Darjeeling Highway Division in the district of Darjeeling during the year 2024-25.
Murarai Health centre Road from 0.00 km to 1.50 km and from 4.00 km to 7.00 km Patch repairing work in stretches under Birbhum Highway Division-I during the year 2023-24
Gangarampur- Hamjapur road from 1.50 Km to 12.66 Km, providing and fixing of Road Furniture and Metal Crash barrier, under Dakshin Dinajpur Highway Division, in the District of Dakshin Dinajpur (3rd Call).
Emergent patch repair work of Kalaberia - Pirakata - Dhansole - Lalgarh Road from 12.000 kmp to 15.000 kmp (In stretches) under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
Rain damage repair to Midnapore-Anandanagar-Chandra-Dheruaghat Road from 0.00 kmp to 07.00 kmp under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan / Rain damage repair)
Construction of temporary bus stand at Hardwood point of Kashinagar - Hardwood road under Diamond Harbour Highway Division in the district of South 24 Parganas for ensuing Ganga Sagar Mela 2021. SPOT I
Islampur main town road Old NH31 from 0.00 kmp to 7.65 km Installation of traffic signages road stud etc in stretches under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Construction of Surface storm water drain from 0.00 kmp to 1.50 km, both side of Mirjapur-Kaligram-Kusumgram-Nadanghat-Samudragarh Road under Burdwan South Highway Division in the District of Purba Bardhaman.
Garidhura-Mirik-Simanabusty Road, at chainage 9.80 Km Emergent Restoration at khade side protective work under disaster urgency under Darjeeling Highway Division in the district of Darjeeling during the year 2023-24.
Installation of Signage Board to the Bridges, ROBs and Roads under the jurisdiction of Tamluk Highway Division, P. W. Roads Dte. in the district of Purba Medinipur during the year 2023 2024
Nalhati- Rajgram Road from 0.00 kmp. to 30.80 km, Surfacing work under Birbhum Highway Division No-I, in the district of Birbhum during the year 2021-2022. (Ch. to State Development Schemes)
Gokarna-Chiruti Road from 2.00 Kmp to 4.00 Kmp, 4.60 Km to 4.90 Km and 5.70 Km to 6.50 Km patch repair under Murshidabad Highway Division No.II during the year 2020-21
Restoration of drainage system damaged by different utility providers at Rajarhat -Patipukur Road from chainage 6.50 Km. to 9.580 Km. under Barasat Highway Division - I in the district of North 24 Parganas.
Culvert at 0.2 Km, 0.3 Km and 5.4 Km of Chilakhana Natabari Road, Reconstruction of Hume pipe culvert under Cooch Behar Highway Division in the District of Cooch Behar . Project ID PD222368394S000.
Emergent patch repair work of Bishnupur - Radhamohanpur Rly. Station Road from 3.500 Kmp to 5.000 Kmp (in stretches) under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
Urgent repairing and maintenance of roof and back side at office building of Birbhum IT, Suri NH and Birbhum Mechanical Sub-Division under Birbhum Highway Division-II in the district of Birbhum
Dressing and chilchalling at both side of road flanks from 0.00 kmp to 30.00 kmp of Kachuberia Gangasagar Road at Sagar Island under Diamond Harbour Highway Division for ensuing G.S. Mela - 2023
Rajabhatkhawa-Jaygaon Road from 14.50km. to 17.50km. and from 21.00km. to 24.00km. Patch repairing work in different stretches under Alipurduar Highway Division in the district of Alipurduar during the year 2020-21.
Peshoke-Mungpoo Road Emergent Restoration of disastrous landslide at Ch. 8.220 Km and Ch. 5.100 Km in Khadside under Darjeeling Highway Division in the district of Darjeeling during the year 2024-25
Dhubulia - Mayapur Road from 0.29 Kmp to 11.12 Kmp, from intermediate Lane to 2 Lane with Paved shoulder under Nadia Highway Division No. I, in the district of Nadia under RIDF - XXVI.
Bankura Saltora Road Road from ch. 14.23 km to ch. 14.34 km drainage works by 600 mm dia NP3 Hume Pipe under Bankura Highway Division in the district of Bankura. 2nd Call
Widening and Strengthening from 0.00 Kmp to 28.55 Km of Kuli-Burwan-Gramsalika-Majlishpur-Ramjibanpur Road (SH-7) under Murshidabad Highway Division-II in the district of Murshidabad, West Bengal under CRIF
Additional Road Safety measures around RUF Toll Plaza Complex at 2.50 KM. on Chanditala-Seakhala-Champadanga Road (SH-15) under Hooghly Highway Division No.I, P.W. (Roads) Directorate, in the district of Hooghly
Construction of concrete drain at 4th km of Amdanga-Rautara-Badarhat road (near of Balisha More to MR College) under Barasat Highway Division No. II. in the dist. of North 24 Parganas
Restoration in connection with laying of PHE pipeline from 13.00 km to 16.50 km of Barduary Bindole Road under the Jurisdiction of Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Daulatpur-Harirampur-Dehaband Road from 0.00 Km to 7.00 Km, Rectification of crack portion in stretches, under Dakshin Dinajpur Highway Division in the district of Dakshin Dinajpur during the year 2025-26.
