Loading…
Loading…
11,109 results • Best match
Repair and maintenance of pathway and approach road and clearing compound work at rest room, sub-division office building and stackyard premises under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman
Supply of stone materials (Pakur Variety) at Pandua, Repairing potholes by precoated stone materials , at different Road of Section-I , Section-II of Bansberia Highway Sub-Division-II under Hooghly Highway Division- II, in the District of Hooghly
Patch repairing work from chainage 0.00km to 1.50km and 2.50km to 3.80km in stretches at Akalipur Bhadrapur Road under Rampurhat Highway Sub Division of Birbhum Highway Division-I in the district of Birbhum, during the year 2025-26.
Emergent repairng of potholes by precoated chips at different roads within the jurisdection of Sadarghat Highway Sub-Division No.-II under Asansol Highway Division, P.W.(Roads) Directorate in the District of Paschim Bardhaman, during the year 24-25
Urgent Restoration of damages made by PHE Department during their pipe laying work from Jangalpara-Gangadharpur Road Shouldering from 0.0 km to 2.40 km (Both side) of Serampore Bridge Highway Sub-Division under Hooghly Highway Division no.- II
Beldanga Amtala Patikabari Road from 34.80 to 37.80 Km. Emergent Patch Repairing work with potholes repair 20 mm. P.C. and S.C. in stretches under Plassey Highway Sub Division of Nadia Highway Division No.I in the District of Nadia
Emergent Potholes Repairing work with some allied work from 3.6 Kmp to 5.3 Km except PHE damaged restored portion of Link Road from Chandannagar Nasibpur Road to Bhadreswar Station Road of Chandannagar Highway Sub-Division under Hooghly Highway
Bhatar-Bonpas Road from 4.00 km to 7.00 km, Mtc. and Repair works in stretches under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2023-24.
Road safety measures by constructing Table Top along with necessary road furniture at various stretches from chainage 0.00 km to 33.88 km of STKK Road under Bansberia Highway Sub-Division- I and II of Hooghly Highway Division II
Pre coating stone aggregates at Barasat stackyard and repairing potholes in different stretches of various roads within the jurisdiction of Barasat Highway Sub Divn under Barasat Highway Division II in the district of 24 parganas North during the
Repairing and Renovation Works for Compound Road inside the Office campass of the Assistant Engineer, Buniadpur Highway Sub-Division, P.W(Roads) Dte. under Dakshin Dinajpur Highway Division in the district of Dakshin Dinajpur during the year of 2023
Protective work for the existing Pond inside the Office campass of the Assistant Engineer, Buniadpur Highway Sub-Division, P.W (Roads) Dte. under Dakshin Dinajpur Highway Division in the district of Dakshin Dinajpur during the year of 2023-24.
Surfacing work of Nabadwip Municipal Link Road from 2.00 Km. to 2.70 Km. under Krishnagar Highway Sub-Division No. I of Nadia Highway Division No. I in the District of Nadia during the year 2022 2023 (2nd Call)
Emergent reconstruction of narrow 4.5 mtr span slab culvert at 10 kmp of Bagnan Sricol Kamalpur Road under Uluberia Highway Sub-Division of Howrah Highway Division in the district of Howrah , PWRD (Under Head 13th F.C.) 2nd Call.
Rajgram Mohanpur Road from Ch 0.60 km to 1.50 km and from Ch 2.70 km to 6.00 km Patch Repairing Works in stretches under Rampurhat Highway Sub-Division of Birbhum Highway Division-I during the year 2023-24
Anandanagar Health center Road from 0.00km to 2.66km (in stretches) under Hooghly Highway Division No-II, Urgent Restoration of Shoulder damages made by PHE Department during their pipe laying under Hooghly Highway Division No-II in the District
Krishnaganj Gobindapur road from 0.00 kmp to 2.50 kmp. patch repairing work in different stretches under Krishnagar Highway Sub-Divn. No-II of Nadia Highway Division No.-I in the District of Nadia during the year 2024-2025.
Badkulla Kulgachi road from 0.00 Kmp to 2.00 Kmp, patch repairing work under Krishnagar Highway Sub-Division No-II of Nadia Highway Division No.-I, P.W(Roads)Dte. in the district of Nadia during the year 2024-2025
Maintenance and repair works of Karajgram Bankapasi Road (MDR) from 10.00 kmp to 11.50 kmp in stretches under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2022-23.
Urgent Restoration of damages made by PHE Department during their pipe laying work from Singur Ugly Road Shouldering from 8.36 km to 9.66 km Both side of Serampore Bridge Highway Sub-Division under Hooghly Highway Division no.- II
Sreerampur More to Nabadwip Hospital Road with link to Bablari village Road from 0.00 Kmp. to 5.50 Kmp. Emergent patch repairing work in different stretches under Krishnagar Highway Sub Division No. I of Nadia Highway Division No. I
Embankment Protection work on upstream side abutment of R.C Box Bridge at 5.50 km in Rampurhat Tarapith Road under Rampurhat Highway Sub-Division of Birbhum Highway Division-I in the District of Birbhum during the year 2025-26
Bodra-Champahati Road from 0.00 kmp to 15.00 km in different stretches, Permanent restoration work, damaged due to CITY GAS DISTRIBUTION PROJECT IN WEST BENGAL CLUSTER within Baruipur Highway Sub-Division under South 24 Parganas Highway Division in
Paikpara Joyghata road from 0.00 kmp to 2.80 kmp. Patch repairing work in different stretches under Krishnagar Highway Sub-Divn. No-II of Nadia Highway Division No.-I in the District of Nadia during the year 2023-2024
Rehabilitation work of 2cell Minor Bridge at 7th km of Burnpur Samdi road (FR-19) under Asansol Highway Sub-Division of Asansol Highway Division, P.W.(Roads) Directorate in the District of Paschim Bardhaman, during the year 2024-25.
