Loading…
Loading…
11,253 results • Best match
Emergent repair in stretches of Jibanpur Kalsur Road from 4.00 Km to 7.00 Km and 9.000 Kan is 10.795 Kan ander Ant Highway Division No. II in the district of North 24 Parganas
3(three) Nos. Box Culverts at 1st Km, 7th Km and 10th Km of Tufanganj- Balabhut Road, Rehabilitation work under Cooch Behar Highway Division in the district of Cooch Behar. Project ID-PD202131032S000
Repairing of Chakoltore - Barabazar Road from Ch. 2.50 Kmp to 5.00 Kmp by repairing WBM, 20 mm premix carpet, seal coat in different stretches under Purulia Highway Division during the year 2020-2021.
Habra Simulpur Road from 0.00 kmp to 9.42 km, Surfacing work under Barasat highway Division No II in the dist. of North 24 Parganas.( Sl No.-56 of PATHASHREE SCHEME, HABRA-I, BLOCK)
Recovery and Restoration work of Barunapara Link Road (ODR) form 0.00 Kmp to 2.90 Km under Hooghly Highway Division No. I in the District of Hooghly during the year 2025-26 (under SDRF).
Byapari para (Pradip Byaparis House) to Krishnapur-Tufanganj Road via Gour Mohan Bazar, from 0.00 kmp to 4.43 km , Surfacing work under Coochbehar Highway Division in the district of Coochbehar, Project ID PD232404153S000.
Link road to Katlamari Health Centre Road from 0.00 Kmp. to 2.20 Km., repairing of potholes (in stretches) under Murshidabad Highway Division No.I in the District of Murshidabad. During the year 2024-2025.
Garidhura-Mirik-Simanabusty Road, Construction of RCC Box drain from Ch. 28.00 kmp to Ch. 30.90 Km in stretches under Darjeeling Highway Division in the district of Darjeeling during the year 2022-23.
Engagement of 29 nos. Security Personnel on purely temporary basis of different categories for guarding, at different Government Stack-yard, Office etc. under the control of the Executive Engineer, Murshidabad Highway Division No.I
Emergent restoration of Kolkata- Basanti Road from 73.50 km. To 74.50 km. for the damaged caused by recent Cyclone Bulbul under South 24 Parganas Highway Division in the Dist. of South 24 Parganas.
Salar-Simulia-Kagram Road from 2.50 Kmp to 3.30 Kmp, 7.50 Kmp to 8.50 Kmp and 9.00 Kmp to 10.37 Kmp repairing work in stretches under Murshidabad Highway Division No.II during 2023-24
Emergent temporary repairing work in different stretches of Jaldhaka-Ranirhat road portion from 4.50km to 8.30km for repairing potholes, premix carpet and seal coat under Jalpaiguri highway Division during the year 2019-2020.
Makrampur Ghutiari Sarif Road from 1.00 kmp to 3.00kmp, 6.00kmp to 8.00 kmp, Patch repair under South 24 Pgs. Highway Division in the Dist. of South 24 Parganas during 2020-2021.(2nd Call)
Tufanganj Kamakhyaguri Road to Takuamari Chowpathi Road of NBDD Road (Alipurduar-Boxirhat Road) from 0.00 kmp to 3.150 km, surfacing work under Coochbehar Highway Division in the district of Coochbehar, Project ID PD232404124S000.
Emergent repairing and maintenance work of Bishnupur - Radhamohanpur Rly. Station Road from 0.000 Kmp to 5.00 Kmp in stretches under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. To Non-Plan)
Culvert at ch 4.5km of Nagrakata Chengmari Road, Reconstruction by replacing old and damaged arch type culvert with 2.00m x 2.00m RCC box culvert under Jalpaiguri Highway Division in the district of Jalpaiguri
Hotor Amratala Road from 0.00 Km to 9.100 Km, strengthening works under South 24 Parganas Highway Division in the District of South 24 Parganas under RIDF XXX During the financial Year 2024-2025
Kanki Goagaon Road 12.00 Kmp to 15.00 Kmp and 18.50 Km to 23.40 km repairing and maintenance work in stretches under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur 2nd Call
Construction of Temporary Prepaid Taxi Stand Opposite to S.P. Bungalow beside Gangasagar Permanent Helipad at Sagar Island during Gangasagar Mela 2025 under Diamond Harbour Highway Division in the district of South 24 Parganas.
Budpur Pairachali Road, RCC Box bridge, at 6.60 Km, Re-Construction of damaged Wing wall, Curtain wall, Rigid and Flexible Apron, Embankment protection works under Purulia Highway Division in the district of Purulia.
Bunkulung Soreni Road Emergent restoration protection work of land slide affected zone, Ch. 0.60 and 1.0 in Hill side under Darjeeling Highway Division in the district of Darjeeling during the year 2025-26
Belacoba to Dashdarga road, Maintenance work from chainage 0.00 km to 1.50 km and chainage 4.50 km to 5.50 km (strectches work) under Jalpaiguri Highway Division during the year 2019-20(2nd Call).
Recovery and Restoration (Land Slide) works of Garidhura-Mirik-Simanabusty Road at Ch. 15.20 Km for mending up damages occurs due to heavy rainfall under Darjeeling Highway Division in the district of Darjeeling.
Saptagram Triveni Kalna Katwa (S.T.K.K.) Road (SH-6) from 0.46 km. to 1.833 km. and 3.415 km. to 33.88 km, surfacing work under Hooghly Highway Division No.- II, in the District of Hooghly.
