Loading…
Loading…
11,049 results • Best match
Surfacing work for Itindaghat-Ghojadanga Road from 0.00 kmp. to 1.05 kmp. under Barasat Highway Division-I in the district of North 24 Parganas
Emergent repair of Gopalpur-Haroa Road from 13.40 Km. to 13.60 Km. under Barasat Highway Division-I in the district of North 24 Parganas
Construction of road at Arabinda pally from Pradip Ghosh house to Kajal Chatterjee house......to Highway in Ward No- 20 within Part No- 97
Emergent repair of Martin Burn Road from 2.50 km. to 4.20 km. under Barasat Highway Division-I in the district of North 24 Parganas
Box Bridge at 8.00 km of Bhaluka Road Railway Station to Tulshihata Road, Rehabilitation work under Malda Highway Division in the district of Malda.
Adina to Chakli Road from 30.50 km to 33.62 km in stretches Potholes repairing work under Malda Highway Division in the district of Malda.
Adina to Chakli Road from 25.66 km to 29.00 km in stretches potholes repairing work under Malda Highway Division in the district of Malda.
Construction of Concrete Road from Tarulia Highway to Sahid Mistry House under Loba GP, JL no 163,Plot no 657/659, Activity code 57812577
Patch repair of Jagatpur road of from 0.40 km. to 1.20 km. under Baguihati Highway Sub-Division in the District of North 24 Parganas.
Construction of Road from Basanti Highway towards City English School,Daag 1612,JL 100,M Kalikapur under Pranganj GP of Bhangar I Panchayat Samity
Malda Bulbulchandi Road at Muchia Replacement of damaged and broken RCC drain cover slab work under Malda Highway Division in the district of Malda.
CC road from Niren Barman house to Asian Highway, at P/S No. 44 under Upper Bagdogra GP within Naxalbari Block under APAS fund
Adina Chakli Road VR from 0.50 Km to 2.76 Km in stretches Patch repairing works under Malda Highway Division in the district of Malda.
Preparation of Detailed Project Report DPR for Tajpur -Betahut road from 0.000 kmp to 9.450 km, Widening and Strengthening Work under Tamluk Highway Division
Day to day mtc of all officers store stackyards and bungalow under the control of Executive Engineer Nadia Highway Division II Roads Kalyani Nadia
CONSTRUCTION OF CC ROAD WITH DRIAN FROM NEAR HOUSE HOUSE OF GURPIT SINGH TO HIGHWAY AT SATKENDURI WARD NO 09 UNDER DUBRAJPUR MUNICIPALITY BIRBHUM
Recovery and restoration work of Khejuri Heria Road from 0.00km to 13.00km under Tamluk Highway Division, P.W.(Roads) Directorate in the District of Purba Medinipur for mending up damages occurred due to heavy rainfall/ flood like situation. 2ND CALL
Construction of BT road from Hatighisa High School to Asian Highway Mouza Sebdella Hatighisa Gram Panchayat Naxalbari Development Block under BCW TD Department fund.
Recovery and restoration work of Alangiri Bilbara Kosbagola Road from 0.00km to 7.00km under Tamluk Highway Division in the district of Purba Medinipur for mending up damages occurred due to heavy rainfall / flood like situation. 2ND CALL.
Independent Engineer services during Operation an Maintenance Period for Construction of New Bridges_ Structures, Repair of existing Four Lane Highways from Balasore to Kharagpur of NH-60 Km. 0.00 to Km. 119.300 in the State of Orissa and West Bengal
DEVELOPMENT, OPERATION AND MAINTENANCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAYS ON LEASE BASIS IN THE STATE OF UTTAR PRADESH ASSAM AND WEST BENGAL (DBOT-4 SITES)Agra - Kanpur/NH-19/451 PLUS 820/RHS/ Gadan Kheda/ Kanpur/UP
Recovery and restoration work of Mecheda-Tamluk Road from Ch. 0.575kmp to 13.80kmp, under Tamluk Highway Division, P.W.(Roads) Directorate in the district of Purba Medinipur for mending up damages occurred due to heavy rainfall / flood like situation
Gazolehat Road, from 0.00 kmp to 0.90 km, Surfacing work with Mastic Asphalt and Rigid Pavement under Malda Highway Division in the district of Malda.
Emergent repair of Kholapota-Bhebia Samsan Road from 0.00 km. to 4.00 km. under Barasat Highway Division-I in the district of North 24 Parganas
Jalalpur to Sujapur to Jamirghata Railway Station Road from 0.00 kmp to 2.10 km, Surfacing work under Malda Highway Division in the district of Malda.
