Loading…
Loading…
11,263 results • Best match
Repairing potholes in stretches from 0.00 kmp to 6.00 kmp and 12.00 kmp to 20.00 kmp of Dhadika - Kalyanchak Road under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
Protection of road side flank from 4.50km. to 5.00km. (Right side road flank) near Jhora-II of Kalchini-Jaygaon Road under Alipurduar Highway Division in the district of Alipurduar during the year 2021-22.
Taldangra Panchmura Chowbeta Road from ch 0.00 kmp. To ch 10.00 kmp. ( in stretches), installation of Metal Beam Crash Barriers and restoration of road flank under Bankura Highway Division in the district of Bankura.
Replacement of damaged H.P Culvert by 1000 mm dia (NP-4) H.P at Ch. 0.350 km of Dhadika - Kalyanchak Road under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. to Non-Plan)
Balurghat Laskarhat Road from Ch. 19.20 km to 19.575 km, Urgent repairing of Hard Shoulder and allied works under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur during the year 2025-2026.
Link Road to Margram H.C. from Kuli-Margram Road from 0.00 Km to 4.77 Km urgent Rain Damage Repair in stretches and allied work under Murshidabad Highway Division No.II during the year 2025-26
Emergency rain damage restoration and allied works from 0.00kmp to 3.80kmp of NH-31 to Madhupur Dham Haripur Dham Road under Cooch Behar Highway Division, PWD (R) Directorate in the district of Cooch Behar.
Inspection Road along Lower Bagjola Canal from 13.40km to 15.40km, Widening and strengthening work including construction of four number cross drainage structures under Barasat Highway Division I in the District of North 24 Parganas.
Construction of W Metal Beam Crash Barrier along the road side at different stretches of Badkulla Kulgachi Road under Nadia Highway Division No.- I in the District of Nadia during the year 2019 2020
Load test of newly constructed Bridge over river Dwarka at 21.454 Km of Berhampore-Kandi-Sultanpur Road, Construction, Replacement existing old and narrow bridge under Murshidabad Highway Division No.II in the district of Murshidabad.
Emergent repair of potholes in different stretches including 20 mm PC and SC (in patches) of Plassey Betai Road from 1.00 Kmp. to 18.00 Kmp. under Nadia Highway Division No. I during 2020-2021
Construction of Bituminous Road from Amlani Kastechora Sluice Gate to Mohanpur PMGSY 3.50 km road at Hasnabad Block in the District of North 24 Parganas under Barasat Highway Division No-I. (SDB Deposit Work).
Emergent repair and maintenance of the office of the Chief Engineer, West Zone, P.W.(Roads) Directorater under Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman during the year 2022-23
Dressing and chilchalling at both side of Kachuberia - Gangasagar road flanks from 0.00 kmp to 30.00 kmp of Kachuberia Gangasagar Road at Sagar Island under Diamond Harbour Highway Division for ensuing G.S. Mela - 2025.
Permanent road restoration work due to laying of PHE pipeline from 0.00 Kmp. to 1.60 Km. at Basirhat - Swarupnagar Road under Barasat Highway Division I in the district of North 24 Parganas. (Deposit work)
Damda-Chakoltore-Daradi-Kenda-Manbazar Road (SH-5) Ch. from 24.00 Kmp to 32.00 Kmp, Repairing of road surface in stretches including traffic calming measures under Purulia Highway Division in the District of Purulia.
Repairing and Rehabilitation of Kulti Bridge at 32.20km of Kolkata-Basanti Road (SH-3A) under South 24 Pgs Highway Division in the district of North 24 Pgs during the year 2023-24(SL-01)
Permanent road restoration work due to laying of PHE pipeline from 4.50 Km. to 9.00 Km. at Basirhat - Swarupnagar Road under Barasat Highway Division- I in the district of North 24 Parganas. (Deposit work)
Botolbari Rudel Road at 6.45 km 11.60 km 13.05 km 14.10 km and 16.20 km emergent restoration of carriageway by bricks stitching work under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Construction of 2(Two) Cell RCC Box Culvert in Replacement of existing Narrow Culvert at chainage 2.329 KM of Chandnagar Badu Road under Barasat Highway Division - I in the district of North 24 Parganas.
Gosalamore to Fatapukurmore road from Ch.0.00kmp to 19.50km for emergent repairing of potholes and damaged road surface(in stretches) under Jalpaiguri highway division in the district of Jalpaiguri during the year 2020-21.
RANDHAMALI TO BODAGANJ ROAD FROM CH. 5.00KMP TO 6.30KM FOR EMERGENT REPAIRING OF POTHOLES AND DAMAGED ROAD SURFACE (IN STRETCHES) UNDER JALPAIGURI HIGHWAY DIVISION IN THE DIST. OF JALPAIGURI DURING THE YEAR 2023-24
Construction of 20(twenty) capacity passenger shelter at 7th KM of Cooch Behar- Baneswar-Alipurduar Road (SH-16)under Cooch Behar Highway Division in the District of Cooch Behar during the year 2018-19.
Construction of proposed New Bridge over river Kuji Diana in replacement of old bridge at 3rd km on Chengmari Nagrakata Road under Jalpaiguri Highway Division in the district of Jalpaiguri. Project ID PD 242527121S000.
Sui Bridge over river Sui at 15 th km of Churaman Itahar Kushmandi Road Lifting of approach slab by jacking and allied works under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur
Emergent rain damage restoration work of River bank Beside Joist Bridge over River Gadadhar (At Krishnapur End) at 4th Km of Choto Mahadev village Road under Coochbehar Highway Division in the district of Coochbehar.
