Loading…
Loading…
11,275 results • Best match
Emergent repairing and maintenance work of Bishnupur - Radhamohanpur Rly. Station Road from 0.00 Kmp to 3.000 Kmp in stretches under Midnapore Highway Division in the District of Paschim Medinipur. (Ch. To Non-Plan/ Rain Damage restoration)
Construction of Temporary pandel and wooden platform at Ramjan Nagar Bus Buffer zone on the occasion of Gangasagar Mela 2025 under Dimaond Harbour Highway Sub Division, PW Roads Directorate in the district of South 24 Parganas.
Emergent Repairing and Maintenance work of Sabang Mohar Road from 2.00 kmp to 4.00 Kmp and 6.00 kmp to 8.00 kmp in streatches under Midnapur Highway Division in the District of Paschim Medinipur during 2025-2026.
Repairing work of Kuli-Burwan-Gramsalika-Majlishpur-Ramjibanpur Road from 24.50 Km to 25.00 Km by mending potholes ....... picked jhama bricks (in stretches) under Murshidabad Highway Division No.II in the District of Murshidabad during 2022-23
Khairasole Bara Jamtara Road MDR, 19.26 km-Repair and Rehabilitation of Hazaratpur Bridge at 4.80 km under Birbhum Highway Division II,P.W. (Roads) Dte in the District of Birbhum during the year 2023-2024.(2nd call)
Bhurkul-Katakhal-Ganeshpur PWD Road and Faridpur-Akna Road from 0.00 kmp to 4.754 kmp, Pre Monsoon Repairing and Maintenance work in patches, under South 24-Parganas Highway Division in the Dist of South 24-Parganas.
Replacement of damaged culverts by 3 No. 4mx3m Box Culverts at ch. 2.90 km, 7.80 km and 8.25 km of Bokpotaghat-Ichanagari Road under Hooghly Highway Division No. I in the District of Hooghly. 3rd call
Pankhabari Kurseong Road, Restoration work of khadside wall ch. 1.50 Km along with color wash from ch 0.00 Kmp to 8.15 Km under Darjeeling Highway Division in the district of Darjeeling during the year 2024-25.
Jungle cutting and installation of necessary road safety sign boards alongside Changrabandha Mathabhanga-Cooch Behar road from 52.00 km to 70.00 km in stretches under Coochbehar Highway Division in the district of Coochbehar during 2024-2
Construction of temporary brick paved vehicle turning area and parking zone at Harwood Point under Diamond Harbour Highway Division, P.W.(Roads) Dte. in the district of South 24 Parganas for ensuing GS Mela 2022 Spot - 4
Providing Manpower for the day to day Services i.e. House Keeping, Caretaking, Cleaning and Sweeping, Security Guard etc (Total Manpower 5 nos.) at Purulia Inspection Bungalow under Purulia Highway Division, P. W. (Roads) Directorate. (2nd Call)
Beldanga Amtala Patikabari road from 5.00 kmp to 11.00 kmp, Repairing of road(in small stretches) with W.B.M, bituminous pot holes, Premix surfacing and seal coat under Berhampore Highway Sub-Division of MHD-I, 2nd call
Shekdighi More on NH 34 towards west side via Banyeshwar Panchayat to Dhobapukur Badshaee Road More (VR) from 0.00Km to 0.320Km and 0.980Km to 5.00Km for Surfacing Work under RHSD under Murshidabad Highway Division No. I
Providing round the clock security Services by deploying 14 Fourteen Nos unarmed Security Guards per day for guarding at different offices Stack yards Temporary Rest shed under the control of Jhargram Highway Division PWRoads Directorate in
Construction of Speed Breaker, Installation of Retro Reflectorized Traffic Signs and Road Marking for Different Black Spots of Joynagar Jalaberia Kultali Road under LKPHS of Diamond Harbour Highway Division in the District of South 24 Parganas.
Hogol Bridge at ch. 85.900 Km of Kolkata-Basanti Road, application of Protective Coating along with other allied rehabilitation and erosion control works under South 24 Pgs Highway Division in the district of South 24 Parganas.
