Loading…
Loading…
11,275 results • Best match
Improvement of flank by providing dressing and chilchalling as premonsoon maintenance from 25.00 Kmp to 30.00 Kmp including approaches of causeway over river Tarafeni of Dahijuri-Binpur-Silda-Hatiary Road under Jhargram Highway Division
Garidhura Mirik Simanabusty Road, emergent construction of hillside protective wall at chainage 33.45 km to 33.5 km on disaster urgency under Darjeeling Highway Division in the district of Darjeeling during the year 2023-24.
Traffic Calming measures (Phase-I) by construction of Rumble Strips on different roads (Various Link Roads of SH-14) as per decision of District Road Safety Committee, Birbhum District under Illambazar Highway Sub-Division
Akra-Santoshpur-Taratala Road at ch 3.00 km (Near Santoshpur Pumping Station) Emergent road restoration work damaged caused due to road cutting open by CESC under South 24-Parganas Highway Division in the Division.
Tree Felling and Transportation Work in connection with the proposed Kushmandi - Mahipaldighi Road (MDR) widening and strengthening project under Dakshin Dinajpur Highway Division, in the district of Dakshin Dinajpure during the year 2024-25.
Mirik Bye Pass Road from kmp 0.00 to 3.30 for pre and post monsoon work, drain clearance and jungle cutting under Darjeeling Highway Division in the district of Darjeeling during the year 2025-26
Temporary Diversion Road for Temporary Rail Gate at Balichak as per Minutes of Joint Inspection, P.W.D (Roads) W.B and Indian Railway at Balichak as on 19.09.2023 of Debra - Sabong Road under Midnapore Highway Division
Emergent repair work of Gopiballavpur to Fekoghat Road from 6.50 Km to 8.50 Km in Patches by Premix Carpet, Seal Coat and Hard Shouldering work, under Jhargram Highway Division in the district of Jhargram.
Preparation of Detailed Project Report (DPR) for the work of Kandi-Bharatpur-Salar Road (MDR) from Chainage 0.00 Kmp to 27.665 Kmp, Strengthening work under Murshidabad Highway Division II in the district of Murshidabad
Emergent rain damage restoration work at Right side approaches of Bouti Bridge at 7th km of Cooch Behar _ Baneswar-Alipurduar road (SH-16) under Cooch Behar Highway Division in the district of Cooch Behar.
Repair and painting work of Ramp along with protection work of Yard at Lot-8 LCT Jetty under Diamond Harbour Highway Division in the district of South 24 Parganas during financial year 2024-25
Keorapukur-Julpia Road from 0.00 kmp to 4.00 kmp, Emergent repairing and maintenance by DBM , BC in patches at different stretches under South 24-Parganas Highway Division in the District of South 24 Parganas.
Recovery and Restoration of Ratherdanga Moinatoli Road from 0.00 kmp to 9.00 km under Coochbehar Highway Division in the district of Coochbehar for mending up damages occurred due to heavy rainfall / flood like situation.
Thakurpura to Teor(NH-512) road via Chakbalaram from 3.00 kmp to 6.00 kmp patch repairing work, under Dakshin Dinajpur Highway Division in the District of Dakshin-Dinajpur, during the year of 2022 23
Saptagram-Tribeni-Kalna-Katwa (STKK) Road (SH-6)-Construction of storm water drain from 58.710 km to 59.000 kmp (left side) under Burdwan South Highway Division in the district of Purba Bardhaman.(2nd Call)
Pandua Kamtai Road to Simlagarh from 0.00kmp to 5.80kmp Surfacing work of the existing road under Hooghly Highway Division-II, in the district of Hooghly during the year 2022-23 under State Plan Head
Parui Brahmondihi Koyra Road at 12.973 km. over River Sal, Reconstruction of new vented causeway in place of damaged causeway near Golte village under Birbhum Highway Division No-II, in the district of Birbhum.
Keorapukur Julpia road from 4.00 kmp to 11.77 km and Pailan Nepalganj Road from 0.00 kmp to 7.50 km, Surfacing work under South 24 Parganas Highway Division in the district of South 24 Parganas
Patch repairing work of potholes, premix carpet and seal coat (in stretches) from 6.50km. to 9.50km. of Silbari-Salkumarhat Road under Alipurduar Highway Division in the district of Alipurduar during the year 2022-23.
Nabanda Joykrishnapur Road from Ch 16.00 kmp to ch 21.00 kmp and ch 27.00 kmp to ch 28.600 km, repairing and maintenance work (in stretches) under Bankura Highway Division in the District of Bankura.
Rangamati Asuria Dejuri road from ch 4.00 kmp to 9.00 kmp and ch 11.00 kmp to ch 16.00 kmp in stretches maintenance and repairing work under Bankura Highway Division in the district of Bankura
Emergent Pothole Repairing work of Mathabhanga Coochbehar Road (SH-16) in stretch from 89.00 Km to 92.10 Km, under Cooch Behar Highway Division in the district of Cooch Behar during the year 2025-26.
Partly Dismantle of existing Boundary wall and Reconstruction of new Boundary wall at Digha Inspection Bungalow due to Widening of Digha Foreshore Road work Under Tamluk Highway Division in the District of Purba Medinipur.
Dohomani Churulia Ajoy Ghat Road , preparation of Detailed Project Report(DPR) From 0.000 Km to 9.00 Km, strengthening work , under Asansol Highway Division in the District of Paschim Bardhaman during the FY 2025-26
Patch Repairing work of Kalachara - Bhagabatipur road from 3.50 kmp to 5.50 kmp of Serampore Bridge Hwy. Sub-Division under Hooghly Highway Division -II, In the District of Hooghly, during The Year 2023 -2024.
