Loading…
Loading…
11,263 results • Best match
Santoshpur Duttapukur Road from 0.00 kmp to 5.794 km, Strengthening work under Barasat Highway Division No. II, in the District of North 24 Parganas. 2nd Call of NIT-3 of 2021-22,Sl-2
Repairing work of Hariharpara to Rukunpur road from 2.00 km to 2.50 km, 5.00 km to 6.00 km and 7.00 km to 7.47 km under Murshidabad Highway Division No.I. during the year 2024-2025.
Replacement of damaged wearing coat of Nandai Bridge at 53.50 km of STKK Road under Burdwan South Highway Division in the district of Purba Bardhaman during the year 2024-25. (Non Plan) (1st Call)
Restoration of Habra Kumra Road near 9.50 km for a stretch of 40.00 m. by cement concrete paver block including embankment protection under Barasat Highway Division No.I in the district of North 24 Parganas.
Garidhura-Mirik-Simanabusty Road, Emergent Restoration works of khad side slip 16.50Kmp, 16.60Kmp, 16.90Kmp, 17.50Kmp, 20.10Kmp, 21.10Kmp and 24.00Kmp damaged due to heavy rainfall under Darjeeling Highway Division in the district of Darjeeling durin
Manbazar-Bansa Road from 4.175 Km to 4.27 Km, (Total Length 99.00 mtr. ) , Restoration work due to probable damage caused for the pipe line (JICA) under Purulia Highway Division. (Deposit work of PHE Department)
Immergent Rain Damage restoration work of River bank Beside Joist Bridge over River Gadadhar ( at krishnapur End) at 4th KM of Choto Mahadev Village Road under Coochbehar Highway Division in the District of Coochbehar.
Road safety works (Short Term Measure) at Kestopur on K.N.I. Avenue (VIP Road) near sluice lock gate of upper Bagjola Canal under Barasat Highway Division No. - I in the District of North 24 Parganas.
Repairing and Maintenance of Toilets and Sanitary Plumbing Works of Diamond Harbour Highway Division Office Building with some other Office Building Maintenance Works under DHHSDN of DHHD in the District of South 24 Parganas.
Construction of Temporary pandel and wooden platform at Raghunathpur Bus Buffer zone on the occasion of Gangasagar Mela - 2026 under Diamond Harbour Highway Division, P.W. (Roads) Directorate in the district of South 24 Parganas.
Rehabilitation work of cuverts at Ch. 12.94km., 13.52km., 15.20km., 15.37km., 16.22km. and 19.75km. of Sonapur-Hasimara Road via Chilapata Forest under Alipurduar Highway Division in the district of Alipurduar during the year 2025-26
Maintenance and Patch repairing work of G.T.Road (SH-13) in stretches from 584.00 km to 586.00 km under Burdwan South Highway Division, P.W.(Roads) Dte in the district of Purba Bardhaman during 2025-26
Old NH-34 Road from Km 433.510 to Km 441.890 (Surfacing work) and rehabilitation work of Bridge at Km 440.700 over River Sudani under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur.
Supplying of Security Personnel (Guard without Arms) on purely temporary basis for guarding at different Govt. offices under the control of the Executive Engineer, Northern Highway Planning Division-I, PW(Roads) Directorate, Shaktigarh, Siliguri.
Rebuiding of Badu - Kharibari Road against the damages to be done due to laying of PHE pipeline at different stretches under Barasat Highway Division-I in the district of North 24 Parganas. (Deposit work)
Burul Bowali Road , from 0.00 kmp to 2.950 km, Strengthening work, under Diamond Harbour Highway Division, P.W (Roads) Dte. in the district of South 24 Parganas . (Materials supply by the agency) Project ID-PD232412412S000
Julpia Chakdahhat Road from 0.00 kmp to 8.00kmp Except existing Mastic portion 838.00m and PHE restoration area, Emergent patch repairing work under South 24-Parganas Highway Division in the Dist of South 24-Parganas.
Abinashpur Health Centre Road from 0.00 kmp to 2.65 km and Abinashpur Sahapur Road from 0.00 kmp to 11.20 km, Surfacing work under Birbhum Highway Division-II in the district of Birbhum. (2nd Call)
Patch repair of Panchgram-Nabagram-Lalbagh Road from Ch. 15.00 Kmp to 26.80 Kmp (except from Ch. 15.465 Km to 15.560 Km) in stretches under Murshidabad Highway Division No.II during the year 2024-25
Improvement of Tamna - Hesla - Arsha Road from 0.00 kmp. to 5.00 kmp. with a link to Sirkabad under Purulia Highway Division in the district of Purulia. (CH. To Plan Head identified as 14th F.C.)
Providing round the clock security by deploying 20(Twenty) Nos. Unarmed Security Guards per day for guarding at different offices/Stackyard/Bunglow under Barasat Highway Division No.II in the district of North 24 Paraganas
Construction of 4(four) cell of size 4 m x 4 m Box culvert at Ch. 2.5 km of Patgram Bhutan cross road under Cooch Behar Highway Division in the district of Cooch Behar.
Beliaghata Prithiba Road at 7th Km and Santoshpur Duttapukur Road at 5th Km - Construction of speed breakers at selected spots under Barasat Highway Division No.II in the district of North 24 Pgs..(2nd Call)
Link Road From G.T Road to Boinchee Health Centre from 0.00 kmp to 1.30 km- Widening and Strengthening work under Hooghly Highway Division No.- II in the District of Hooghly, West Bengal. (2nd Call)
Mejia Kusthal Road, from Ch 2.00 kmp to Ch 6.00 kmp and from Ch7.0 kmp to Ch 9.00 kmp, in stretches Maintenance and repairing work under Bankura Highway Division in the district of Bankura.
