Loading…
Loading…
11,108 results • Best match
Ukhra-Madhaiganj road from 2.00 km to 4.00 kmp, patch repairing of existing road under Durgapur Highway Sub-Division of Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman during the year 2022-23.
Link Road from G.T. Road to Mogra Health Center Road from 0.00kmp to 0.480kmp, Surfacing work of Bansberia Highway Sub-Division I under Hooghly Highway Division-II In the district of Hooghly during The Year 2023-2024
Link road from Raina - Damuniya to Aherbelma Pahalampur road (MDR) - Repair and Maintenance works from 0.00 kmp to 3.00 kmp in stretches under Sadarghat Highway Sub Division No-1 of Burdwan South Highway Division, P.W. (Roads) Directt.
Patch Repairing of Basuldanga Railway Station to Panchagram Health Centre Road from 0.00 Kmp. to 1.85 Kmp. in stretches under Diamond Harbour Highway Sub Division of Diamond Harbour Highway Division in the District of South 24 Parganas.
Pre monsoon estimate for patch repairing works at 5.00 kmp to 10.00 kmp of Rasulpur Khandaghosh Chakpurohit (SH8) Road under Sadarghat Highway Sub Division No_I of Burdwan South Highway Division, P.W. (Roads) Directt. during the year 2020_21
Emergent work for Berhampore Hariharpara Amtala Road from 0.00 Km. to 16.00 Km. for repairing Pot holes under Berhampore Highway Sub-Division of Murshidabad Highway Division-I in the District of Murshidabad during the year 2023-24
Rain Damaged Repair works of Mateary Dewanganj Road from 0.00 kmp to 1.60 km (in stretches) under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2023-24.
Advance Supply of readymade Bituminous Potholes patching mix using medium curing Cutback (MC-800) Bitumen and crushed stone aggregate at different stackyard under Arambagh Highway Sub-division under Hooghly Highway Division No.1, P.W.(Roads)Dte., in
Maintenance and Patch repairing of Radhanagar link Road from ch. 0.00 kmp to 1.00 kmp under Bhatar Highway Sub-Division No.-II of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2022_23.
Improvement of road junction by Concrete Paver Block of Jangipara Market from 9.32 to 9.50 kmp of Bokpotaghat Rahimpur Jangipara Road under Serampore Highway Sub-Division of Hooghly Highway Division No. I, in the district of Hooghly
Plassey Monument Road from 1.00 Kmp. to 2.00 Kmp. Emergent patch repairing work in different stretches under Plassey Highway Sub Division of Nadia Highway Division No. I in the District of Nadia during the year 2022 2023
Supplying jhama metal (63mm to 45mm) and Moorum during the upcoming monsoon period in Gurap stack yard under Hooghly Highway Sub-Division of Hooghly Highway Division No.I in the District of Hooghly. During the year 2024-2025.
Patch repairing work from 0.00km to 1.50km and 4.50km to 5.00km at Takipur Kushmore Road (in stretches) under Rampurhat Highway Sub Division of Birbhum Highway Division-I in the district of Birbhum during the year 2025-26
Repair and Renovation along with post construction anti-termite treatment including electrical works of Tamluk Highway Sub-Division Office Building under Tamluk Highway Division in the district of Purba Medinipur during the year 2024 25. 2nd Call
Santiniketan Prantik Station Road (Two lane with divider wall) from 0.00 kmp to 0.950 km patch repair (in stretches) under Bolpur Highway Sub Division of Birbhum Highway Division-II in the district of Birbhum during 2025-26.
Simulpur Chatra Road from 0.00 km to 4.80 km . Emergent Pot Holes repairing work in stretches including Dresssing Chilchalling of road flank,Repairing of damaged hard shoulderunder Habra Highway Sub Division under Barasat Highway Division No - II
Painting and road furnitures work in Bhagirathi Bridge at Jangipur on BBLR road at Ch. 62.00 Kmp under Raghunathganj Highway Sub-Division under Murshidabad Highway Division No.I in the district of Murshidabad during the year 2022-23
Supply of labour and machineries as and when required for repairing potholes by Esmac PR on different location of different roads under the jurisdiction of Basirhat Highway Sub-Division of Barasat Highway Division No.I, P.W.(Roads) Directorate
Maheshganj Mayapur Road from 0.20 kmp to 1.36 kmp, Surfacing work under Krishnagar Highway Sub-Division No-I of Nadia Highway. Division. No-I, PW(Roads) Directorate. in the Dist. of Nadia during the year 2025-26..