Simlapal Bhutsahar road from Ch 0.00 Kmp to Ch 2.00 Kmp and Ch 8.00 Kmp to Ch 11.00 kmp in stretches, Maintenance and Repairing work under Bankura Highway Division in the district of Bankura.
Peshoke-Mungpoo Road Emergent Restoration of disastrous landslide at Ch. 12.040 Km, Ch. 12.405 Km and Ch. 12.480 Km Khadside under Darjeeling Highway Division in the district of Darjeeling during the year 2024-25
Jhorermore to Khuribhanga Pumping Station Road from 0.00 kmp to 5.00 kmp, Emergent restoration work in patches and other allied work under South 24 Parganas Highway Division in the District of South 24 Parganas.
Restoration of Right side flank from Ch. 0.100 Km to 0.120 Km of Chakchaka to Khoardanga Bazar Road Netaji Road under Alipurduar Highway Division in the district of Alipurduar during the year 2025 2026.
Planting of Saplings and maintaining them for one year alongside link road to Kaljani Health Centre road from 6.00km to 8.00km (in stretches) under Cooch Behar Highway Division in the district of Cooch Behar.
Repairs / painting of the Furnitures, Almirahs, Tables, Chairs and other allied accessories of office of the Asssistant Engineer, Jhargram Highway Sub-Division Shifting of remaining furnitures, Almirahs, Tables, Chairs 4-storied PWD Office Building
Berachampa-Prithiba Road from 7.00 kmp to 11.96 km, Strengthening work under Barasat Highway Division No. II, in the District of North 24 Parganas. 2nd Call of NIT-3 of 2021-22,Sl-3
Providing round the clock security by deploying 20 (Twenty) Nos. Unarmed Security Guards per day for guarding at different offices/Stackyard/Bunglow under Barasat Highway Division No.II in the district of North 24 Paraganas.
The Link Road from Guma Rajibpur BaliSa Road to Bira Railway station road, from 0.00Kmp. To 3.60 Km, Widening - Strengthening work under Barasat Highway Division No. II in the District of North 24 Parganas
Goaltore - Hoomgarh Road from 8.660 Kmp to 16.00 Kmp patch repair work under Midnapore Highway Division in the District of Paschim Medinipur in the year 2021-2022 (Ch. To Non-Plan/ Flood damage repair)
Chilakhana Natabari road to Harimandir road via Andaranfulbari-II GP from 0.00 Kmp to 1.875 Km urgent patch repairing works at different stretches under Cooch Behar Highway Division in the district of Cooch Behar.
Baradighi-Nagrakata road from chainage 0.00 kmp to 2.00 kmp and 4.00kmp to 6.00kmp repairing potholes and damaged wearing surfaces under Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2020-21.
Laying of different diameters HDPE pipe in distribution pipe lines by Horizontal Directional Drilling (HDD) process at different locations for Canal / Road crossing adjacent to Basanti Highway under TARDAH KAPASATI, BHATIPOTA, KHARAMBA and SHERPUR
Berhampore-Hariharpara-Amtala road for construction of high drain from 0.00 km to 0.50 km L S in Paray Samadhan programme under Murshidabad Highway Division No-I in the district of Murshidabad (2nd Call).
Emergent repairing and Maintenance work of Sabong - Mohar Road from 8.00 Kmp to 12.00 Kmp in stretches under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. To Non-Plan/ Rain Damage restoration)
BOX Culvert (2cell 2m x2m) at 1.20 km of Mahiskuchi Village Path, Construction work by replacement of damaged HP culvert under Cooch Behar Highway Division in the District of Cooch Behar. Project ID- PD202131015S000
Rampur Chakulia Road from 0.00 kmp to 4.00 kmp repairing potholes and protective work in stretches and repairing culvert at Ch. 5.33 km in the district of Uttar Dinajpur under Uttar Dinajpur Highway Division
Emergent restoration work of river bank besides joist bridge over river Gadadhar (at Krishnapur end) at 4th Km of Choto Mahadev Village road under Cooch Behar Highway Division in the District of Cooch Behar
Kulti Haritala to Jamna Bus stand via Krishnapur, Baharkuli, Sargoria road from 5.00 kmp to 7.50 km (in stretches) emergent maintenance and repairing work under Burdwan South Highway Division during the year 2025-26.
Gosalamore to Fatapukurmore Road at ch. 9.50km to 13.50km for emergent repairing of potholes and damaged road surface (in stretches) under Jalpaiguri Highway Division in the dist. of Jalpaiguri during the year 2025-26
NH-34 Gadamarahat to Mondouri Road from 0.00 kmp to 9.00 kmp (Except from 2.071 km to 3.704 km), Surfacing work under Barasat Highway Division No. II in the district of North 24 Parganas
Fatapukur to Gadra road at chainage 6th km Sahu Bridge both side approach damaged side drain improvement and boulder Pitching on slopes and allied works under Jalpaiguri Highway Division during the year 2025-26
Deocharai Balarampur road (Chilka Sadhu Ghat Par) to Dinesh Barmans House via Ranjan Barmans House ..patch repairing work in stretches under Coochbehar Highway Division in the District of Coochbehar during the year 2022-23.
Lawhati Haroa road from 0.00 Kmp. to 18 Kmp. (Except Mastic Asphalt ICPB Zone) Surfacing work under Barasat Highway Division No. - I in the District of North 24 Parganas, West Bengal Under Special Assistance.