Loading…
Loading…
11,109 results • Best match
Seharabazar Netrakhanda Road (VR) Urgent Repairing of Six Nos Culverts at 0.90 km,1.60 km, 2.70 km, 3.15 km, 4.12 km, 4.81 km of Sadarghat Highway Sub Division No-I under Burdwan South Highway Division, P.W. (Roads) Directt
Link road connecting NH34 to Dhulian Pakur road 0.0 Kmp to 2.20 Kmp, Patch Repair (Bituminous Potholes, W.B.M. covered by 20 mm P.C. and seal coat in stretches) under Raghunathganj Highway Sub-Division of Murshidabad Highway Division No.I
Maintenance and Patch Repair work at 2nd, 4th, 6th, and 8th Km of Kumarpur-Chakta Road under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2022_23. (2nd Call)
Dinobandhu College to Andul Road Onkermal Jetia Road from 0.100 kmp to 0.160 km, Restoration of damage road portion by Concrete Interlocking Paver Block of Howrah Highway Sub-Division under Howrah Highway Division in the Dist. of Howrah
Hiring of 1(one) Luxury Car as Inspection Vehicle on daily rate basis for the official use of the Assistant Engineer, Rampurhat Highway Sub-Division, P.W.(Roads) Dte. Under Birbhum Highway Division-I in the district of Birbhum
Mirjapur Kaligram Kusumgram Nadanghat Samudragarh Road from 34.00 to 36.00 kmp, from 43.00 to 46.00 kmp, from 50.00 to 52.00 kmp Emergent patch repairing and surfacing in stretches under Nabadwip Highway Sub Division of Burdwan South Highway Divisio
Sukanta Setu(R.O.B) with Approaches - Replacement of damaged surface course and other allied works of Repair and Maintenance in footpath ,railing Etc under Alipore Highway Sub Division under South 24 Parganas Highway Division in the District of Sout
Repairing and Rehabilitation of existing 1.00m span slab culvert (Replacement of old, damged and broken deck slab ) and other allied works at ch. 6.350km. of Karajgram Bonkapasi Road (MDR) under Katwa Highway Sub-Division of Burdwan North Highway
Emergent patch repairing work to Krishnagar to Nabadwip Dham road from 0.00 to 6.00 kmp under Krishnagar Highway Sub-Division No.-I under Nadia Highway Division No.- I in the District of Nadia during the year 2025-26
Repairing of Sarai Link Road from 0.0 km to 0.507 km in streches by Concrete paver blocks under Bansberia Highway Sub Division- II of Hooghly Highway Division-II in the District of Hooghly during the year 2025 2026
Banpur Gede road from 0.00 kmp to 6.00 km. Patch repairing work in different stretches under Krishnagar Highway Sub-Divn. No-II of Nadia Highway Division No.-I in the District of Nadia during the year 2024-2025.
Construction of Double Barrel Hume Pipe Culvert at 9th Km of Joypur-Khalna-Mukundadighi Road with a Link to Old Khalna Bus Stand under Amta Highway Sub-Division of Howrah Highway Division in the district of Howrah,PWRD
Patch repairing work from chainage 0.00km to 1.50km and 2.00km to 3.00km in stretches at Akalipur Bhadrapur Road under Rampurhat Highway Sub Division of Birbhum Highway Division- I in the district of Birbhum, during the year 2024-25
Emergent Restoration of Joynagar Jalaberia Kultali Road from 4.00 Kmp. to 7.40 Kmp. for the damages caused by recent Cyclone Bulbul under Lakshmikantapur Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Margram Sarda Road from 0.00km to 14.20km dressing and chilchalling with cutting kutcha drain of road flanks work under Rampurhat Highway Sub Division of Birbhum Highway Division-I in the district of Birbhum during the year 2024-25
Repair of the different Road by Departmental Jhama Metal, Brick Bats, Pacthing potholes by stone metal , Ballah driving and Filling Empty Cement bag and placing properly at different Road under Bansberia Highway Sub-Division No.II of Hooghly Highway
Patch Repairing work in stretches from 0.0 Kmp to 1.65 Km of Link Road from Chandannagar Nasibpur Road to Bhadreswar Station Road of Chandannagar Highway Sub-Division under Hooghly Highway Division No II in the district of Hooghly
Beldanga Amtala Patikabari Road from 35.10 Km. to 37.10 Kmp. Emergent patch repairing work in different stretches under Plassey Highway Sub Division of Nadia Highway Division No. I in the District of Nadia during the year 2022 2023
Maintenance and repair works of Karajgram Bankapasi Road (MDR) from 1.00 kmp to 3.00 kmp in stretches under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2021-22.
