Loading…
Loading…
11,108 results • Best match
Emergent patch repair Burnpur-Samdi Road (FR-19) from 3.5 kmp. to 6.0 kmp. under Asansol Highway Sub-Division of Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman during the year 2021-22
Purbasthali Chupi road from 4.00 kmp to 6.00 kmp Emergent patch repairing , surfacing in stretches under Nabadwip Highway Sub-Division of Burdwan South Highway Division, P.W. (Roads) Directt. In the Dist. of Purba Bardhaman during the yea
Reparing work by stitching picked jhama bricks of kotasur Ramnagar Road from 16.86 km to 16.95 km under Sainthia Highway Sub- Division of Birbhum Highway Division-I in the district of Birbhum during the year 2025-26.
Boring and sinking of submerssible pump for water supply to the Bolpur Inspection Bungalow and the office of Bolpur Highway sub-Division under Birbhum Highway Division-II in the district of Birbhum during 2024-2025.(3rd call)
Thermoplastic paint on existing Hump or Speed Breaker under the jurisdiction of all roads under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2025-26.
Debagram Kaliganj Road from 3.00 Kmp. to 6.00 Kmp. Emergent patch repairing work in different stretches under Plassey Highway Sub Division of Nadia Highway Division No. I in the District of Nadia during the year 2022 2023
Construction of New Cross Drain in liue of Old damaged cross drain at chainage 5.01 km of Sankrail - Manikpur - Hirapur Bazar Road under Howrah Highway Sub-Division of Howrah Highway Division in the district of Howrah, PWRD
Repairing of Chorida Birgram Tunturi Road from 0.23 Kmp to 1.50 Kmp and 4.00 Kmp to 6.00 Kmp by 20mm P.S, Seal coat under Balarampur Highway Sub-Division of Purulia Highway Division during the year 2019-20.
Surface repairing in stretches (balance portion) of Damda-Chakoltore-Daradi-Kenda-Manbazar Road from 36 to 46 Kmp under Manbazar Highway Sub-Division of Purulia Highway Division in the District of Purulia during the year 2021-22.
Tehatta shyamnaghar road from 0.00Kmp to 4.00Kmp emergent restoration and repairing work in different stretches with potholes repairing under Plassey Highway Sub Division of Nadia Highway Division No-I, P.W (Roads) Dte. during the year 2025-2026
Temporary restoration in stretches of Road No.-9 of Panagarh Industrial Park at Panagarh under Durgapur Highway Sub-Division of Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman during the year 2022-23
Repairing cum Rehabilitation of the Structure of R.C.C. Minor Bridge at 10.9th Km of Uluberia Shayampur Road Under Uluberia Highway Sub-Division of Howrah Highway Division , During The Year 2016-17 In the District of Howrah, PWRD
Replacement and rectification work of Roller and Rocker Bearing of Sadarghat Bridge over Kangshabati River under Panskura Highway Sub - Division of Tamluk Highway Division in the district of Purba Medinipur during 2020 - 2021. Ch. To Non Plan
Urgent temporary Restoration work (Patching potholes by Jhama metal) and improvement of road flanks from 0.00kmp. to 7.00kmp. of Koichar Nandigram Singhi road (MDR) in patches under Katwa Highway Sub-Division of Burdwan North Highway Division in
Shankarpur - Nibujibazar road from Ch. 15.42 km to 15.92 km Reparing potholes by picked jhama bricks under Kalna Highway Sub Division of Burdwan South Highway Division, in the Dist of Purba Bardhaman during the year 2022-23
Debogram Tehattaghat Road from 13.00 kmp to 17.00 kmp Emergent restoration and repairing works in different stretches with potholes repair including 20 mm. P.C. and S.C. under Plassey Highway Sub Division of Nadia Highway Division No.-I
Repairing work in patches from 24.50 km to 26.20 km (in stretches) of Monteswar Dainhat Road under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2023-24.
