Loading…
Loading…
11,275 results • Best match
Rampur Chakulia Road from 0.00 kmp to 4.00 kmp repairing potholes and protective work in stretches and repairing culvert at Ch. 5.33 km in the district of Uttar Dinajpur under Uttar Dinajpur Highway Division
Emergent restoration work of river bank besides joist bridge over river Gadadhar (at Krishnapur end) at 4th Km of Choto Mahadev Village road under Cooch Behar Highway Division in the District of Cooch Behar
Kulti Haritala to Jamna Bus stand via Krishnapur, Baharkuli, Sargoria road from 5.00 kmp to 7.50 km (in stretches) emergent maintenance and repairing work under Burdwan South Highway Division during the year 2025-26.
Gosalamore to Fatapukurmore Road at ch. 9.50km to 13.50km for emergent repairing of potholes and damaged road surface (in stretches) under Jalpaiguri Highway Division in the dist. of Jalpaiguri during the year 2025-26
NH-34 Gadamarahat to Mondouri Road from 0.00 kmp to 9.00 kmp (Except from 2.071 km to 3.704 km), Surfacing work under Barasat Highway Division No. II in the district of North 24 Parganas
Fatapukur to Gadra road at chainage 6th km Sahu Bridge both side approach damaged side drain improvement and boulder Pitching on slopes and allied works under Jalpaiguri Highway Division during the year 2025-26
Deocharai Balarampur road (Chilka Sadhu Ghat Par) to Dinesh Barmans House via Ranjan Barmans House ..patch repairing work in stretches under Coochbehar Highway Division in the District of Coochbehar during the year 2022-23.
Lawhati Haroa road from 0.00 Kmp. to 18 Kmp. (Except Mastic Asphalt ICPB Zone) Surfacing work under Barasat Highway Division No. - I in the District of North 24 Parganas, West Bengal Under Special Assistance.
Outsourcing of security personnel for Guarding of the Office premises Stackyard Scheme sites Rest Shed Residential complex etc Round the clock for protection of Government materials and other properties under Uttar Dinajpur Highway Division
Akra-Santoshpur-Taratala Road at Ch.4.40 km, Emergent road restoration work damaged caused due to road cutting/open by CESC under South 24 Parganas Highway Division in the District of South 24 Parganas
Supply of Security Guards in different Stack yard, office, Inspection Bungalow , campus etc. for the period of 1 (one) year under Asansol Highway Division , P.W.(Roads) Directt. Paschim Burdhaman, during the FY 2022-23.
Tarapith Birchandrapur Hazipur Mayureswar Kotasur Road from 0.00 kmp to 1.10 km, Surfacing and from 1.10 km. to 26.00 kmp, Widening and Strengthening work under Birbhum Highway Division-I, In the district of Birbhum.
Restoration of road in Patches including protective work damaged in streches from chainage 0.00 Kmp.to 5.00 Km. of Haroa Autostand - Natunhat Road under Barasat Highway Division-I in the district of North 24 Parganas.
Construction of temporary Bus Buffer Zone at Chayergheri, Sagar Island including subsequent restoration of land on the occasion of Gangasagar Mela 2026 under Diamond Harbour Highway Division in the district of South 24 Parganas.
Vented Pipe causeway at 3.00 kmp (simla) and 3.30 km. (Moula) on Palaschabri -Srinagar Road, re-construction, replacing existing damaged causeway under Midnapore Highway Division in the District of Paschim Medinipur. Project ID PD202129260S000
Jhilimili Kuilapal Road CH 0.00 Kmp to 1.50 Km in stretches maintenance and repairing work and Ranibandh Jhilimili Road vented Causeway Porardir Jhor situated at CH 18.80 Km restoration work under Bankura Highway Division.
1 (one) no. Double Cell Box Culvert of size 2m X2m at 16.50km of Jalpaiguri-Choulhati road, reconstruction work by replacing old damaged slab culvert under Jalpaiguri Highway Division in the district of Jalpaiguri.
