Loading…
Loading…
11,109 results • Best match
Name of Work Patch repairing work in stretches from 10.00 kmp to 12.00 km of Sibagram Satpalsa Road under Sainthia Highway Sub - Division of Birbhum Highway Division-I, in the District of Birbhum during the year 2026-27
Urgent Restoration of Road surface and Main Drain connection below VIP Road station South side of K.N.I. Avenue (V.I.P. Road) under Baguihati Highway Sub Division under Barasat Highway Division No. - I in the District of North 24 Parganas
Urgent repairing works of Hatgobindapur-Purbabalisha Road (MDR) from 10.00 kmp to 15.36 km (in patches) under Burdwan Highway Sub Division-I of Burdwan South Highway Division in the district of Purba Bardhaman during the year 2026-2027
Construction of Paver Block Road at Magrahat Bazar at 8.00 Kmp. to 9.00 Kmp. of Dakshin Barasat Magrahat Usthi Road under Diamond Harbour Highway Sub Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Protection against Slipping out of Flank Earth by providing UC Bullah Pilling at Ch. 0.40 Kmp. (LHS) of Jamtala Petkulchand Road under Lakshmikantapur Highway Sub-Division of Diamond Harbour Highway Division, in the District of South 24 Parganas.
Emergent Repair of Pot Holes in stretches by Brick Stitching of Petkulchand to Kishorimohanpur Road from 0.00 Kmp. to 16.00 Kmp. under Lakshmikantapur Highway Sub-Division of Diamond Harbour Highway Division, in the District of South 24 Parganas.
Temporary patch repair of potholes using instant all-weather pothole-repairing compound (supplied by the Department), as and when required, at different roads under Basirhat Highway Sub-Division of Barasat Highway Division No. I, in the district o
Hiring of 1(one)Luxury Car as Inspection Vehicle on daily rate basis for the official use of the Assistant Engineer, Sainthia Highway Sub-Division P.W.(Roads) Dte. Under Birbhum Highway Division- I in the district of Birbhum
Emergent repairing of potholes in different stretches by brick stitching of Joynagar Kulpi Muldia Road from 0.00 Km to 3.2 Km of Lakshmikantapur Highway Sub-Division under Diamond Harbour Highway Division in the district of South 24 Parganas.
Banpur Gede Road from 0.00 km to 3.50 km, Patch repairing work in different stretches under Krishnagar Highway Sub-Division No-II of Nadia Highway Division No-I in the district of Nadia during the year 2026-2027
Emergent Repair of Pot-Holes in stretches by Brick Stitching of Joynagar Jalaberia Kultali Road from 7.40 Kmp. to 19.80 Kmp. under Lakshmikantapur Highway Sub-Division of Diamond Harbour Highway Division, in the District of South 24 Parganas.
Usthi Bridge at 8.1750 km of Hatuganj-Usthi Road, Rehabilitation work Under Diamond Harbour Highway Division
Construction of Drain with culvert from Ramkrishna Vidyapith to main drain of Highway at Sansad V
Construction of Pucca road from Asian Highway towards Rabindrasarani within Atharakhai G.P. under Matigara Panchayat Samity
Repairing and Maintenance Of Road From Kharui More To Highway Via Uttarkona Road Within Illambazar Block
Repair of Road from Basanti Highway to Bairam Primary School Narayanpur G.P under Bhangore I P.S
Renovation work of HIGHWAY PLAZA at Barrackpore Housing Complex Phase-II, Barrackpore, Dist- North 24 pargana.
Link Road to Kalikapur Colony from 0.00 km to 2.20 km Patch Repair under Bolpur Highway
Kulik Bridge over Kulik river at Sohoraii rehabilitation of the bridges under Uttar Dinajpur Highway Division
Repairing of Garage Cum Canteen Building under Midnapore Highway Division in the District of Paschim Medinipur.
Cement Concrete Road at Highway to Adhibasi para area in Ward no 20 Under kalyani Municipality
Repairing of black top road Babughat market to Shirish tola Basanti highway via sokhpukur, Block- Minakhan,
REPAIRING AND RESTORATION OF GARDEN PORTION INTO BOLPUR INSPECTION BUNGALOW PREMISSES UNDER BOLPUR HIGHWAY SUB-DIVISION
Restoration of Bala Bridge approach at Buxa end of Buxa Jayanti Road under Alipurduar Highway Division
Construction of Cross Drain at Ch 4.80 Km of Buxa Jayanti Road under Alipurduar Highway Division
Renovation of Electrical Installation Works for Hooghly Highway Division II, P.W. Roads Directorate at Chinsurah, Hooghly.
