Loading…
Loading…
11,275 results • Best match
Emergent Restoration at different stretches of Jibanmondalhat Sonatikerihat Road from 5.32 Kmp. to 5.50 Kmp. due to damages caused by recent Cyclone Bulbul under Diamond Harbour Highway Division in the District of South 24 Parganas.
R.C.C. Box Bridge over a channel at 2nd km on Maharajahat-Bhatol Road, Reconstruction by replacing old narrow bridge under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur (2nd CALL). Project ID PD242525550S000
Sindri-Manbazar Road at 6.80km to 17.800km, restoration of road due to probable damage caused by the laying of water supply pipeline of PHE Dte. (Purulia) in connection with W.B.P.W.S.P. (JICA) under Purulia Highway Division
Rehabilitation of distress bridge an culvert in different Ch. of Kalchini- Jaygaon Road, Union Academy- GudamDabri Road and from 10.00km. to 17.84km. of Kalchini-Paitkapara Road under Alipurduar Highway Division in the district of Alipurduar
Construction of CC road from Asain highway Bela Adhikari house to Putul Chandras house at 25/314 Kawakhari Booth within Matigara I GP at APAS under Matigara Development Block -APAS (APAS/01/025/314/0006)
Providing instant all weather polymeric premixed road repairing compound with carriage, loading and unloading in different stackyards under the jurisdiction of Birbhum Highway Division-I in the district of Birbhum during the year 2025-26
Mirik Bye Pass Road from 0.00 kmp to 3.30 Kmp pre and post monsoon works, drain, culvert clearance and jungle cutting under Darjeeling Highway Division in the district of Darjeeling during the year 2023 24
Repair and restoration of damage during monsoon for Dignagar Badkulla Road Santipur Municipal Link Road Gobindapur Bypass to Mukundapur via Baganchra Bhaluka Road and Santipur Guptipara Ferry Ghat Road of Ranaghat Highway Sub Division under
Gosalamore to Fatapukurmore Road from at ch. 11.80kmp to 13.90km for emergent repairing of potholes and damaged road surface (in stretches) under Jalpaiguri Highway Division in the dist. of Jalpaiguri during the year 2024-25
Emergent temporary repairing work in different stretches of Khalaigram Khetifulbari road portion from 8.20 km to 9.00 km with WBM, potholes, premix carpet and seal coat under Jalpaiguri Highway Division in the district of Jalpaiguri
Mahipal-Chowrangee more to Kantabari Road from 0.00 Km to 5.00 Km, Urgent Bituminous Patch Repairing Work in stretches, under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur during the year 2024-25.
Shifting of PHE pipeline for Ratua to Bhaluka Road from 6.40 km to 11.20 km, widening and strengthening work under Malda Highway Division in the district of Malda during the year 2023-24. (RIDF-XXX).
Construction of temporary brick paved vehicle turning area and parking zone for pilgrim busses at Harwood Point under Diamond Harbour Highway Division in the district of South 24 Parganas for ensuring GS Mela Spot - 6
Garidhura-Mirik-Simanabusty Road, Emergent Restoration works of khad side slip at 9.92kmp and 11.30 Kmp damaged due to heavy rainfall under Darjeeling Highway Division in the district of Darjeeling during the year 2020-21
Detailed survey and preparation of detailed project report for Boxirhat Jorai Road, From 0.000 Km To 9.200 Km widening and Strengthening Work, Under Coochbehar Highway Division, In The District Of Coochbehar including preparation of PPT
Road Safety Works in between Dumdum Park to Lake Town i.e. 3.00 Kmp. To 1.50 Km. Along Kazi Nazrul Islam Sarani (V.I.P. Road) under Barasat Highway Division I in the district of North 24 Parganas.
Repairing work of Kuli-Burwan-Gramsalika-Majlishpur-Ramjibanpur Road from 25.50 Km to 26.00 Km by mending potholes and depressions by stitching picked jhama bricks (in stretches) under Murshidabad Highway Division No.II during 2022-23
Peshoke-Mungpoo Road Khadeside and Hillside protective works alongwith allied works at 12.51 Km, 12.71 Km, 12.82 Km and 15.60 km under Darjeeling Highway Division in the district of Darjeeling during the year 2021-22.
