Loading…
Loading…
11,065 results • Best match
Chowhatta Hatia Sainthia Road from 6.00 km to 14.00 km Post Monsoon Repairing work under Sainthia Highway Sub-Division of Birbhum Highway Division-I during the year 2021-2022
Taranagar More Kankada Road from 0.00 Kmp. to 4.70 Kmp. Surfacing Work under Lakshmikantapur Highway Sub Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Kolkata-Basanti Road from 46.30km to 48.30 Km, Emergent restoration in patches under Canning Highway Sub-Division , South 24 Parganas Highway Division in the district of South 24 Parganas.
Manbazar-Indkuri Road from 0.00 Kmp to 0.85 Km, maintenance and Repairing work in stretches under Manbazar Highway Sub-Division of Purulia Highway Division in the District of Purulia.
Repairing of Rejinagar Sarbangapur Road from chainage 0.00 kmp. to 4.00 kmp. (in stretches) under Berhampore Highway Sub-Division of Murshidabad Highway Division No.I. during the year 2024-2025.
Surface repairing in stretches of Manbazar-Bandwan-Kuilapal Road from 8.00 Kmp to 15.00 Kmp under Manbazar Highway Sub-Division of Purulia Highway Division during the year 2019-20.
Manbazar-Bansa Road from 5.70 Km to 10.00 Kmp, maintenance and Repairing work in stretches under Manbazar Highway Sub-Division of Purulia Highway Division in the District of Purulia.
Hiring inspection vehicle under Murshidabad Highway Division No.- I, P.W. (Roads) Directorate for use of Assistant Engineer, Raghunathganj Highway Sub-Division, P.W. (Roads) Directorate, during the year 2022-23
Repair and Maintenance of North-East Side Boundary wall of Kakdwip Stackyard/Kakdwip Highway Sub Division Office Compound under Diamond Harbour Highway Division for the financial year 2024-25.
Makardah Mohiary Road from 0.00 km to 1.40 km -Drain Cleaning and 0.100 km to 0.280 km- Flank Dressing work of Howrah Highway Sub Division under Howrah Highway Division
Shantanu babur more to Giladanga road from 0.00km to 2.17 km protection clearing of flank under Mathabhanga Highway Sub-Division , under Coochbehar Highway Division in the dist of Coochbehar.
Patch repair works in different stretches of Rasulpur-Kutchut Road from 3.00 kmp to 6.00 kmp of under Burdwan Highway Sub Division No-II of Burdwan South Highway Division
Hiring inspection vehicle under Murshidabad Highway Division No.- I, P.W. (Roads) Directorate for use of Assistant Engineer, Islampur Highway Sub-Division, P.W. (Roads) Directorate, during the year 2024-25
Patch repairing work from 0.00km to 1.00km at Nalhati Jagdhari Math Road in stretches under Rampurhat Highway Sub Division of Birbhum Highway Division -I, during the year 2025-26.
Hiring inspection vehicle under Murshidabad Highway Division No.- I, P.W. (Roads) Directorate for use of Assistant Engineer, Islampur Highway Sub-Division, P.W. (Roads) Directorate, during the year 2025-26.
Hiring inspection vehicle under Murshidabad Highway Division No.- I, P.W. (Roads) Directorate for use of Assistant Engineer, Raghunathganj Highway Sub-Division, P.W. (Roads) Directorate, during the year 2025-26.
Hiring inspection vehicle under Murshidabad Highway Division No.- I, P.W. (Roads) Directorate for use of Assistant Engineer, Berhampore Highway Sub-Division, P.W. (Roads) Directorate, during the year 2025-26
Mathurapur Health Centre Road from 0.00 Kmp. to 1.61 Kmp. Surfacing Work under Lakshmikantapur Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Patch repairing work from ch 0.00km to 6.00km in stretches of Rampurhat Tarapith Road under Rampurhat Highway Sub Division of Birbhum Highway Division- I, during the year 2026-27
Emergent Rain Damage Repairing of Potholes and Patch Repairing of Dhamurgachi Kharibari Road from Ch.3.00 Km to 5.45 Km, Ch.6.55 km to 7.65 km and Ch 8.25 Km to 9.00 Km (in stretches) under Uttar Dinajpur Highway Division in the District of Uttar Di
ESTIMATE FOR RENOVATION OF ROAD AT OPPOSITE SIDE OF CPI(M) PARTY OFFICE AT POWER HOUSE PRA FROM THE HIGHWAY TO THE H-O MADHU NANDI WARD NO-12 BOOTH NO 129 WITHIN ISLAMPUR MUNICIPALITY UNDER THE APAS PROGRAMME APAS ID-APS-01-029-129-00005
Adina to Chakli Road VR from 0.000 km to 0.500 km, 0.500 km. to 1.000 km, 1.250 km to 2.000 km, 2.000 km. to 2.500 km and 2.500 km to 2.760 km in stretches Potholes repairing work under Malda Highway Division in the district of Malda.
IE Services for Supervision of Const of 6lane GF Varanasi-Ranchi-Kolkata Highway from junc with NH19 and Varanasi Ring Road near Rewasa vill. to junc with Bhabhua-Adhaura road near Palka vill(from Km0.000 to Km.54.000)under BMP in UP and Bihar on HAM
Cleaning water hyacinth and other floating materials of kaccha drain of Southern side of Belgharia Expressway at ward 1,2,3 Under South DumDum Municipality for 6 months.
