Loading…
Loading…
11,246 results • Best match
Kurseong-Pankhabari Road Emergent restoration works of khade side slip at 2.1 Km damaged due to heavy rain under Darjeeling Highway Division in the district of Darjeeling during the year 2022-23.
Chakberia-Bhojerhat via Tardah Road from 4.55 Km to 10.69 km, Pre Monsoon Repairing and Maintenance work in patches, under South 24-Parganas Highway Division in the Dist of South 24-Parganas.
Maharajpur - Sukdevpur Road from 0.00 Kmp to 3.00 Kmp, Urgent Bituminous Patch Repairing Work in stretches, under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur, during the year 2025-26.
Nalhati Rajgram Road Maintainance repairing and rehabilitation of damage surface of Bridge at 15.68 kmp of Nalhati Rajgram Road under Birbhum Highway Division-I in the District of Birbhum during 2020-21
Kandi-Bharatpur-Salar Road from 13.20 Km to 13.50 Km and 14.50 Km to 24.50 Km by brick stitching work in stretches under Murshidabad Highway Division No.II during the year 2026-27
Improvement of village road from Mather Dighi Block Hospital to Basnti Highway via Barobari More, Mouza-Mather Dighi and Atharobanki , G.P. Atharobanki at Block Canning II , P.S.- Jibantala, District- South 24 Pgs.
DEVELOPMENT AND CONSTRUCTION OF BITUMINOUS ROAD FROM CHANDUA KALYANI HIGHWAY MORE TO JOY JAWAN JOY KISHAN CLUB UNDER KAMPA-CHAKLA GP WITHIN BARRACKPORE I PANCHAYAT SAMITI CHARGEABLE HEAD 5th FC 2023-2024
Kamarpara-Kurmail-Chingishpur Road from 2.00 kmp to 8.00 Kmp in Stretches, Urgent patch repairing works under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur - during the year 2025-26.
Patun-Jordighi Road from 9.00 Km to 12.00 Km, Urgent Bituminous Patch Repairing Work in stretches, under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur during the year 2025-26.
Patch repairing work in different stretches of Muidipur-Kora from 0.00 km to 3.00 km under Burdwan South Highway Division, P.W.(Roads) Dte. In the district of Purba Bardhaman during 2025-2026.
Repairing and maintenance work of Bishnupur Lowada Chakripan Road from 0.00 Kmp to 2.500 Km and 10.00 Kmp to15.20 Km in stretches under Midnapore Highway Division in the District of Paschim Medinipur.
Pre-Moonsoon Dressing and chilchalling at both side of road flanks in different stretches of Kachuberia Gangasagar Road at Sagar Island under Diamond Harbour Highway Division for the finincial year 2022-23
Permanent Protection work of Road stretches prone to breaching due to flood along Amta Rajapur Dihibhurshut road, from 12.00 Kmp to 22.85 Km Under Howrah Highway Division in the district of Howrah
Urgent Repairing of Wing wall and Construction of PCC Soucer Drain at Ch 14.90 km of Churaman Itahar Kushmandi Road under Uttar Dinajpur Highway Division P.W.Roads in the District of Uttar Dinajpur
Magrajpur Terapekhiya Road, patch repairing work by precoating materials, brick stitching and other allied works in stretches under Tamluk Highway Division in the district of Purba Medinipur during the year 2026 2027.
Urgent restoration of road flank damaged due to Uprooting of Trees During strom at Ch 3.90 km of Churaman Itahar Kushmandi Road under Uttar Dinajpur Highway Division during the year 2026 27
Construction of Pedestrian Underpass by Box Jacking Technique at Dumdum Park Crossing of K.N.I. Avenue ( V.I.P. Road ) under Barasat Highway Division No. - I in the District of North 24 Parganas. (2nd Call)
Emergent protection work of 3cell box culvert right side approach providing boulder sausage with concrete lining at ch 1.800km of Ratherdanga Mainatili Road under Coochbehar Highway Division in the district of Coochbehar
Emergent repairing of pavement and embankment damages at the connecting point of Kakina road and approach road of Devi Kamteswri Setu under Cooch Behar Highway Division in the district of Cooch Behar
Patch Repairing work in different stretches of Jaugram Khanpur Road from 0.00 kmp to 2.00 kmp under Burdwan South Highway Division in the district of Purba Bardhaman during the year 2025-26
Emergent Restoration in Patches of Kankra Kachua Road from 0.250Km to 0.750Km, 1.450Km to 2.300Km and 3.25Km to 3.850Km under Barasat Highway Division No. I in the district of North 24-Parganas.
Beautification of Compound at Nalhati Inspection Bunglow by preparation of beds for gardening planting of different trees under Birbhum Highway Division-I in the district of Birbhum during the year 2026-27
Bagnan-Srikol-Kamalpur Road (SH-15) from Ch 0.0 Km to Ch 13.0 Km, Road Flank Maintenance work under Howrah Highway Division, in the District of Howrah during the year 2026-27
Hiring of Inspection Vehicle, (Preferably) (Luxury Taxi / Luxury Car), Motor Cab / Maxi Cab (Diesel/ CNG) for office use, in the Office of the Executive Engineer, Burdwan South Highway Division, P.W ( Roads) Directorate.