Emergent repair work of a causway at chainage 1.00 km of Fului Rangamati via Tarajuli Khalghat Road under Hooghly Highway Division No.1, P.W.(Roads) Directorate, in the district Hooghly, during the year 2025-2026.
Mahendra More to Kumarganj Bus stand via Paitadighi road from 0.00 kmp to 4.00 kmp patch repairing work, under Dakshin Dinajpur Highway Division in the District of Dakshin-Dinajpur, during the year of 2022 23
Garidhura-Mirik-Simanabusty Road, Emergent Restoration works of khad side slip at 9.60 and 9.90 Km damaged due to heavy rainfall under Darjeeling Highway Division in the district of Darjeeling during the year 2020-21
Repairing work of Kuli-Burwan-Gramsalika-Majlishpur-Ramjibanpur Road from 1.45 Km to 1.90 Km by mending potholes and depressions by stitching picked jhama bricks (in stretches) under Murshidabad Highway Division No.II during 2022-23
Gosalamore to Fatapukurmore road from at ch. 4.80kmp to 6.80km for emergent repairing of potholes and damaged road surface (in stretches) under Jalpaiguri Highway Division in the dist. of Jalpaiguri during the year 2024-25.
SITC of Inverter System including allied EI Works for arrangement of power back-up at the office building of the Executive Engineer Purulia Highway Division PW_Roads_ Dte Ranchi Road_ Purulia in the District of Purulia
Providing Mastic Asphalt over H,P culvert (10nos of ROW 1200mm dia pipe)and other allied items of work at ch 1.350km of Faltur hat Road , under Coochbehar Highway Division in the dist of Coochbehar.
Supply of manpower an equipment for upkeepment (dusting, cleaning, sweeping, Scavenging work including caretaking and nursing Garden etc.) of Bishnupur Inspection Bungalow cum Rest Shed and its campus under Bankura Highway Division, P.W.(Roads) Dte.
Mungpoo Rambhibazar Road-emergent Repairing of Potholes followed by premix carpet and seal coat from Ch-0.50 Km to 1.50 Km under Darjeeling Highway Division in the district of Darjeeling during the year 2024-25
Mundamari Pingla Paramanandapur Moyna Road, from 20.00kmp to 21.375 km and 21.485 km to 22.00kmp, Widening and Reconstruction Work by Paver Block under Tamluk Highway Division in the district of Purba Medinipur. Project ID PD232403114S000
Preparation of Detailed Project Report (DPR) for the work of Bharatpur-Lohadahaghat Road (MDR) from Chainage 0.00 Kmp to 10.20 Kmp, Widening and Strengthening work under Murshidabad Highway Division II in the district of Murshidabad
Botolbari Rudel Road 9.00 km to 12.00 km emergant repairing of pothole and surfacing works in patches under Uttar Dinajpur Highway Division in the District of Uttar DinajpurHighway Division in the District of Uttar Dinajpur.
Urgent Restoration of road flank in front of Kunoir K.C. High School on Kaliyaganj Kunore Road under Uttar Dinajpur Highway Division PW Roads Dte in the district of Uttar Dinajpur during the year 2025 2026
Extension of single ROW 1200 mm Dia Hume Pipe Culvert by Construction of New Facewall replacing the damaged portion at 7.20 Km of Begunkodar-Arsha Road under Purulia Highway Division in the district of Purulia.
Construction of CC road from Asian Highway to Durga Medical hall via house of Kartik Saha art Thiknikata within Matigara I G.P. under Matigara Panchayat Samity. Fund- 15th FC (Untied) 25-26, Work Id- 114177106
4 row 1400 dia NP 4 Hume Pipe culvert at 81st KM of Mathabhanga - Coochbehar Road (SH - 16), construction, replacing existing HP Culvert under Coochbehar Highway Division in the district of Coochbehar Project ID PD202130472S000.
