Loading…
Loading…
11,108 results • Best match
Construction of Bituminous Road from Highway Kutigram More to Kutigram Culvert within Rampurhat-I Block
Renovation to Electrical Installation of Hooghly Highway Division- I P.W. Roads Directorate at Chinsurah, Hooghly
Repair of Road from Basanti Highway to Jame Masjid Narayanpur G.P under Bhangore I P.S
REPAIRING OF CHOWBAGA ROAD FROM BASANTI HIGHWAY TO HERITAGE INSTITUTE IN W/108, BR-XII
Rehabilitation work of Bridge at 11th Km of Rajnagar Khoirasole Road under Birbhum Highway DivisionII
Constructionof bituminous road from basanti highway to debipur kaorapara GP-Jagulgachi under Bhangar-I block
Rajapur Bridge at 2.40 km of Ulberia - Panpur Road, Rehabilitation work Under Howrah Highway Division
Assistant Engineer, Hooghly Highway Sub-Division, Public Works (Roads) Directorate, Rose Villa, Pankhatuli, Hooghly - 712103
Construction of CC Road to Asian Highway near Hyundai Showroom at Paul para, Matigara, Darjeeling
.Emergent repairing (in stretchesat different roads of Serampore Bridge Highway Sub-Division during monsoon period
Emergent Painting and washing of concrete crash barrier from Toll Plaza to Kona Expressway (Up and Down) including painting of median verge, and structural portion of view cutter of Vidyasagar Setu.
Emergent repairing of big depressions formed due to heavy rainfall at Kona Expressway up ramp of Vidyasagar Setu at Howrah side before the ensuing Durga Puja during the year 2024-25.
Washing and Painting of View cutter at left and right side portion from Toll plaza to Main bridge and on Kona Expressway at Howrah Side of Vidyasagar Setu during 2024 - 2025.
Repairing work in patches from 4.50 Km to 5.00 Km of Bahina More to Birbhum Border Road under Mollarpur Highway Sub-Division of Birbhum Highway Division-I, in the District of Birbhum, during the year 2026-2027
Fanshitala Culvert to Gouranga Setu SH-8 road connectivity with Nabadwip Town By Pass by Ramp-A, Surfacing work of Krishnagar Highway Sub-Division No.-I under Nadia Highway Division No-I, in the district of Nadia.
Majdia-Banpur Road from 0.00 kmp to 3.50 km 4.50 km to 6.00 kmp, repairing work in different stretches of Krishnagar Highway Sub-Division No.-II under Nadia Highway Division No-I, in the district of Nadia.
Patch repairing and maintenance work at 1st, 4th, 5th and 6th Km of Kumarpur-Chakta Road under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the district of Purba Bardhaman during the year 2026-27.
Kalinagar Stackyard, At 4th Km of Uluberia-Shyampur Road, Construction of Boundary Wall under Uluberia Highway Sub Division of Howrah Highway Division in the District of Howrah during the Year 2024-25. (Under Head Plan), 2nd Call
Construction of R.C.Cross Drain (in place of 900mm diameter existing damaged Hume Pipe cross drain) at 5th. Km of Patihal-Khadarghat road under Amta Highway Sub-Division of Howrah Highway Division in the district of Howrah, PWRD
Debogram Katwaghat road from 5.00 kmp to 8.00 kmp Emergent restoration and repairing works in different stretches with potholes repair including 20 mm. P.C. and S.C. under Plassey Highway Sub Division of Nadia Highway Division No. I
Maintenance of shoulder of Old Katwa Kalna Road from 1.00 Kmp to 13.00 Kmp in stretches under Katwa Highway Sub-Division of Burdwan North Highway Division in the District of Purba Bardhaman during the year 2024-25.
Maintenance of Katwa-Karui Road to Sudpur Health Centre Road from 0.00 km to 1.00 km under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2024-25.
Patch repairing work by Brick Stitching from chainage 6.60 kmp to 6.950 kmp of Rajgram-Mohanpur Road under Rampurhat Highway Sub-Division of Birbhum Highway Division I in the District of Birbhum during the year 2025-26.
Mtc. and repair of Katwa-Karui Road (MDR) from 0.00 kmp to 3.00 kmp (in stretchs) under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2022-23.
Emergent patch repair work of Trilokchandrapur-Bhatkunda road from 6.00 kmp to 12.30 kmp under Durgapur Highway Sub-Division of Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman during the year 2022-23.
Garh Bhabanipur H.C. Link Road from Amta Rajapur Dihibhurshut Road, 0.00 Kmp to 0.80 Km Patch Repairing Work of Amta Highway Sub-Division under Howrah Highway Division in the District of Howrah during the year 2024-25
Nimtala Bazar to Bidyanagar Road From 0.00 kmp to 2.00 kmp Emergent Repairing work in patches under Nabadwip Highway Sub Division of Burdwan South Highway Division in the district of Purba Bardhaman during the year 2025-26
Ranigang Jamuria Road (FR-5) from 0.00 kmp to 3.00 kmp emergent repairing under Asansol Highway Sub-Division of Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman during the year of 2020-21
Emergent Restoration of Hatuganj Usthi Road at Different Stretches due to damages caused during laying of pipeline across the road by PHE and recent Cyclone Bulbul under Diamond Harbour Highway Sub-Division of Diamond Harbour Highway Division
Restoration of Black Top and Hard Shoulder damaged due to laying of pipes by PHE Dte. of diffrerent Roads under Falta E.P.Z Highway Sub-Division under Diamond Harbour Highway Division in the district of South 24 Parganas.