Improvement of Light Traffic Road by Moorum from Service Road (Near Hotel Highway Central) to Gopalmath Sashan (Upto Bridge), Ward N0- 35, Under DMC Area
Rejuvenation of road side kerbs, separator etc. from 1.00 km. to 2.95 km. (Airport flank) of KNI Avenue (VIP Road) under Baguihati Highway Sub-Division
Compound illumination including Supply and installation of LED sign board of the Office of The Assistant Engineer Kakdwip Highway Sub Division P W Roads Dte
Maintenance repair of Madartola Chayani Bazar Road from 0.00 kmp. to 2.00 kmp. under Barasat Highway Division-I in the district of North 24 Parganas
Surfacing work of Badu-Maheshwarpur Road from 0.00 Kmp. to 1.00 Kmp. under Barasat Highway Division No.-I in the district of North 24 Parganas
Construction of RCC drain from Asian highway via BL AND LRO office via St Jons School to Manarbari near Railway track Changrabandha GP Dist Coochbehar
Alternative route to Balurghat from Malda from 0.00 kmp to 3.80 km, Surfacing work under Malda Highway Division in the district of Malda 2nd call.
Maintenance repair of Mogra-Keotsha Road from 2.00 kmp-6.00 kmp. in patches under Barasat Highway Division-I in the district of North 24 Parganas
Bhagirathi bridge over River Bhagirathi at 16.00 kmp of Kaliachak Niamatpur road, Rehabilitation work under Malda Highway Division in the district of Malda 2nd Call.
Bridge over river Mora Mahananda at 1st kmp of Pukuria Ferryghat to Kumarganj Road, Rehabilitation work under Malda Highway Division in the district of Malda.
Emergent maintenance repair of Berachampa-Baduria Road from 2.00 kmp. to 4.00 kmp. under Barasat Highway Division-I in the district of North 24 Parganas
Hiring of One No. inspection vehicle for 01(One) year for the office of the Assistant Engineer, Kakdwip Highway Sub-Division, P. W. (Roads) Directorate.
CONSTRUCTION OF CONCRETE ROAD FROM HOUSE OF JAHAR MOLLA TO HOUSE OF BASANTI HIGHWAY AT KULTI, UNDER KULTI GRAM PANCHAYET, BLOCK-HAROA, NORTH 24 PARGANAS.
Dewatering of water logging from different chainage of K.N.I. Avenue (ch. 5.95 kmp., 6.50 kmp. and 7.00 kmp.) during monsoon under Baguihati Highway Sub Division
Repair and Maintenance of Mangal Bari Rest shed and allied works under Malda Highway Division, in the district of Malda during the year 2025 2026
Bamboo piling along the periphery of the Pond at Sagar Balaka IB at Sagar Island under Diamond Harbour Highway Division during the year 2025-26
Stage Strengthening of the existing carriageway from 115.25 Kmp to 126 kmp_from km 140 to km 148 of NH-60 under Salboni NH Sub Division of NH Division No_II of N.H.C._I during the year 2019-20 in the district of Paschim Medinipur WB
Galigram-Kutruki-Chandipur Road from 1.00 km to 1.50 km, 8.00 kmp to 8.5 km, 9.0 kmp to 10.00 kmp ,11.700 km to 12.00 kmp (in stretches) for patch repairing work of the existing road Under Asansol Highway Division in the district of Paschim Bardham.
Burwan-Belgram Road from 0.00 Kmp to 9.78 Km, Strengthening work under Murshidabad Highway Division No.II in the district of Murshidabad.
Construction of Service Road on both sides of Belghoria Expressway from Km 0.000 to Km.1.750, from Km.2.835 to Km 2.900 Km and from Km. 4.250 to Km. 4.900 of NH 2E under North 24 Pargans District in the State West Bengal
Deployment of Incident Management System with a patrolling team through to operate and maintain for 2 years along the NH-2E (Belghoria Expressway) from Km.0.000 to Km.7.363 excluding from Km.2.900 to 4.250 (BHS) under North 24 Parganas district in WB
Repair and Restoration of existing streetlight and Installation of new streetlight along the NH-2E at Belghoria Expressway from Km 0.000 to Km 7.363 excluding from Km 2.900 to km 4.250 BHS under North 24 Parganas district in the state of West Bengal
Sagardighi -Siteshnagarghat, for Improvement of Riding Quality of Road Surface from 0.00 Kmp to 6.20 Kmp, under Murshidababad Highway Division No. I in the District of Murshidabad in the Raghunathganj Highway Sub-Division during the year 2021-2022.
Emergent repair in patches from 0.00 km. to 2.00 km. of Martin Bern Road under Barasat Highway Division-I in the district of North 24 Parganas
Pagla Approach Road Patch repairing work from 2.00 Kmp to 5.00 Kmp (Bituminous repairing work in stretches under Malda Highway Division, in the district of Malda.