Maintenance and repairing work from 6.00 Km to 19.00 Km in stretches of Monteswar-Dainhat Road under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2025-26.
Repairing works of Box Culvert at ch. 19.75 km and 22.256 km of Mollarpur Majhipara Bolpur Road under Mollarpur Highway Sub-Division of Birbhum Highway Division-I in the District of Birbhum during the year 2024-25.
Patch Repair Work of Kulgachi Barnia Road from 6.00 Kmp. to 10.00 Kmp. under Plassey Highway Sub Division of Nadia Highway Division No.I in the District of Nadia during the year 2021 2022. (Ch. to Non Plan)
Ramjibanpur-Ketugram-Katwa Road (SH-6) from 94.00 kmp to 96.00 kmp, repairing work in stretches under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2023-24.
Emergent work for repairing of Mogra Polba from 2.00 km to 4.30 km and 5.00 km to 6.50 km under Hooghly Highway Sub-Division under Hooghly Highway Division No. I in the District of Hooghly (2nd Call).
Katlamari Health Centre Road from 0.00 kmp to 2.20 kmp emergent Maintenance and patch repair with stone WBM and Bituminous course under Islampur Highway Sub-Division of Murshidabad Highway Division No. I in the District of Murshidabad.
Mohisgote-Chattabazar Road from 0.00 km to 0.80 km, Surfacing work by Bituminous Concrete along with flank protection work under Alipore Highway Sub-Division of South 24 Parganas Highway Division in the District of South 24 Parganas.
Advance collection of Stone Materials and premixing the same with bitumen for repairing of rain induced bituminous potholes as and when necessary basis on different roads under Arambagh Highway Sub Division of Hooghly Highway Division No. I
Repairing and Maintenance work of Jangalpara Gangadharpur Road from 1.00kmp to 4.14 kmp(In Stretches) by Repairing Potholes, 20mm P.C, S.C, and flank protection work etc. of Serampore Bridge Highway Sub Division under Hooghly Highway Division-II
Advance collection of Stone Materials and premixing the same with bitumen for repairing of rain induced bituminous potholes as and when necessary basis on different roads under Serampore Highway Sub Division of Hooghly Highway Division No. I
Mirzapur-Kaligram-Kusumgram-Nadanghat-Samudragarh Road (MKKNS)(SH-8), Pre monsoon Patch Repairing Works from 26.00 kmp to 30.00 kmp in patches under Burdwan Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Dte.
Balance estimate for surface repairing in stretches of Manbazar-Bandwan-Kuilapal Road from 11.00 Kmp to 22.00 Kmp under Manbazar Highway Sub-Division of Purulia Highway Division in the District of Purulia during the year 2021-22.
Balance estimate for surface repairing in stretches of Manbazar-Bandwan-Kuilapal Road from 0.00 Kmp to 11.00 Kmp under Manbazar Highway Sub-Division of Purulia Highway Division in the District of Purulia during the year 2021-22.
Patch Repairing of Blacktop Surface in stretches of Lakshmikantapur Mandir Bazar Chakdah Road from 0.00 Kmp. to 17.17 Kmp. under Diamond Harbour Highway Sub-Division of Diamond Harbour Highway Division, in the District of South 24 Parganas.
Emergent potholes and patch repair work at Sonapur - Pundibari road from Ch. 5.5 kmp to 10.8 kmp under CoochBehar Highway Sub Division - III under Cooch Behar Highway Division, P.W (Roads) Directorate in the district of Cooch Behar
Mtc. and repair (in stretches) to Ramjibanpur- Palita- Palitpur- Natunhat road from 115.00kmp to 116.00kmp and 120.00kmp to 122.00kmp under Bhatar Highway Sub-Division No. I of Burdwan North Highway Division in the district of Purba Bardhaman
Repairing of link road / Approach road of Staff Quarter (Group-D) at Dhopghati of length 170m under Berhampore Highway Sub-Division of Murshidabad Highway Division No-I in the district of Murshidabad during the year 2023-24.
