Loading…
Loading…
11,049 results • Best match
CONSTRUCTION OF METAL ROAD FROM SANATAN MAHATO HOUSE AT SEVAYATAN ON JHARGRAM MEDINIPUR STATE HIGHWAY TO SUDRAGURI HEALTH CENTRE VIA SUDRAGURI CULVERT AND UP TO THE END OF BANSKANA VILLAGE UNDER BOITA GP, BINPUR-I BLOCK IN THE DISTRICT OF JHARGRAM
Road Crossing of distribution Main Pipeline with 300 mm Road Crossing of distribution Main Pipeline with 300 mm dia. M.S. Pipe and Casing as 700 mm dia. M.S. Pipe in connection with Berhampore-Hariharpara-Amtala state highway of Raipur state highwa
Preparation of Detailed Project Report (DPR) for Diversion of State Highway No. 9 (Bankura-Durgapur Road) From KM 35.740 To KM 38.540 stretching about 2.8 km within the Mine Boundary of Trans Damodar Coal Mine vested to the Durgapur Projects Ltd.
Panskura Ghatal Road from 20.00km to 25.00km Patch repair under Midnapore Highway Division in the district of Paschim Medinipur during 2020-2021. (Ch to damage caused due to Cyclonic storm AMPHAN) (2nd Call)
Supply of ready to use potholes repair material for all weather resilience for rapid maintenance using steel slag road Technology for sustainable road maintenance approved by CSIR-CRRI, New Delhi for Mathabhanga Highway Sub-Division under Cooch Behar
Purchase of Furniture in connection with newly constructed inspection Bungalow at Purulia Under Purulia Highway Division, P.W.(Roads) Dte. in the district of Purulia. Project ID PD232407083S000
Refer to BOQ
Emergent rain damage repair of Domohani-Gourandi-Runakuraghat Road from 6.0kmp. to 12.0 kmp. Under Asansol Highway Division in the district of Paschim Bardhaman during the year 2021-22
Strengthening/Rehabilitation of NH-2E Belghoria Expressway from Km 0.000 to 7.363 (excluding from Km 2.900 to 4.250 BHS) including all structures under North 24 Parganas district in the state of West Bengal on EPC mode
Construction of Shops in front of G.P. office adjacent to Highway under Bidhannagar-II G.P 2023-24 of 5th SFC Fund
SITC of Inverter with allied Electrical work at Kalyani Inspection Bungalow under Nadia Highway Division - II, P.W. Roads Dte., Kalyani, Nadia.
Surface Dressing works at Mangalbari Rest Shed Banglow Stackyard and allied works under Malda Highway Division, during the year 2022 2023.
Emergent repair of potholes at Majerhat Bridge under Howrah Highway Division in the Dist. of Howrah during the year 2025-26
Repairing and renovation of outdoor compound light under Buniadpur Highway Sub Division P.W. (Roads) Dte. In the District of Dakshin Dinajpur
Installation of Split AC at Computer Room of Nadia Highway Division-II, PW Roads Directorate under Kalyani Electrical Sec-I, PWD.
Sadullapur to Meharapur Road from 0.00 Kmp to 4.15 Km, Surfacing work under Malda Highway Division in the district of Malda.
Construction of Storm water Drain from Jakir Hosseain to Kalyani Highway at Sansad - I, under Kowgachi-2 G.P(Activity Code-94914749)
Construction of Paver block pathway at Rudranagar Stackyard at Sagar Island under Diamond Harbour Highway Division during the year 2025-26
Construction of drain from Lalgola Jangipur Highway to Kali Mandir of village at Jote Kamal GP under Raghunathganj II Block
Construction of Road from Basanti Expressway Ramchandrakhali
Durgapur Expressway to Pyrauro under Singur Block
5th Year Maintenance of Landscaping and Beautification at Vidyasagar Setu Toll Plaza and Approaching Road from Toll Plaza to Kona Expressway for the Period 1st Apr 21 to 31st Mar 22 under Ex-Officio Manager, GPW, WBFDCL and DCF, URFD during 2021-22.