Repairing of both side approach road at CHEKO Bridge from Ch. 3.5km. to 4.1km. of Alipurduar-Kumargram Road, surfacing work under Alipurduar Highway Division in the district of Alipurduar during the year 2022-23.
Maintenance and repairing work to Ramjibanpur- Palita- Palitpur- Natunhat road from 107.00km to 107.50, from 108.00km to 109.50km and Dressing Chilchalling Work from 100.00 km to 110.64km under Ramjibanpur Highway Sub-Division of BNHD
Mahendra More to Kumarganj Bus Stand via Paitadighi road from 11.50 Km to 17.00 Kmp Patch repairing work, under Dakshin Dinajpur Highway Division, in the District of Dakshin Dinajpur, during the year 2022-23.
Gangajalghati Satore Road at Ch 8.00 kmp to Ch 9.00 kmp and Ch 16.00 kmp to Ch 19.00 kmp in stretches Maintenance and repairing work , under Bankura Highway Division in the district of Bankura.
Basirhat Ichamati Bridge Restoration of Wearing Course in approach road on Both End (Basirhat End Sangrampur End), with Rectification of Footpath Painting under Barasat Highway Division I in the district of North 24 Parganas.
Poktapole - Dasagram Road from 2.500 kmp to 5.00 kmp and 8.00 kmp to 10.500 kmp patch repair works (in stretches) under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
Garidhura-Mirik-Simanabusty Road from Balance Restoration works of Khade Side slip at 13.06 Km damaged due to heavy rain under Darjeeling Highway Division in the district of Darjeeling during the year 2021-22.
Approach Road, from Liluah Station road Flyover Junction Ch. 1.30 Km to NISCO Factory Ch. 2.58 Km for the proposed integrated Textile Park of Govt. of West Bengal Undertaking, construction under Howrah Highway Division
Maintenance, Beautification work of the existing Nayanjuli and Construction of Embankment, Walking Pathway, Bio Diversity park from Bangoor to Dumdum Park of Kazi Nazrul Islam Avenue (V.I.P. Road) under Barasat Highway Division No. I.
Construction of temporary bus stand with brick paved road from vehicle turning area to parking zone, Barricading and Drop gate at Damodarpur on the occasion of Gangasagar Mela 2026 under Diamond Harbour Highway Division.
Box Bridge over local khari at 4th km of Mahipal Chowrangee more to Kantabari road, Rehabilitation Work, under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur, during the year of 2022-23.
Construction of Temporary vehicle Stand beside Vivekananda School at Kachuberia, Sagar Island during Gangasagar Mela 2026 under Diamond Harbour Highway Division in the district of South 24 Parganas for ensuing G. S. Mela - 2026.
Dinhata Balarampur road from 5.00 Km to 7.00 km and 12 km to 15.00 km, emergent rain damage repairing work (by brick stitching)( In stretches) under Coochbehar Highway Division in the District of Coochbehar .
Byapari Para (Pradip Byapari s House) to Krishnapur Tufanganj Road via Gour Mohan Bazar from 0.00 Kmp to 4.43 Km , patch repairing work in stretches under Coochbehar Highway Division in the District of Coochbehar.
Temporary Rain Damage restoration of Ramnagar-Bazarshaw-Chourigacha-Khagraghat Road from 0.00 Kmp to 4.00 Kmp, 10.00 Kmp to 12.00 Kmp and 13.00 Kmp to 24.00 Kmp (in Patches) under Kandi Highway Sub-Division
Repair and Maintenance of Road No. - V from 0.00 kmp to 1.00 kmp at Sagar Island under Diamond Harbour Highway Division in the district of South 24 Parganas for ensuing G. S. Mela 2022.
Garidhura-Mirik-Simanabusty Road, Protection work at khad side from 10.85 Km to 12.00 Kmp along with drain work in stretches under Darjeeling Highway Division in the of Darjeeling during the year 2021-22.