Improvement of Khehurtala Road by Bituminous work from the jn. of Kona Expressway to the 1st culvert under ward no-46, HMC L- 200.00m, Av.W- 4.50m.
Silt Cleaning of covered Drain from M.B. Road to Belghoria Expressway via Nadikur Road at ward no. - 22, 27, 28, 31 Under North Dum Dum Municipality.
Structural Cost of safe drive save life structure at Chatterjeehat for construction of six lane elevated kona expressway in the state of West Bengal. (Erection Work)
Preparation of Detailed Project Report with preparation of PPT with Traffic Census, Soil Investigation, Topography Survey with Total Station and Planning, Design, Drawing, Detailed Estimate in accordance with IRC 37-2018 and IRC 9-1972 for Sreepolly
Const of CRB incl Elec Wiring,Plumbing Work,Land Develop,B Wall Equipment Fdtions Construction of Cable Trench Installation of Submersible Pump Erection of Elec Equipment Laying of Earthmat Illumination of Switchyard for 33/11 kV SS Utshodhara
Clearing and Repairing work of CD Structures, Surface drains and Box culverts at Ch. 1.536 Kmp , 2.209 Kmp, 5.332 Kmp and 7.413 Kmp of Keder Roy Road under M.H.S.D. o fB.H.D.-I, in the District of Birbhum, during the year 2025-26.
Harhari More to Bokhara Road via Bhola, Dhalsha from 0.00 Km to 1.20 Km and from 2.20 Km to 9.50 Km and from 10.20 Km to 10.50 Km, Surfacing work under Murshidabad Highway Division No. I in the District of Murshdiabad, Project ID PD252637972S000.
Emergency protective work at 2nd km of Sanakpur Link road under Sainthia Highway Sub - Division of Birbhum Highway Division-I in the District of Birbhum during the year 2026-27
Hiring inspection vehicle under Murshidabad Highway Division No.- I, P.W. (Roads) Directorate for use of Executive Engineer, Murshidabad Highway Division No.- I, P.W. (Roads) Directorate during the year 2022-23.
Kachua-Rajberia Road from 2.00 km to 4.50 km-Emergent repairing work under Habra Highway Sub - Division under Barasat Highway Division No. II in the District of North 24 Parganas
Bagnan - Amta Road, from 0.00 Km to 12.50 Km, Repairing and Surfacing Work in Patches under Amta Highway Sub-Division of Howrah Highway Division in the district of Howrah, PWRD
Surfacing work of Dankuni ROB approaches (Both side) under Serampore Bridge Highway Sub-Division of Hooghly Highway Division No- II, in the district of Hooghly during the year 2025-26.
Sagardighi - Monigram - Gankar - Raghunathganj Road from 20.50 Km. to 24.50 Km. Patch Repair in stretches under Raghunathganj Highway Sub-Division of Murshidabad Highway Division No.I. during the year 2024-2025.
Replacement of Damaged Slab Culvert at 1.50 Kmp. Of Joynagar Jalaberia Kultali Road under Lakshmikantapur Highway Sub Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Repair Renovation Work of the Office Building of the Office of the Assistant Engineer, Lakshmikantapur Highway Sub Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Emergent repairing work of Office toilet at Asansol Highway Office, P.W. (Roads) Directorate, Asansol under Asansol Highway Sub-Division in the district of Paschim Bardwan during the year 2024-2025
Suti-Sujnipara road maintenance Patch repairing bituminous works form 2.00 Kmp to 3.50 Kmp at Raghunathganj Highway Sub-Division under Murshidabad Highway Division No. I, in the district of Murshidabad
Repair and Rehabilitation Work of R.C. Vented Box Bridge at 3.815km of Murarai Mitrapur Road under Rampurhat Highway Sub Division of Birbhum Highway Division- I in the district of Birbhum
Surface repairing in stretches of Damda Chakoltore Daradih Kenda Road from 32.00 Kmp to 46.00 Kmp under Manbazar Highway Sub-Division of Purulia Highway Division during the year 2020-21.
Patch repair of Lalganj Domohani (FR-8) road from 5.30 kmp to 6.00 kmp by providing patching potholes, repairing potholes etc. under Asansol Highway Sub- Division of Asansol Highway Division
Construction , Installation of Traffic Calming measures at vulnerable points on various roads under Habra Highway Sub Division under Barasat Highway Division No II in the district of North 24 Parganas
Repairing of culvert at office approah road of Krishnagar highway Sub-division No.-I Under Nadia Highway Division No.-I in the district of Nadia during the year 2023-24.
Nalhati Bhabanandapur Road 6.00 kmp to 11.00 kmp emerjent potholes repairing and surfacing in stretches under Rampurhat Highway Sub-Division of Birbhum Highway Division-I in the District of Birbhum
Surface repairing in stretches Balance portion of Manbazar Bandwan Kuilapal Road from 11 to 22 Kmp under Manbazar Highway Sub Division of Purulia Highway Division during the year 2020-2021.
Surface repairing in stretches Balance portion of Manbazar Bandwan Kuilapal Road from 0 to 11 Kmp under Manbazar Highway Sub Division of Purulia Highway Division during the year 2020-2021.
Batikar Kurmitha Road (VR) from 0.00 kmp to 3.70 km, emergent repairing work (in stretches) under Bolpur Highway Sub Division of Birbhum Highway Division-II, in the District of Birbhum