Supply and Installation of new compound lights in side the Stack Yard areas of Palassey Highway Section PWD Roads Palassey in the dist of Nadia
Baradighi Nagrakata Road from 1.00 kmp to 2.00 kmp repairing potholes and damaged wearing surfaces under Jalpaiguri Highway Division in the district of Jalpaiguri
Chalsa-Matelli Road from 6.00 kmp to 8.00 km repairing potholes and damaged wearing surfaces under Jalpaiguri Highway Division in the district of Jalpaiguri.
Refer to BOQ
Emergent Repair and maintenance work to the Road from Nagrakata to Ramsai Road for reparing of Pot-holes patch surfacing work from Ch.3.50KM to ch.5.00KM Road under Jalpaiguri Highway Division in the district of Jalpaiguri during the year 2023-24
Illumination of street light with 7.5 mtr MS Tubular pole with single arm and 90 w LED fixtures from Panskura canel bazar more via kanakpur PWD State highway bridge to sitala mandir and Mahatpur NHAI BYPASS Road to Panskura B.B. High School Boarding
Emergent rain damage repair to Asansol Byepass to Domohani Road (FR-6) from 5.0 kmp.to 6.5 kmp. Under Asansol Highway Division in the district of Paschim Bardhaman during the year 2021-22
Adina Chakli Road, from 0.00 km to 2.76 km, Surfacing work under Malda Highway Division in the District of Malda 2nd call.
Kharia Bridge at 2.10 km of Seikhpur Kumarganj Road, Rehabilitation and repair work under Malda Highway Division in the district of Malda.
Paharpur Swarupganj Road from Ch. 7.00 km to 8.20 km, Repairing Bituminous surface under Malda Highway Division, in the district of Malda.
Paharpur Swarupganj Road from Ch. 4.75 km to 5.80 km, Repairing Bituminous surface under Malda Highway Division, in the district of Malda.
Internal communication road in Pandua from 0.30 kmp to 2.60 km, Surfacing work under Malda Highway Division in the district of Malda.
Paharpur Swarupganj Road from Ch. 11.20 km to 11.95 km, Repairing Bituminous surface under Malda Highway Division, in the district of Malda.
Kaliachak to Niyamatpur road, Culvert at Ch. 4.10 km repairing Work under Malda Highway Division, P.W.Roads Dte, in the District of Malda.
Paharpur Swarupganj Road from Ch. 6.00 km to 6.90 km, Repairing Bituminous surface under Malda Highway Division, in the district of Malda.
Paharpur Swarupganj Road from Ch. 8.50 km to 9.40 km, Repairing Bituminous surface under Malda Highway Division, in the district of Malda.
Paharpur Swarupganj Road from Ch. 1.15 km to 2.10 km, Repairing Bituminous surface under Malda Highway Division, in the district of Malda.
Paharpur Swarupganj Road from Ch. 2.40 km to 3.50 km, Repairing Bituminous surface under Malda Highway Division, in the district of Malda.
Paharpur Swarupganj Road from Ch. 0.00 km to 0.90 km, Repairing Bituminous surface under Malda Highway Division, in the district of Malda.
Chanchal office campus internal Road from 0.00 km to 0.155 Km Surfacing work under Malda Highway Division in the District of Malda.
Paharpur Swarupganj Road from Ch. 9.45 km to 10.25 km, Repairing Bituminous surface under Malda Highway Division, in the district of Malda.
Mothabari to Uttar Lakshipur Road from 0.00 Km to 3.20 Km, Surfacing work under Malda Highway Division in this district of Malda.
Construction of CC road from Highway to Tatarpur Barowari Tala under Nimo-I GP under Pathashree 2.0(Sl. No.-01)(2nd call)
Provision for one new toilet at Eastern Highway Circle, PWD at Room No 105 of Purta Bhavan, during the year 2025-2026.
Gazole Bamongola Road MDR from 0.00 km to 8.00 km, Patch repairing work under Malda Highway Division in the district of Malda.
Paharpur Swarupganj Road from Ch. 3.60 km to 4.60 km, Repairing Bituminous surface under Malda Highway Division, in the district of Malda.
Paharpur Swarupganj Road from Ch. 10.30 km to 11.10 km, Repairing Bituminous surface under Malda Highway Division, in the district of Malda.
Preparation of Detailed Project Report DPR for Egra Ramnagar road from 5.500 km to 27.100 km Strengthening Work under Tamluk Highway Division