Bodra Kalikatala (Deuli Bazar) Road from 0.00 kmp to 11.726 km Repairing and Maintenance work in Patches at different stretches under South 24 Parganas Highway Division in the District of South 24 Parganas.
Patch repairing work of G.T.Road (SH-13) in stretches from chainage 593 km to 596.4 km under Burdwan South Highway Division, P.W.(Roads) Dte In the district of Purba Bardhaman during 2025-26.
Repair and Painting works of Sr. Accounts Officer Chamber at EE,s office building of Nadia Highway Division No.-I, PW(Roads) Dte. in the District of Nadia during the year 2025-2026
Tufanganj-Kamakhyaguri road to Takuamari Chowpathi road of NBDD road ( Alipurduar- Boxirhat Road), from 0.0 Km to 2.50 km patch repair work under Cooch Behar Highway Division, in the district of Cooch Behar.
Construction of Double Cell 2m X 2m RCC Box Culvert at Ch 3.90 kmp of Randhamali to Bodaganj Road under Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2025-2026.
Anandapur (Ruby) to Natunhat Road Via Khardah - Boynala -Pratapnagar-Harapur Road, Emergent flank damage repairing work from 7.00 Kmp to 15.00 Kmp in different Stretches (protective Work) under South 24 Paraganas Highway Division.
Bridge at Kurchi over Kana Damodar Canal at 18.156 Km of Amta- Rajapur Dihibhurshut Road, Construction in lieu of existing damaged bridge under Howrah Highway Division in the District of Howrah. (2nd Call).
South-Garia-Champahati Road from 0.00kmp to 8.15 km, Raising of K.M Post, Road furniture and allied works under South 24 Parganas Highway Division in the Dist. of South 24 Parganas.(SL-01)
Repair and Maintenance to Kachuberia Gangasagar Road at various stretch from 1.40 kmp to 4.50 kmp caused by super cyclone YASH under Diamond Harbour Highway Division in the district of South 24 Parganas.
Gangajalghati Saltora road from ch 11.00 kmp to 16.00 kmp and ch. 18.00 kmp to ch. 20.00 kmp in stretches maintenance and repairing work under Bankura Highway Division in the district of Bankura
Laskarhat-Tapan Road from Ch. 7.00 Km to 10.00 km, Restoration of Earthen shoulder and Hard Shoulder under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur, during the year 2025-26.
Sahudangi to Ambari road and Fulbari-Ambari Falakata road junction portion improvement with B.C, road safety and allied works under Jalpaiguri highway division in the district of Jalpaiguri during the year 2020-21.
Bodra-Champahati Road from ch.5.512 km to 8.20 km, Restoration work for laying UG Cable by WBSEDCL under South 24 Parganas Highway Division in the Dist. of South 24 Pgs.(DEPOSIT WORK).
Protection of the damaged approaches at 1.00 km ,2m x 2m box culvert location of Gadli Bridge to khaterbari Road , Repairing and Allied works Under Coochbehar highway division in the District of Coochbehar.
Nandakumar Bazar Road from 0.900 KM to 1.500 KM, Widening (5.50 Mtr. To 7.00 Mtr.) and Strengthening work using Paver Block under Tamluk Highway Division in the District of Purba Medinipur. 2ND CALL.
Potholes repairing and surfacing of Ratherdanga Moinatoli Road from 6.25 kmp to 9.00 kmp under Cooch Behar Highway division in the district of Cooch Behar during the year 2018-19 (under N.P. Head)
Emergent repairing and maintenance work of Sabong - Mohar Road from 0.00 kmp to 2.00 kmp and 4.00 kmp to 6.00 kmp in stretches under Midnapore Highway Division in the District of Paschim Medinipur.
Road from Upper Chengmari T.G. PWD Road to Nepali Line Bhutan border road(ch.0.00km to 1.75km) surfacing work under Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2023-2024
Garidhura-Mirik-Simanabusty Road Emergent restoration works of khade side slip at 6.03 Km damaged due to heavy rain under Darjeeling Highway Division in the district of Darjeeling during the year 2022-23
Baliakhari Bridge over local khari at 10th Km of Harirampur-Dhumsadighi Road - Approach Embankment Protection Work, under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur during the year of 2023-24.
Emergent repair of Kuli-Burwan-Gramsalika-Majlishpur-Ramjibanpur Road from 26.85 Km to 27.00 Km and 27.10 Km to 27.40 Km (in stretches) under Murshidabad Highway Division No.II in the District of Murshidabad
Construction of Storm Water Drain from 22.92 km to 23.10 km and 22.92 km, construction of 1 m slab culvert at Bankura Saltora road under Bankura Highway Division in the district of Bankura.
Supplying of Security Personnel on purely temporary basis for guarding at different Govt. Stackyard, offices etc. under the control of Executive Engineer, Bankura Highway Division, P.W. Roads Directorate in the district of Bankura
Emergent Repairing and Surfacing in different stretches of Plassey- Betai Road from 4.00 Kmp to 6.00 Kmp under Nadia Highway Division No.-I in the District of Nadia during the year 2024-2025
Guma Gurda Road and Link Road to Lokenath Ashram Road from 0.00 Kmp to 6.70 Km, Surfacing work (Except Mastic Portion) under Barasat Highway Division No.II in the District of North 24-Parganas.
Repair of potholes and surfacing work also some other allied work from 0.00km. to 4.00km. of Ethelbari-Khagenhat road under Alipurduar Highway Division in the district of Alipurduar during the year 2021-22.