Barjora Maliara Durlavpur road at Ch 0.00 km to Ch 1.50 km (in stretches) clearing and repairing of road side drain (both side) under Bankura Highway Division, in the district of Bankura.
Mirik Bye pass Road form 0.00 kmp to 3.30 km, Surfacing work by Mastic Asphalt, Drain work, Protective work and Road Safety work under Darjeeling Highway Division in the district of Darjeeling
Cleaning of road side drain and repairing of cover slab thereon at Ghoshpara Jagulia Road from Ch 16.63Km to 17.63Km under KHiSD of Nadia Highway Division NoII during the year 26-27
Construction of Bituminous Rumble Strip and Road Safety work in front of Jyotirmoy Public School at Ch.5.24 Km of Odlabari Kranti road under Jalpaiguri Highway Division in the district of Jalpaiguri.
Replacement of Faulty Cable from Meter Room to Pump House and Restoration of Damaged Compound Lighting including E.I. Works at the Car Shed of Jhargram Highway Sub Division, P.W. (Roads) Directorate, Jhargram.
Emergent rain damaged repairing of potholes and patch repairing of Thakurbari Bindol Road from 1.50 km to 4.50 km In stretches under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Maintenance of Earthen Shoulder and road side Jungle cutting in streches of Suri-Amjora Road from Ch. 4.00 kmp to 15.00 kmp under Birbhum Highway Division-II in the District of Birbhum.
Maintenance of Earthen Shoulder and road side Jungle cutting in streches of Rajnagar-Khoirasole Road from Ch. 0.00 kmp to 11.00 kmp under Birbhum Highway Division-II in the District of Birbhum
Emergent Patch Repairing work of Bishnupur Beliaghata Road, from chainage 4.00 km to 5.00 km under Barasat Bridge Sub Divison of Barasat Highway Division I in the district of North 24 Parganas.
Emergent Patch Repairing work of Bishnupur Beliaghata Road, from chainage 2.50 km to 3.50 km under Barasat Bridge Sub Divison of Barasat Highway Division I in the district of North 24 Parganas
Preparation of Detailed Project Report (DPR) for Strengthening of Bautia Baidhara Road from 0.00km to 8.00 km under BIRBHUM HIGHWAY DIVISION-I in the district of BIRBHUM during the year 2026-27
Emergent Patch Repairing work of Bishnupur Beliaghata Road, from chainage 1.00 km to 2.00 km under Barasat Bridge Sub Divison of Barasat Highway Division I in the district of North 24 Parganas
Upper Chengmari Nepali Line to Bhutan Border Road from Ch. 0.00 kmp to Ch. 1.20 km, emergency patch maintenance work in different stretches under Jalpaiguri Highway Division in the District of Jalpaiguri
Emergent Rain Damage Repairing of potholes and Patch Repairing of Solpara Rasakhowa Road from 0.00 kmp to 5.00 kmp in stretches under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur
Emergent Rain Damage Repairing of potholes and patch Repairing of Kamalabari Kachimoha Road from 7.50 km to 11.00 km in Stretches under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur
Emergent Rain Damage Repairing of potholes and Patch Repairing of Samaspur Baghan Road from 0.350 kmp to 4.75 kmp in stretches under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur
Emergent Rain Damage Repairing of potholes and Patch Repairing of Bindol Bishnupur Road from 5.00 kmp to 9.70 kmp in stretches under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur
Protection work of Kuntighat Bridge on STKK road at ch. of 9.40 Km. of BHSD-I under Hooghly Highway Division No.-II in the district of Hooghly during the year 2026-2027.
Ghoksadanga Hospital Chowpathy to Atpukuri road from 0.00KM to 3.498KM (in different stretches), repairing of potholes, patching of potholes and road surfacing work under Coochbehar Highway Division in the District of Coochbehar.
Domjur Andul Road 0.00 Kmp to 4.80 Kmp. Repair and Maintanance Work in Patches under Howrah Highway Division in the district of Howrah in the year 2025-2026. (Under Head- Non Plan)
NH 34 Gadamarahat to Mondouri Road Emergent patch Repairing work from 4.500 km to 9.00 km under Barasat Highway Division No.- II , P.W.(Roads) Dte. in the District of North 24 Parganas
Kanupur -Bahutali road from Ch. 7.00 Km to 8.00 km and Ch. 8.40 Km to 8.80 km Patch repairing work in stretches under Murshidabad Highway Division No.I. during the year 2026-2027.
Domjur Andul Road 0.00 Kmp to 3.80 Kmp, repair and maintenance work in Patches under Howrah Highway Division in the district of Howrah during the year 2026-27 under Non Plan Head.
Patch Repair Work of Roypur Ferryghat-Patharpratima Road from 0.00 Kmp to 12.50 Kmp under Diamond Harbour Highway Division in the district of South 24 Parganas for the Financial Year 2026-27.
Emergent work on Speed breakers on GT Road SH-13 from Ch. 610.50 km to Ch. 611.10 km under Hooghly Highway Division No.-II, P.W. Roads Directrorate during the year 2026-27.
Patch repairing work of Kakdwip-Patharpratima road From Ch. 0.00 Kmp to 7.00 Kmp under Diamond Harbour Highway Division in the district of South 24 Parganas in the financial year 2026-27.