Kalchini-Paitkapara Road from 11.00km. to 14.00km. and from 15.00km. to 17.84km. patch repairing work in different stretches under Alipurduar Highway Division in the district of Alipurduar during the year 2022-23.
Garidhura-Mirik-Simanabusty Road, Emergent Restoration of land slides at ch. 32.9 Km and Construction of box drain under Darjeeling Highway Division in the district of Darjeeling during the year 2025-26.
NH-116B (Digha Foreshore Road) from 84.835km to 86.335km, Widening and Strengthening work from Two Lane to Four Lane Under Tamluk Highway Division in the district of Purba Medinipur. Project ID PD232414650S000.
Dalgaon-Gomtu Road from 4.80kmp. to 10.00kmp. patch repair (By brick on edge) under Alipurduar Highway Division in the district of Alipurduar in the district of Alipurduar during the year 2020-21.
Balighai - Mohanpur Road from 0.000 Kmp to 4.750 Km, in the district of Purba Medinipur for the work of Widening and Strengthening under Tamluk Highway Division, P.W (Roads) Directorate. Project ID PD232404163S000
Jhorer More to Khuribhanga Pumping Station Road from 6.673 Kmp to 7.130 Km, Embankment protection and road restoration work under South 24 Parganas Highway Division in the district of South 24 Parganas
Bishnupur Sonamukhi Rangamati Road from Ch 8.30 km to Ch 8.90 km (in stretches) temporary restoration work due to excessive rainfall under Bankura Highway Division in the district of Bankura.-2nd call
Construction of Box Culvert (6m x 6m) 7cell and approach Ambikanagar-Akkuta More Road RCC at 1st km, including allied works under Bankura Highway Division in the District of Bankura. (2nd Call).
Balance work of maintenance and repairing of Taldangra Panchmura Chowbeta Road between CH 29.00 Kmp to 33.80 km in stretches under Bankura Highway Division, P.W. Roads Directorate in the district of Bankura.
Patch repairing works of potholes, PC and SC (in stretches) from 7.00km. to 10.00km. of Ethelbari-Khagenhat Road under Alipurduar Highway Division in the district of Alipurduar during the year 2022-23.
Improvement at 10th Km of Hatigeria - Kultikri - Rohini - Rogra Road from (9.00 Kmp to 10.00 Kmp.) under Midnapore Highway Division No-II in the district of Paschim Medinipur. (Ch. to 14th F.C.)
Alipurduar-Kumargram Road from 9.80km. to 12.50km., 13.00km. to 13.50km. and 14.00km. to 17.00km. Bituminous Patch repairing work under Alipurduar Highway Division in the district of Alipurduar during the year 2025-26.
Short term measures for black sport in between ch. 11.30 km to 11.80 km at Kiyamacha of Chandrakona - Goaltore - Sarenga - Simlighat Road under Midnapore Highway Division in the District of Paschim Medinipur.
Swarupganj U.B.I More to Anandabas Road from 0.00 kmp to 6.10 km, Widening and Strengthening work under Nadia Highway Division No. I, in the district of Nadia under RIDF - XXV. (2nd Call)
Recovery and restoration of flanks and embankment protection works at Ch. 0.30kmp. of Hantupara side BANGRI RIVER approach road of Hantupara-Totopara Road under Alipurduar Highway Division in the district of Alipurduar
Kolkata-Basanti Road from 79.00 kmp to 84.00 kmp and 85.00 kmp to 86.80kmp, Patch Repair under South 24 Pgs. Highway Division in the Dist. of South 24 Parganas during 2020-2021.
Engagement of 10 (Ten) nos. Security Personnel on purely temporary basis of different categories for guarding at Government Stack-yard, Office etc. under the control of the Executive Engineer, Alipurduar Highway Division
Panisala - Balarampur Road from 7.50 KM to 12.310 KM, Widening and Strengthening work under Coochbehar Highway Division in the district of Coochbehar, during the year 2018 _19 (Under Plan Head). 2nd CALL.