Dhuturdah Health Centre Road Strengthening work from 0.00Kmp to 7.30 Km under Barasat Highway Division No.I in the district of North 24 Parganas. .2nd call of NIT. No.01 of 2022-23, Sl.No.02
Natabari-Bhatibari Road-1.50 km to 3.50 km and Chilakhana-Natabari Road from 5.00 kmp to 9.80 km pre-monsoon potholes repair work under Cooch Behar Highway Division in the district of Cooch Behar.
Traffic survey, Details Soil investigation, topographical survey Pavement condition Survey(FWD) an Preparation of Detailed Project Report (DPR) for Strengthening of Panrui-Bramhandihi-Koyra Road from 0.00 to 14.83 km, under Birbhum Highway DivisionII
Patch repairing works of 0.00 km to 2.00 km from 8th km of Pundibari-Baneswar (Chagolber Chowpati) to Gopalpur Health centre Link Road under Cooch Behar Highway Division in the district of Cooch Behar .
Emergent Repairing work of mending potholes by Pre Coating materials within the jurisdiction of Section III of Quality Control Sub-Division No. I under Nadia Highway Division No. II for the year 2026-2027
Kolkata-Basanti Road from 16.00kmp to 29.00 kmp, Emergent Restoration work in patches damaged caused due to cyclone YAAS under South 24 Pgs. Highway Division in the Dist. of South 24 Parganas.(SL-01)
Box and Hume pipe culvert at different chainage 0.260 km, 0.530 km, 5.790 km, 7.40 km and 7.560 km Sahudangi to Belacoba road, rehabilitation work under Jalpaiguri Highway Division in the district of Jalpaiguri.
Hasimara-Jaigaon Road from 11.00km. to 13.00km. and 14.50km. to 17.00km. Potholes Repair Work Along with Other Allied Civil Works under Alipurduar Highway Division in the district of Alipurduar during the year 2026-27.
Emergent repairing work in Patches of Sec-1 of Quality Control Sub Division No.I considering West Bengal Legislative Assembly Election 2026 for smooth vehicular movement before and during poll under Nadia Highway Division No.II
Construction of Temporary vehicle Stand beside Vivekananda School at Kachuberia, Sagar Island during Gangasagar Mela 2025 under Diamond Harbour Highway Division in the district of South 24 Parganas for ensuing G. S. Mela - 2025
Supply of materials 1st class Picked Brick/Jhama at Plassey Stackyard and labour charges for mending damages (Potholes/ Depression) by materials at different roads under Plassey Highway Sub Division under NHD-I (3rd Call)
Mungpoo Rambhibazar Emergent Restoration of wall damaged due to landslide at 8.90 Km in both khade side and hill side under Darjeeling Highway Division in the district of Darjeeling during the year 2021-22.
Repair and rehabilitation of bridge at 12th Km of Suri Rajnagar Road under Birbhum Highway Division -II, P.W. (Roads) Dte. in the District of Birbhum.-II, P.W. (Roads) Dte. in the District of Birbhum.
Emergent Repairing potholes in stretches from Ch. 12.00 Km to Ch. 20.00 Km of Kalaberia - Pirakata - Dhansole - Lalgarh Road under Midnapore Highway Division in the District of Paschim Medinipur during the year 2026-27.
Link Road connecting Panskura Railway Station from 0.430 km to 1.485 km, emergant rain damage repairing work in stretches under Tamluk Highway Division in the district of Purba Medinipur during the year 2026 2027.
Link Road connecting Bhogpur Railway Station from 0.00 km to 2.50 km, emergant rain damage repairing work in stretches under Tamluk Highway Division in the district of Purba Medinipur during the year 2026 2027.
Road Marking and allied work at Ranihati Haridaspur Amta road between 0.25 km to 15.40 km under Howrah Highway Division in the District of Howrah during the year 2025-26. (Under Head Non Plan)
Nimaniya Kaikhali Road from 0.00 Kmp to 4.50 and 7.50 kmp to12.00 Kmp, emergent repair of Pot holes in stretches by Brick Stitching in the Dist. of South 24Pgs under Diamond Harbour Highway Division.
Patch Repair Work of Roypur Ferryghat-Patharpratima Road From Ch. 0.000 Kmp to Ch.11.000 Kmp under Diamond Harbour Highway Division in the district of South 24 Parganas for the Financial Year 2025-26.
Moyna Madhabpur Road from 1.10 kmp to 2.10 kmp and 2.50 kmp to 3.50 kmp emergent potholes repairing Work under Barasat Highway Division No II, P.W.Rds. Dte. in the District of North 24 Parganas
Sreepally Bajitpur Road from Ch. 0.00 Kmp to Ch. 11.00 Km, Traffic calming measures at different locations under Barasat Highway Division No. II, Govt. of West Bengal in the District of North 24 Parganas
Basanti-Herobhanga Road from 0.00 to 22.100 K.M. Clearing and grubbing road land at different stretches along with other allied works under South 24 Parganas Highway Division in the District of South 24 Parganas.
Joynagar Kulpi Muldia Road from 0.00 km to 3.20 km and Dhanpota Muldia Road from 0.00 km to 5.40 km, Strengthening work under Diamond Harbour Highway Division,. in the district of South 24 Parganas.
Patch repair of surfaces with open-Graded Premix surfacing, 20 mm. on Panchgram-Nabagram-Lalbagh Road from 15.00 Kmp to ...... 26.50 Km, in stretches under Murshidabad Highway Division No.II during the year 2026-27
Khatra Ambikanagar Road at 8.1 km Belmouth correction work along with construction of earthen shoulder from Ch 0.00 kmp to Ch 10.00 kmp In stretches under Bankura Highway Division in the district of Bankura