Debagram Tehattaghat Road from 0.00Kmp to 8.00Kmp emergent restoration and repairing work in different stretches with potholes repair under Plassey Highway Sub Division of Nadia Highway Division No-I, P.W (Roads) Dte in the District of Nadia during
NH 34 (Mira) to Kaliganj Health Centre Road from 0.00 Kmp. to 4.00 Kmp., Patch repair work of Plassey Highway Sub Division under Nadia Highway Division No. I in the District of Nadia during the year 2022 2023.
Construction of Concrete Paver Block Pavement from 45.905 Km to 45.980 Km of Damda-Chakoltore-Daradi-Kenda-Manbazar Road under Manbazar Highway Sub-Division of Purulia Highway Division in the District of Purulia during the year 2021-22.
Dhalapl-Natabari road from 3.00 km to 4.00 km and 5.00 km to 7.00 km, patch repairing work (in stretches) under Cooch Behar Highway Sub-Division No. III of Cooch Behar Highway Division during the year 2021-2022.
Repairing and Mtc. work in stretches of Balgona Chandrapur Road from 0.50 km to 14.50 km under Bhatar Highway Sub-Division-II of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2023-24.
Jahannagar More to Nabadwip Hospital Road from 0.50 km to 2.00 km Emergent patch repairing work with repairing potholes and premix carpeting under Nabadwip Highway Sub Division of Burdwan South Highway Division in the district of Purba Bardhaman
Repairing of potholes and distress of NH34 to Nimtita Station Road Extended to suti P.S Road from Ch 0.1 Kmp to 2.0 Kmp Ch 3.00KM to 5.0KM under Raghunathganj Highway Sub-division under Murshidabad Highway Division No-I
Guma Gurda Road and Lokenath Asram to Link Road from 3.00 km to 6.70 km Emergent Patch Repairing in Stretches under Habra Highway Sub - Division under Barasat Highway Sub - Division - II in the District of North 24 Parganas
Maintenance and repair works of Mateary Dewanganj Road (MDR) from 0.50 km to 1.60 km in stretches under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2023-24.
Basanti Highway (SH-3A) from Minakhan 132/33 KV Sub-Station (Ch.34.70km) to Malancha Bridge (Ch.40.90km) restoration of damaged by laying of 33KV UG Cable line by Basirhat Division, WBSEDCL under South 24 Parganas Highway Division.