Goaltore - Hoomgarh Road from 8.66 km to 16.00 kmp, patch repair work under Midnapore Highway Division in the district of Paschim Medinipur during 2021-2022. (Ch to Non-Plan / damage caused due to cyclonic storm YAAS)
Laying of HDPE Pipe Line from Manjushree to Sutahata Subarna Jayanti Bhawan under Ward No. - 01,02,03,04 and 05 within Haldia Municipality. For Proposed work of Panskura to Durgachak road (SH - 4 ), PWD Haldia Highway Sub - Division.
Recovery and restoration work of Keshpur Narajole Rd from 0.00to 17.680km, Total Length 17.680km (Excluding PQC and Jhalka Bridge Stretch), under Midnapore Highway Division for mending up damages occurred due to heavy rainfall/ flood like situation.
Patrasayer Market Road from 0.00 kmp to 2.50 km, Restoration work of both side of road due to laying of pipe lines by Bankura Division, PHE Dte. under Bankura Highway Division in the District of Bankura
Construction of Guide bank at Voisbhita side of newly constructed R.R.C bridge accross river Barrong at 2nd km of Voishbhita Soldidhi road under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur. Project ID PD232414739S000
Recovery and Restoration work of Tutapakri to Garalbari road from 0.30 km to 5.20 km under Jalpaiguri Highway Division in the district of Jalpaigur for mending up damages occurred due to heavy rainfall / flood like situation.
Geotechnical Investigation in connection with the construction of New Bridge over Noai Khal at 1.40 Km. Doltala- Ganganagar Road in place existing narrow Bridge under Barasat Highway Division I in the district of North 24 Parganas
Prajabar Arankiarana Road from 0.000 Km to 4.000 Km temporary rain or flood damaged repair in patches under Tamluk Highway Division in the District of Purba Medinipur during the year 2021 2022. Ch. To Non Plan
Bishnupur Sonamukhi Rangamati Road from Ch 11.00 kmp to Ch 14.00 kmp and from ch. 20.00 kmp to ch 23.00 kmp (in stretches) repairing and maintenance work under Bankura Highway Division in the District of Bankura.
Dressing and chilchalling of Road flanks, cutting of kutcha drain etc. from CH 0.00 Kmp to 44.80 km of Bankura Saltora Road in stretches under Bankura Highway Division, P.W. Roads Directorate in the district of Bankura.
Balighai Mohanpur Road from 6.00 km to 10.00 km, temporary patch repairing works by 20 mm PC and SC in stretches under Tamluk Highway Division in the district of Purba Medinipur during the year 2024 2025
Garidhura-Mirik-Simanabusty Road from 40.00 kmp to 41.81 km and 43.12 km to 45.00 kmp bituminous patch repair works in stretches under Darjeeling Highway Division in the district of Darjeeling during the year 2022-23.
Dhamua-Amratala Road, from 0.00 kmp to 5.00kmp, Emergent Restoration work in patches and Cross drain damaged caused due to YAAS under South 24 Pgs. Highway Division in the Dist. of South 24 Parganas.(SL-02) .
Construction of R.C.C. Bridge at Pankhabari over River Dhobikhola at 21st Kmp of Matigara Kurseong Road in replacement of old narrow steel bridge under Darjeeling Highway Division in the district of Darjeeling., Project ID PD 242525651S000
Sonirmore Kadamtala Road from 0.0 kmp to 1.130 km, 2.190 km to 2.820 km, 3.215 km to 3.855 km, Emergent patch repairing work under South 24-Parganas Highway Division in the Dist of South 24-Parganas.
Tapan School more to Vikahar via Ramchandrapur Road from 0.00 Kmp to 6.00 Kmp (in Stretches), Urgent patch repairing works under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur - during the year 2024-25.
Double Cell Box Culvert (3 m X 3 m) at 0.015 km of Fatapukur - Gadra Road, Construction work in replacement of damaged Slab Culvert under Jalpaiguri Highway Division in the district of Jalpaiguri. Project ID PD202131792S000.