Advance collection of Jhama metal and moorum at Katwa Stack yard for maintenance of different roads under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2020_21_2ND CALL
Patch repairing wok in stretches from change 24.50 Kmp to 26.00 Kmp of Mollarpur-Majhipara- Bolpur Road under Mollarpur Highway Sub-Division of Birbhum Highway Division-I in the District of Birbhum, during the year 2025-2026.
Rampurhat Tarapith Road from 0.00km to 5.00km with link to Tarapith Atla Road from 0.00km to 2.617km patch repairing work in stretches under Rampurhat Highway Sub Division of Birbhum Highway Division-I during the year 2023-24
Road Safety Measures with Speed Breakers from Ch. 2.50 Km to Ch. 6.00 Km of Uluberia Shyampur Road under Uluberia Highway Sub Division of Howrah Highway Division in the district of Howrah during the year 2025 -26
Traffic claiming measures by construction of circular Hump on different link roads including painting of Ahmedpur Kirnahar Ramjibanpur Road (SH-6) from 15.00 KM to 29.00 KM under Kirnahar Highway SubDivision of Birbhum Highway Division -II ,P.W.RD
Murutia Primary school to Pipulberia via Shekpara Road from 3.00 Kmp. to 6.00 Kmp. Emergent patch repairing work in different stretches under Plassey Highway Sub Division of Nadia Highway Division No. I in the District of Nadia
Plassey Betai Road from 0.00 Kmp to 1.00Kmp repairing work in different stretches with potholes repair under Plassey Highway Sub Division Under Nadia Highway Division No.-I in the district of Nadia during the year 2025-26
Moyda-Khakurdah-Beliachandi Road from 0.00 kmp to 8.00 kmp, Temporary restoration work in patches in stretches under Baruipur Highway Sub-Division under South 24 Parganas Highway Division in the district of South 24 Parganas.(Sl-02)
Tilpara- Massanjor Road from 0.00 Kmp to 3.00 Kmp, Bituminious repairing and Dressing Chilchalling work in stretches under Mollarpur Highway Sub-Division of Birbhum Highway Division-I in the District of Birbhum, during the year 2024-2025
Majdia Bhajanghat Road from 0.00 Kmp. to 6.32 Km. at different stretches for Emergent Repair work under Krishnagar Highway Sub-Division No. II of Nadia Highway Division No.-I during the year 2020-2021.(Pre monsoon Work)
Supply of Diesel Generator Set 6 K.W. on monthly hiring basis for lighting during load-shedding at Division Office and Krishnagar Highway Sub Division No.-II Office under Nadia Highway Division No-I of P.W.(Roads) Directorate.
Chowhatta Hatia Sainthia Road 2.00 kmp to 3.00 kmp and 4.00 kmp to 5.00 kmp Emergent repairing of road at different stretches under Sainthia Highway Sub-Division of Birbhum Highway Division-I in the District of Birbhum
Providing A) 20 (Twenty) Nos. Unarmed Security Guard for round the clock guarding at the 1) Tamluk Stackyard under Tamluk Highway Sub Division, 2) Contai Stackyard and Digha Inspection Bungalow compound under Contai Highway Sub Division under
Plaseey Monument Road from 0.00 Kmp to 3.20 Kmp repairing work in different stretches with potholes repair under Plassey Highway Sub-Division of Nadia Highway Division No.I in the District of Nadia during the year 2025- 2026
Bamunia Mangolpur road (VR) Repair and maintenance works from 4.00 kmp to 5.60 kmp in stretches under Burdwan Highway Sub Division No-I of Burdwan South Highway Division, P.W.(Roads) Directt. in the district of Purba Bardhaman
Mirjapur-Kaligram-Kusumgram-Nadanghat-Samudragarh (MKKNS) Road(SH-8) from 39.00 to 41.00 kmp Emergent Maintenance and Repairing Work in stretches under Nabadwip Highway Sub Division of Burdwan South Highway Division in the district of Purba Bardhaman