Temporary restoration in patches due to excessive rainfall at Ghoshpara Jagulia Road from Ch 17Km to 17_20Km by brick stitching except KMDA restoration zone of Kalyani Highway SubDivision under Nadia Highway Division NoII during the year 2025 26
Patch Repairing and maintenance work at 1st, 3rd and 5th Km of Kumarpur-Chakta Road under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2024-25. (2nd Call)
Temporary side slope protection work by Eucalyptus Bullah of the embankment of Pachundi Uddaharanpur road at 11th kmp of Ramjibanpur Highway Sub Division under Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2020_21
Chandannagar Link road from 0.00 kmp to 1.00 kmp. Patch repairing work in different stretches under Krishnagar Highway Sub-Divn. No-II of Nadia Highway Division No.-I in the District of Nadia during the year 2025-2026
Refurbishment of drain and cross drains and replacement of R.C.C Cover slab for drain on Boralia road under Habra Highway Sub-Division under Barasat Highway Division No.- II, P.W.(Roads) Dte. in the District of North 24 Parganas
Ayeshbag-Harirampur road from 13.00 kmp to 17.20 kmp, Patch Repair (Bituminous Potholes, W.B.M. covered by 20mm P.C. and seal coat in stretches) under Berhampur Highway Sub-Division of Murshidabad Highway Division No.I in the district of Murshidabad
Dressing Chilchalling and allied works of embankment slope protection in different stretches in between 0.00km to 6.00km of Ayroni-Chitolia road under Cooch Behar Highway Sub-Division no.III of Cooch Behar Highway Division in the district of Cooc
Feeder Road to Noapara Seed Factory from 0.00 km to 0.600 km Emergent Patch Repairing in stretches including Embankment Protection Work under Habra Highway Sub-Division of Barasat Highway Division no.II in the district of North 24 Parganas
Debagram Katwaghat Road from 2.00Kmp to 5.00Kmp and 6.00Kmp to 9.00Kmp and 13.00Kmp to 16.00Kmp Emergent Restoration and Repairing work in different stretches with potholes repair under Plassey Highway Sub Division of Nadia Highway Division No. I P
Repair, Maintenance and Renovation works for office building of the Assistant Engineer, Buniadpur Highway Sub-Division, P.W(Roads) Dte, under Dakshin Dinajpur Highway Division in the District of Dakshin Dinajpur, during the year of 2022-23.(3rd Call)
Repairing work in stretches of Balgona -Chandrapur road from 0.100 km to 0.50 km under Bhatar Highway Sub-Division No-II of Burdwan North Highway Division in the dist. of Purba Bardhaman during the year of 2023-24.
Emergent repairing of BOINCHEE BHASTARA MAJINAN BELMURI ROAD from 12.500 km. to 15.000 km., 16.700 KM. to 19.500 km in patches at different stretches at damage portion under Hooghly Highway Sub Division of Hooghly Highway Division No. I
Emergent repairing of Berhampore - Hariharpara - Amtala Road from chainage 1.00 Kmp. to 10.00 Kmp. and 12.00 Kmp. to 15.00 in stretches under Berhampore Highway Sub-Division of Murshidabad Highway Division No.I. in the district of MSD (2nd call)
Debogram Tehattaghat Road from 5.00 Kmp. to 10.00 Kmp. Emergent patch Repairing work in different stretches with potholes including 20 mm P.C. and S.C. under Plassey Highway Sub Division of Nadia Highway Division No. I, P.W. (Roads) Directorate
Banpur Gede road from 6.00 kmp to 7.80 km. Patch repairing work in different stretches under Krishnagar Highway Sub-Divn. No-II of Nadia Highway Division No.-I in the District of Nadia during the year 2025-2026
Mundamari Pingla Paramanandapur Moyna road from 20.00 km to 22.00 km - patch repair work of damaged blacktop portions by repairing Potholes, 20 mm PC Seal Coat (Type - B) under Panskura Highway Sub Division of Tamluk Highway Division in
Maintenance and Bituminous patch repairing of Bhatar Nasigram Road from 8.00 kmp to 11.30 km under Bhatar Highway Sub-Division No. II of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2021-22.
Emergent patch repairing work to Krishnagar to Nabadwip Dham road from 0.00 to 13.00 kmp under Krishnagar Highway Sub-Division No.-I under Nadia Highway Division No.- I in the District of Nadia during the year 2025-26.
Patch repair work with potholes in stretches of Katwa Karui Road from 4.00 km to 6.00 km under Katwa Highway Sub-Division of Burdwan North Highway Division in the district of Purba Bardhaman during the year 2023-24.
Ahmedpur-Kirnahar- Ramjibanpur Road(SH) emergent repairing potholes and depressions from 24.00 Kmp to 29.00 Kmp in patches under Kirnahar Highway Sub-Division of Birbhum Highway Division-II, P.W. (Roads) Dte. in the District of Birbhum.(2nd call)
Patch repairing work from chainage 0.00km to 3.90km and 5.40km to 8.20km in stretches with dressing and chilchalling work at Tejhati Kurumgram Road under Rampurhat Highway Sub Division of Birbhum Highway Division -I during the year 2025-26