Day to day sweeping the compound road pathways... from 5.15 to 6.50 Kmp on both side of KNI Avenue
Day to day sweeping the compound road pathways... from 0.00 to 1.00 Kmp on both side on KNI Avenue
Day to day sweeping the compound road pathways... from 2.00 to 3.15 Kmp on both side on KNI Avenue
Day to day sweeping the compound road pathways... from 1.00 to 2.00 Kmp on both side on KNI Avenue
Day to day sweeping the compound road pathways... from 3.15 to 5.15 Kmp on Kolkata Flank on KNI Avenue
Preparation of Detailed Project Report (DPR) for the work of Strengthening of i) Burnpur Samdhi road from 03.00kmp to 9.00 kmp ii) Lalganj Gourandi Runakuraghat Road from 0.00 kmp to 10.37kmp iii) Domohini Gourandi Runakuraghat Road from 10.50 kmp
Day to day sweeping the compound road pathways... from 2.95 to 5.15 Kmp on VIP Flyover on KNI Avenue
Day to day sweeping the compound road pathways... from 3.15 to 5.15 Kmp on both side on KNI Avenue
Day to day sweeping the compound road pathways... from 6.50 to 8.05 Kmp on both side on KNI Avenue
Carrying out Road Safety Audit of existing roads of State Highways of SH1A, SH3, SH3A, SH7, SH11A, SH13 and SH15 in Package 2 in the State of West Bengal, 3rd Call
Muragacha Kalyani Road from Ch 4.85 km to Ch 6.85 km Potholes repairing work in patches under Kalyani Highway Sub-Division of Nadia Highway Division No.II PW Roads Dte in the district of Nadia during the year 26 27
Maintenance and repairing work from 6.00 Km to 19.00 Km in stretches of Monteswar-Dainhat Road (SH-15) under Katwa Highway Sub-Division of Burdwan North Highway Division in the district of Purba Bardhaman during the year 2026-27.
Advance collection of Jhama metal and moorum at Ramjibanpur Stack yard and Ketugram Stack yard for maintenance of different roads under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the ye
Budpur-Pairachali Road from 0.00 Kmp to 7.00 Kmp, Maintenance and Repair work in stretches (by providing potholes, Seal Coat Type-B etc.) under Manbazar Highway Sub-Division of Purulia Highway Division in the District of Purulia(2nd Call).
Emergent restoration of left side approach road of Churni bridge at 9.150 kmp towards Shibnibash more of Shibnibash- Bajitpur road due to sudden slip-circle failour of embankment under Krishnagar Highway Sub-Division. No-II of Nadia Highway Division.
Krishnaganj Gobindapur road from 5.00 kmp to 8.50 kmp. Emergent patch repairing work in different stretches under Krishnagar Highway Sub-Divn. No-II of Nadia Highway Division No.-I in the District of Nadia during the year 2024-2025.
Emergent restoration of road flank at various stretches along Dhola to Milon More Road for damage caused by the recent cyclonic storm AMPHAN under Kakdwip Highway Sub-Division of Diamond Harbour Highway Division P.W. Roads Directorate in the dis
Patch repairing and maintenance work at 1st, 3rd, 4th, 6th and 7th of Kumarpur-Chakta Road of Ramjibanpur Highway Sub-Division under Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2025-26. (2nd Call)
Replacement of existing broken H.P Culvert on emergency basis by constructing new 1.5m x Box Culvert at 2.50 km on Pandua Kamtai Simlagarh Road of Bansberia Highway Sub-Division No.-II Hooghly Highway Division No- II, P.W. (Roads) Directorate
Installation of Signage Boards on Different Bridges and Roads under Burdwan Highway Sub Division No-II of Burdwan South Highway Division, P.W.(Roads) Dte. in the district of Purba Bardhaman during the year 2023-24. (Non Plan) (1st Call)
Patch repairing work at different chainage using Brick Stitching and Brick Flat Soling of Chakdaha Bongaon Road at Ch 32.20Km, 32.15Km, 32.05Km, Ch 32.00Km of Kalyani Highway Sub-Division under Nadia Highway Division No.II during the year 2025-26
Emergent Repairing work at Link road from Chandannagar Nasibpur Road to Bhadreswar station road from 1.4km to 5.414km of Chandannagar Highway Sub Division under Hooghly Highway Division No II in the District of Hooghly in the year 2023 2024.
Damda-Chakoltore-Daradi-Kenda-Manbazar Road Surface repairing work in stretches from 40 to 46 Kmp, Dressing and Chilchalling work from 32 to 46 Kmp under Manbazar Highway Sub-Division of Purulia Highway Division in the District of Purulia.
Construction of Rumble Marking using Two Component Cold Plastic along Bagnan-Srikol-Kamalpur Road and Bagnan-Mankur Road under Uluberia Highway Sub-Division of Howrah Highway Division, PWRD in the district of Howrah. (Under Head NON PLAN) 2nd Call