Emergent Repair of Kuli-Futisanko Road from 9.00 Kmp to 10.00 Kmp..........and 26.00 Kmp to 27.00 Kmp (in stretches) under Murshidabad Highway Division No.II in the district Murshidabad during the year 2019-20
Chandrakona Goaltore Sarenga Simlighat Road i) from 40.00 km to 41.40 km., Widening and Strengthening work and ii) from29.00 km to 40.00 km, Surfacing Work under Bankura Highway Division in the District of Bankura
Damda-Chakoltore-Daradi-Kenda-Manbazar Road, Construction of Gaurd wall from ch. 8.10 Km to 8.217 Km and drain from 10.203 Km to 10.319 Km under Purulia Highway Division in the district of Purulia.
Shikharpur-Kulti Canal Road from 5.00 kmp to 6.30 km, 7.80 km. to 11.50 km, repair and maintenance work in patches under South 24-Parganas Highway Division in the Dist of South 24-Parganas
Emergency Replacement of damaged Culvert by Providing 3 Nos. 1.50 M span Slab Culvert on Bharatpur Lohadahaghat Road at 1.45 Km, 2.80 Km and 3.05 Km under Murshidabad Highway Division No.II during 2022-23
Chakdaha Nimtala Road from ch. 0.00 kmp to ch. 9.20 km and ch. 17.00 kmp to ch. 18.41 km, Surfacing Work under Nadia Highway Division No- II in the District of Nadia. .(2nd Call).
Bodra Kalikatala (Deulibazar) Road, pre-monsoon work from 0.00kmp to 11.726 km (except paver block portion) in patches and in stretches under South 24-Parganas Highway Division in the Dist of South 24-Parganas.
Garidhura - Mirik - Simanabusty Road, Surfacing work with mastic asphalt for 4.18 km to 14.00 kmp (except 2.325 km in stretches covered with existing mastic asphalt) under Darjeeling Highway Division in the district of Darjeeling.
Ghaturmore-Chakdah Road from 0.00 kmp to 6.00 kmp, 8.00 kmp to 12.30 kmp, Patch Repair under South 24 Pgs. Highway Division in the Dist. of South 24 Parganas during 2020-2021(SL-01)
Sherpur-Bishnupur Road from 6.1 Km to 6.3 Km, 6.4 Km to 6.95 Km ......... and 11.60 Km to 11.70 Km emergent patch repair work (in stretches) under Murshidabad Highway Division No.II during 2022-23
Illambazar-Dubrajpur Road (SH-14)-Repair And Rehabilitation of Minor Bridges- 2 Nos At 42.300 km and 42.400 Km under Birbhum Highway Division No.-II, P.W. (Roads) Dte. During The Year of 2024-2025..
DEVELOPMENT AND CONSTRUCTION OF BITUMINOUS ROAD FROM CHANDUA KALYANI HIGHWAY MORE TO JOY JAWAN JOY KISHAN CLUB UNDER KAMPA CHAKLA G P WITHIN BARRACKPORE I PANCHAYAT SAMITI CHARGEABLE HEAD BEUP 104 NAIHATI A C
Inspection Road along Lower Bagjola Canal from 5.70 Km to 13.40 Km. 15.40 Km. to 28.53 Km., Strengthening work under Barasat Highway Division No. I in the distict of North 24 Parganas.(2nd Call).
Patch repairing work of Ramnagar-Bazarsaw-Chourigacha-Khagraghat Road from 15.00 Km to 15.18 Km........and 17.50 Km to 17.65 Km (in Stretches) under Murshidabad Highway Division No.II for the financial year 2019-20
Construction of strom water drain at Ch.- 17.980 Km , 18.550 Km and 19.790 Km respectively of Midnapur- Keshpur - Road under Midnapore Highway Division in the District of Paschim Medinipur. Ch. To SDMF / Non-Plan
Canning Herobhanga road from 7.000 kmp to 13.670 km and Kulari-Milan Bazar road from 0.000 to 7.800 km surfacing work under south 24-Parganas Highway Division in the district of South 24-Parganas