G.T.Road (SH-13) (581.00km to 597.335km), Patch Repairing work from (581.800 to 582.00, 584.00 to 586.00, 589.00 to 593.00, 595.00 to9 596.00km under Burdwan Highway Sub-Division No. II of Burdwan South Highway Division, P.W. (Roads) Directt.
Emergent Repair of Bibhutubhusan Ghat Cable Suspension Foot Bridge over River Icchamati at 1.00 kmp on Sreepally Bajitpur Road under Bongaon highway Sub Division of Barasat Highway Division No. II. In the district of North 24 Parganas
Geotechnical Investigation in connection with the construction of a Bridge over River Ichhamati between Tarinipurghat and Berigopalpurghat under Bongaon Highway Sub-Division of Barasat Highway Division No. II Govt of West Bengal in the District of N
Pandua Kalna Road from 6.00 kmp to 12.00 kmp and 20.00kmp to 24.40kmp patch repairing work of Bansberia Highway Sub Division-I under Hooghly Highway Division-II, In the District of Hooghly during the year 2024-2025
Emergent Patch repairing work of Bolerhalt Railway Station Link Road from 0.00 kmp to 2.00 kmp under Nabadwip Highway Sub Division of Burdwan South Highway Division, in the district of Purba Bardhaman during the year 2025-26
Emergent repairing of potholes in stretches between 5.00 Kmp to 11.00 Kmp of Amta - Rajapur - Dihibhurshut Road of Amta Highway Sub-Division under Howrah Highway Division in the District of Howrah in the year of 2025-26.
Installation of Signage Boards on Different Bridges and Roads under Nabadwip Highway Sub Division of Burdwan South Highway Division, P.W.(Roads) Dte. in the district of Purba Bardhaman during the year 2023-24. (Non Plan) (1st Call)
Emergent Repair and maintenance of Sandeshkhali Wooden Bungalow and other other allied works at Sandeshkhali IB compound at Sandeshkhali Island under Basirhat Highway subdivision of Barasat Highway Division No. I in the district of North 24 Parganas.
Emergent Patch repair in stretches of Taki-Murarisha-Bhebia-Chaital Road from 17.00 kmp to 19.00 kmp under Basirhat Highway Sub Division of Barasat Highway Division No.I in the district of North 24 Parganas during 2020-2021.
Balagarh Inchura Road from 0.00 km to 5.00 km Right side shoulder Urgent Restoration of damages made by PHE Department during their distribution pipe laying work of Bansberia Highway Sub Division-I under Hooghly Highway Division -II
Painting of kerbs, Seperator, Fencing, Flyover Crash Barrier ( Inside Outside) of KNI Avenue (VIP Road) both side Main Carraige way including service road , Foot over Bridge etc. under Baguihati Highway Subdivision of Barasat Highway Division No.-I
Emergent protective work of Berhampore Hariharpara Amtala Road near chainage 5.30 Km., 12.29 Km. and 13.00. Km under Berhampore Highway Sub-Division of Murshidabad Highway Division-I in the District of Murshidabad during the year 2024-25.
Instalation of Sign Board at different road and stackyard and other Allied works under Plassey Highway Sub-Division under Nadia Highway Division No.-I, P.W. (Roads) Directorate in the District of Nadia during the year 2024-2025
Link road from S.T.K.K. to Borail from 0.00 km to 1.17 km repairing work in stretches of Bansberia Highway Sub-Division - I under Hooghly Highway Division -II, In the District of Hooghly during The Year 2022 - 2023
Nuntia Mugkalyan Rabibhag Road from Ch.2.70 Km to 2.825 Km, Emergent Embankment Protection Work (Left Side) adjacent to Irrigation Canal ( Chetua Khal) under Uluberia Highway Sub Division of Howrah Highway Division in the district of Howrah
At Service road and approaches of Iswar Gupta Setu repairing potholes in patches by premixed carpeting of Bansberia Highway Sub-Division - I under Hooghly Highway Division -II, In the district of Hooghly during The Year 2026 -2027
Mtc. and Repairs ( in stretches) to Ramjibanpur Palita Palitpur Natunhat Road from 120 to 121km under Bhatar Highway Sub-Division No.-I of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2020_21
Beldanga-Amtala-Patikabari Road from 6.00 Kmp to 16.00 kmp, Patch Repair (Bituminous Potholes, W.B.M Grading II covered by 20 mm P.C. and seal coat in stretches) under Berhampore Highway Sub-Division of Murshidabad Highway Division No.I
Hijuli Matiari Road from 3.00 Kmp. to 7.35 Km. Emergent patch repairing work in different stretches under Plassey Highway Sub Division of Nadia Highway Division No. I in the District of Nadia during the year 2022 2023
Feeder Road from STKK to Sirpur Bazar Road from 0.00kmp to 1.00 kmp. Emergent restoration work of Bansberia Highway Sub Division I under Hooghly Highway Division II in the district of Hooghly during the year 2023 2024