Repairing of potholes and mending depressions of Tufanganj-Dhalpal-Bhatibari road portion from 5.00 kmp to 9.50 kmp under Coochbehar Highway Division in the District of Cooch Behar during the year 2018-19 (under N.P. Head)
Belacoba to Fatapukurmore road from ch.18.00 kmp to 20.50 km for Emergent repairing of potholes and damaged road surface 9in stretches) under Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2022-2023.
Garidhura-Mirik-Simanabusty Road, Emergent Restoration at khade side road bench damaged due to heavy rain at 17.3 Km under disaster urgency under Darjeeling Highway Division in the district of Darjeeling during the year 2023-24.
Boinchee Bhastara Majinan Belmuri Road from 11.300 km. to 20.600 km. (except mastic zone and 15.800 km to 16.700 km), surfacing work including protective work under Hooghly Highway Division No. I in the District of Hooghly
Link Road of STKK Road to Panchpara - Dawarpara Road from 0.00 km to 4.584 km, Widening and Strengthening work under Hooghly Highway Division No.- II, P.W.(Roads) Directorate in the District of Hooghly under RIDF-XXX.
Mohisgote pole to Chattabazar Road, Reconstruction of damaged Culvert at 1.80 km by BOX CELL Culvert with necessary approach road and diversion road under South 24 Parganas Highway Division in the Dist. of South 24 Pgs.
Repairing work of Kuli-Burwan-Gramsalika-Majlishpur-Ramjibanpur Road from 22.50 Km to 23.00 Km and 25.50 Km to 26.00 Km by mending potholes ........ (in stretches) under Murshidabad Highway Division No.II during the year 2021-22.
Prajabar Arankiarana Road from 5.923 Km to 11.262 Km temporary rain or flood damaged repair in patches under Tamluk Highway Division in the District of Purba Medinipur during the year 2021 2022. Ch. To Non Plan
Tamna-Helsa-Arsha Road from 0.00 kmp to 5.00 kmp., 14.00 kmp. to 18.00 kmp and Link Road to Sirkabad, Surfacing work under Purulia Highway Division in the district of Purulia. Project ID PD212244018S000. 3rd Call
Double barrel 1200 mm dia NP4 hume pipe culvert at 68.80 km of Cooch Behar -Mathabhanga Road (SH-16), Re- construction work under Cooch Behar Highway Division in the district of Cooch Behar. Project ID PD202130192S000
Recovery and restoration work of English Bazar-Kotwali Road from 4.00 Km to 8.20 Km under Malda Highway Division in the district of Malda for mending up damages occurred due to heavy rainfall / flood like situation.
Traffic Calming Measures for Sonakhali Bharat Sebasrom at 83.90 km and Basanti St. Teresas Girls High School HS at 86.40 km of Kolkata-Basanti Road SH-3A within Basanti PS under South 24 Parganas Highway Division.
Construction of temporary bus turning area to parking zone at ONGC Road under Diamond Harbour Highway Division in the district of South 24 Parganas for ensuing Ganga Sagar Mela 2021. for ensuing Ganga Sagar Mela 2021.
Baradighi Nagrakata Road from Ch. 3.00 kmp to 4.50 km, 5.10 km to 7.00 kmp and 8.00 kmp to 13.00 kmp, Surfacing work under Jalpaiguri Highway Division in the district of Jalpaiguri. Project ID PD 212243680S000.
Recovery and restoration of flanks and embankment protection works at Ch. 11.630kmp. of Hasimara-Jaigaon Road down stream side of BEBARI BRIDGE under Alipurduar Highway Division in the district of Alipurduar during the year 2025-26.
DVC Feeder Road (including Rly. Station Link) from 0.00 kmp. to 4.00 kmp and 0.95 km. (link), Surfacing work under Asansol Highway Division, in the district of Paschim Bardhaman during the year 2021-22. (3rd call)
Recovery and Restoration (Land Slide) works of Garidhura-Mirik-Simanabusty Road at Chainage. 30.6, 26.95 and 32.9 Km for mending up damages occurred due to heavy rainfall under Darjeeling Highway Division in the district of Darjeeling