Potholes and Surface repairing in streches from 2.000 km to 6.000 km of Keshpur Chandrakona Town Road (SH-7) under Midnapore Highway Division in the district of Paschim Medinipur during the Year 2026-27.
Emergent restoration of rain damages of embankment and flank protection of Vendabari to Mahapukur Road from 1.50 km to 5.50 km in stretches under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Providing round the clock security by deploying 20 Twenty Nos. unarmed Security Guards per day for guarding at different offices Stackyard Bunglow under Barasat Highway Division No.II in the district of North 24 Paraganas
Preparation of Detailed Project Report DPR for the work of Jantahat Bhulki Road from 0.00 kmp to 13.45 kmp Widening and Strengthening work in the district of Uttar Dinajpur under Uttar Dinajpur Highway Division
Detailed survey and preparation of detailed project report for the work of Chotomahadev village road from 0.00kmp to 6.00kmp strengthening work under Coochbehar Highway Division, In The District Of Coochbehar including preparation of PPT
Emergent repairing and maintenance work of Debra - Sabang Road from 0.400 Kmp to 4.00 Kmp in stretches under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. To Non-Plan/ Rain Damage restoration)
Byapari Para (Pradip Byaparis House) to Krishnapur-Tufanganj road via Gourmohan Bazar, from 0.00km to 2.0km, emergent rain damage restoration work in stretches under Cooch Behar Highway Division in the district of Cooch Behar
Tree Plantation at Amta Rajapur Dihibhurshut 12.00 Kmp to 22.85 Km and Munshirhat Penro Khila Rajapur Road 12.00 Kmp to 13.60 Km, under Howrah Highway Division, PW ( R ) Dte. during the year 2024-25.
Preparation of Detailed Project Report (DPR) for the work of Ramnagar-Bazarshaw-Chowrigacha-Khagraghat Road (MDR) from 0.00 Kmp to 28.396 Kmp., Strengthening Work under Murshidabad Highway Division No.II in the district of Murshidabad
Restoration of damage of Link Road to NH 41 along the bank of Sankarara Khal Road caused due to laying of PHE pipe line under Tamluk Highway Division in the District of Purba Medinipur
Providing round the clock security by deploying 20 (Twenty) Nos. Unarmed Security Guards per day for guarding at different offices/Stackyard/Bunglow under Barasat Highway Division No.II in the district of North 24 Paraganas
Permanent road restoration work due to laying of PHE pipeline from 0.00 Kmp. To 1.138 Km. of Bishnupur - Pathorghata Road under Barasat Highway Division-I in the district of North 24 Parganas. (Deposit work)
Dressing and chilchalling at both side of Kachuberia - Gangasagar road flanks from 0.00 kmp to 30.00 kmp of Kachuberia Gangasagar Road at Sagar Island under Diamond Harbour Highway Division for ensuing G.S. Mela - 2026
Procurement of A3 Size Laser jet Multifunction DADF Network Color Photocopier for The Office of The Executive Engineer, Hooghly Highway Division No. I, P.W. Roads Directorate Vivekanda Road, Pipulpati, in the district of Hooghly
Pankhabari Kurseong Road, Repairing of culvert and protective work at ch. 1.30 Km road bench damaged due to heavy rainfall under Darjeeling Highway Division in the district of Darjeeling during the year 2024-25.
Emergent restoration of Sagar IB Building and Boundery wall for damage caused by the recent cyclonic storm YASH under Diamond Harbour Highway Division in the district of South 24 Parganas for during 2021-22
Link road from G.T. Road to Khana Junction rly station road from0.00kmp. to 2.60km., surfacing work under Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman during the year 2021-22
Emergent repair of potholes in different stretches including 20 mm PC and SC (in patches) of Debogram Tehattaghat Road from 1.00 Kmp. to 5.00 Kmp. under Nadia Highway Division No. I during 2020-2021
Outsourcing of security personnel for Guarding of the Office premises Stackyard Scheme sites Rest Shed Residential complex etc Round the clock for protection of Government materials and other properties under Uttar Dinajpur Highway Division
Single cell box culvert (2.0mx2.0m) at 3.50 km of Saptibari health centre to Ranirhat link road, construction work by replacing old and weak HP culvert under Jalpaiguri Highway Division in the district of Jalpaiguri.
Engineering Study including Road Inventory, Topographical Survey, Traffic Study, Pavement Soil Investigation etc. and submission of Reports for Moshat - Dhitpur Road from 0.00 Kmp. to 11.26 km. under jurisdiction of Serampore Highway Sub-Division
Construction of Storm water RCC side drain from 13.245km to 13.675 km on both side of Poktapole -Dasagram Road under Midnapore Highway Division in the District of Paschim Medinipur. Ch. To SDMF / Non-Plan.
Laying of concrete block over Chandnagar-Badu road near Abdalpur for 185.00 m at 2.00 kmp under Barasat Bridge Sub-Division of Barasat Highway Division No-I, in the district of North 24 Parganas
Emergent Floral Decoration at Median Verge and Road side Govt. land on KNI Avenue (VIP Road) from 5.15 Km. to 8.05 Km. under Barasat Highway Division I in the district of North 24 Parganas.
Replacement of damaged culverts and cross drains at different location in between 0.000 Kmp and 23.600 Km of Bora Seakhala Jangipara Road under Hooghly Highway Division I in the District of Hooghly. 2nd call.