Nanoor -Basapara Road (MDR) Emergent Repairing works from 10.00kmp to 15.00 kmp in patches under Kirnahar Highway Sub-Division of Birbhum Highway Division-II P.W.(Roads) Directroate. In the District of Birbhum During the year of 2023-24.
Construction of temporary diversion road by providing 3 row hume pipe culvert 1200 mm dia at 11.20 km of Rangamati Asuria Dejuri Road under Bankura East highway Sub Division of Bankura Highway Division in the district of Bankura
Bakhrahat High School to Baba Barakachhari Mandir Road, Permanent damage restoration against laying of underground clear water pipe line (by open cut method) of PHE under Alipore Highway Sub-Division within South 24-Parganas Highway Division, P.W (Ro
Krishnaganj Gobindapur road from 6.70 kmp to 9.35 kmp. patch repairing work in different stretches under Krishnagar Highway Sub-Divn. No-II of Nadia Highway Division No.-I in the District of Nadia during the year 2025-2026
Hijuli Matiyari Road from 2.00 Kmp. to 5.00 Kmp. Emergent patch Repairing work in different stretches with potholes including 20 mm P.C. and S.C. under Plassey Highway Sub Division of Nadia Highway Division No. I, P.W. (Roads) Directorate
Construction of temporary bus stand , at Hardwood point including subsequent restoration of land under Kakdwip Highway Sub-Division of Diamond Harbour Highway Division in the district of South 24 Parganas for ensuing Ganga Sagar Mela 2025 (Spot - 3)
Repairing and maintenance work of Kumarpur-Chakta Road by Jhama metal for the stretches of 9.00 to 10.00kmp. under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2020_21
Mahinagar-Debpur road emergent repair by W.B.M, potholes, Premixcarpet etc. in stretches from 1.00 kmp to 3.00 kmp under Sadarghat Highway Sub-Division No.-II of Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman
Mirjapur-Kaligram-Kusumgram-Nadanghat-Samudragarh Road Repair- Maintenance works from 32.00 kmp to 34.00.00 kmp , 36.00 kmp to 38.00 kmp and 46.00 kmp to 50.00 kmp in patches under Nabadwip Highway Sub Division of Burdwan South Highway Division
Bhedia Chora road repairing in stretches in between 12.00 km to 16.80 km under Sadarghat Highway Sub-Division No.-II of Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman during the year 2022-23.
Feeder road from STKK to Surajpur via Behula R.S. from 0.50 kmp to 2.50kmp patch repairing work of Bansberia Highway Sub-Division I under Hooghly Highway Division-II, In the District of Hooghly during the year 2023-2024
Auction Sale for disposal of 300 (three hundred) nos. different size and categories logs of trees kept at Krishnaganj Stackyard under Krishnagar Highway Sub Division No. II of Nadia Highway Division No. I, P.W. (Roads) Dte. (3rd call)
Reconstruction of Boundary Wall at west side of office campus and construction of drain beside office building at Ramjibanpur Highway Sub Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2024-25.
Replacement of Damaged Approach Slab, Wing Wall and Return Wall of Kholakhali Bridge at 12.50 Kmp. Of Joynagar Jalaberia Kultali Road under Lakshmikantapur Highway Sub Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Banpur Gede road from 3.00 kmp to 6.00 km. Patch repairing work in different stretches under Krishnagar Highway Sub-Divn. No-II of Nadia Highway Division No.-I in the District of Nadia during the year 2025-2026
G.T. road S.H-13 from 597.335 km to 611.60 km Surface repairing work in stretches under Chandannagar Highway Sub Division of Hooghly highway division no II P.W roads in the dist. of Hooghly during the year 2025 26
Dhulian Farakka Road for maintance and patch repairing works from Ch 0.00 kmp to 0.500 kmp and 4.00 kmp to 5.500 kmp under Raghunathganj Highway Sub-division under Murshidabad Highway Division No-I. In the dist of Murshidabad
Repair and rehabilitation of bridges at ch. 108.188 Km of Ramjibanpur-Palita-Palitpur-Natunhat Road (SH-7) under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the district of Purba Bardhaman during the year 2025-2026.
Advance collection of Jhama Metal and Moorum at Katwa Stackyard for maintenance of different roads under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2023-24. (2nd Call)
Aherbalma Pahalanpur Road (MDR) - Patch Repair works from 8.00 kmp to 12.00 kmp in stretches-under Sadarghat Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte. in the district of Purba Bardhaman (2nd call)
Maintenance and Patch repairing of Nasigram-Monteswar Road from ch. 0.00 Kmp to 8.00 Kmp of Bhatar Highway Sub-Division No.-II under Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2025-26.
Bhaduriapara-Dhanirampore Road from 1.00 Km to 10.00 Km, Patch Repair ( Bituminous Potholes, Surfacing by 20 mm P.C. and seal coat in stretches) under Islampur Highway Sub-Division of Murshidabad Highway Division No.I in the district of Murshidabad
Repairing and Maintenance of Ramkrishnapur Health Centre Road to Diamond Harbour Road from 0.00 Kmp. to 3.40 Kmp. in stretches under Diamond Harbour Highway Sub Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Bajitpur Shibnibas Road from 4.500 kmp. to 9.300 Kmp. Emergent patch repairing work in different stretches under Krishnagar Highway Sub Division No.II of Nadia Highway Division No. I in the District of Nadia during the year 2021 2022
Repair and Renovation work of Palashipara Inspection Bunglow considering roof tiles PCC and sanitary plumbing work in balance portion under Plassey Highway Sub - Division of Nadia Highway Division No-I, in the District of Nadia during the year