Maintenance and Repair works of Narajole Daspur Road by providing patches potholes, repair potholes, 20mm PC and Seal coat type B from 8.00 to 12.00kmp under Midnapore Highway Division in the district of Paschim Medinipur.
Raiganj-Barsoi Road (i.e. Barduary More to Bahinghat Road via Chapduar) from 0.00 kmp to 9.70 km for widening and strengthening work under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur. (2nd Call)
Debra - Marotola Road from 1.00 kmp to 7.00 kmp, Patch repair under Midnapore Highway Division in the district of Paschim Medinipur during 2021-2022. (Ch to Non-Plan / damage caused due to cyclonic storm YAAS)
Dolong bridge at 64th Km of Mathabhanga Cooch Behar road (SH-16), emergent repairing and repalcement of Strip Seal Expansion Joint and Protection Work under Cooch Behar Highway Division in the District of Cooch Behar.
Emergent Patch repairing work at Inspection Road along Lower Bagjola Canal from 10.00 Kmp. to 14.00 Kmp. and 21.00 Kmp. to 25.00 Kmp. under Barasat Highway Division-I in the district of North 24 Parganas
Replacement of damaged HP culvert at Ch. 3.440 km of Debra - Maratala Road under Midnapore Highway Division in the District of Paschim Medinipur in the year 2021-2022 (Ch. To Non-Plan / flood damage repair)
Electrical Installation work of newly finished Structure constructed for the purpose of Bungalow. Rest House at Bishnupur stackyard under Executive Engineer Bankura Highway Division P.W.(Roads)Dte - Sand F Bollard and Pathway Lighting additional work
Construction of Boundary Wall at Moregram Stack-Yard, including previous NH Section office compound, at Moregram, in the Raghunathganj High-Way Sub-Division , under the Murshidabad Highway Division no - 1, in the District of Murshidabad
Recovery and restoration work of Jamaldah Dhulirhat Road from 0.00 kmp to 3.70 kmp under Coochbehar Highway Division in the District of Coochbehar for mending up damages occurred due to heavy rainfall / flood like situation.
Emergent temporary repairing work in different stretches of Khalaigram-Khetifulbari road portion from 7.00kmp to 9.00kmp, 10.00kmp to 11.00kmp and 12.00kmp to 13.00kmp with potholes, premix Carpet and Seal Coat under Jalpaiguri highway division durin
Construction of Temporary pandel and wooden platform at Belpukur Bus Buffer zone on the occasion of Gangasagar Mela - 2024 under Dimaond Harbour Highway Sub Division, P.W. (Roads) Directorate in the district of South 24 Parganas.
Emergent maintenance of road flanks through dressing and chilchalling works in stretches 64.00km to 82.00 km on Mathabhanga-Cooch Behar road (SH-16) under Cooch Behar Highway Division road in the district of Cooch Behar.
Pransagar shop of Subhash Ramprasad to Dahapara Road via Samra, Srinathbati, Ramdebpur, Dahapara, Jahangirpur G.P. office from 0.00 Kmp to 6.80 Km (except 300.00m existing Rigid Pavement zone) Surfacing Work under Dakshin Dinajpur Highway Division,
Construction of Temporary pandel and wooden platform at Belpukur Bus Buffer zone on the occasion of Gangasagar Mela - 2023 under Dimaond Harbour Highway Sub Division, P.W. (Roads) Directorate in the district of South 24 Parganas
Construction of Temporary pandel and wooden platform at Belpukur Bus Buffer zone on the occasion of Gangasagar Mela - 2025 under Dimaond Harbour Highway Sub Division, P.W. (Roads) Directorate in the district of South 24 Parganas.
Emergent Restoration in Patches of Basirhat College to Champapukur Railway Station Road from 0.20Km to 0.80Km, 1.10Km to 1.50Km and 3.10Km to 3.55Km under Barasat Highway Division No.I in the district of North 24-Parganas