Patch repairing work in stretches from 0.00 km to 1.49 km on Road Around Nabanna and from 0.00 Km. to 0.810 Km on Mandirtala underpass to Kajipara Road of Howrah Highway Sub Division under Howrah Highway Division
Emergent Repairing of Khandighi Anur Road side flank at chainage 4.00 km by bullah piling and Face wall of Hume Pipe Culvert at Ch.2.2km, under Arambagh Highway Sub Divn of Hooghly Highway Divn I, P.W.Roads Directt..
Repair and Maintenance and Roof Treatment of Two storied main office building under Bhatar Highway Sub-Division No. I and II of Burdwan North Highway Division in the Distric of Purba Bardhaman during the year 2023-2024.
Construction of New RCC Drain at Ch.16.18 km of Naksa Digsui Inchura road of Bansberia Highway Sub-Division No.-II under Hooghly Highway Division No.-II in the District of Hooghly during the year 2022-2023.
Emergent Special repairing work of Pandua Kalna road from 12.00kmp to 15.00kmp in Patches of Bansberia Highway Sub-Division no-II under Hooghly Highway Division No-II In the District of Hooghly during the year 2022 2023
Emergent Repairing and maintenance of different roads using pre-coated material mixed at different departmental stack yard during monsoon under Arambagh Highway Sub-division of Hooghly Highway Division 1. P.W.(Roads) Dte., in the district of Hooghly,
Palashipara Bernia road from 2.00Kmp to 7.00Kmp emergent restoration and repairing work in different stretches with potholes repairing under Plassey Highway Sub Division of Nadia Highway Division No-I, P.W (Roads) Dte. during the year 2025-2026
Installation of Signage Boards on Different Bridges and Roads under Kalna Highway Sub Division of Burdwan South Highway Division, P.W.(Roads) Dte. in the district of Purba Bardhaman during the year 2023-24. (Non Plan) (1st Call)
Construction of Main Gate and Boundary Wall around the office of the Executive Engineer, P. W. (Roads) Dte, under Purulia Highway Sub-Division of Purulia Highway Division in the District of Purulia during the year 2021-22
Repairing and maintenance work from 17.00 kmp to 24.50 km in stretches of Monteswar-Dainhat Road under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2024-25.
Badulia Khandaghosh Road (VR) patch Repair works from 10.00 kmp to 15.00 kmp in stretches under Sadarghat Highway Sub Division No-I of Burdwan South Highway Division within the Purba Bardhaman district during the year 2025-26
Emergent repairing of Boinchee Bhastara Majinan Belmuri Road from 0.00 kmp to 11.30 kmp in patches damages cause by cyclone Bulbul under Hooghly Highway Sub Division of Hooghly Highway Division No. I in the district of Hooghly.
Supplying, Fitting and Fixing of Retro Reflectorised Sign Board on different roads under Krishnagar Highway Sub Division No. I of Nadia Highway Division No.- I in the District of Nadia during the year 2019 2020 (2nd Call)
Bhangar (Ghatakpukur) Bodra Road, Restoration due to rain damage of shoulder between 4th km to 6th km under Alipore Highway Sub Division of South 24 Parganas Highway Division in the District of South 24 Parganas.(2nd Call)
Emergent repair work from 34.00 to 36.00 kmp, 43.00 to 46.00 kmp and 50.00 to 52.00 kmp of Mirjapur-Kaligram- Kusumgram-Nadanghat-Samudragarh Road under Nabadwip Highway Sub- Division of Burdwan South Highway Division, P.W. (Roads) Directt.
Supply of labour and machineries as and when required for repairing potholes by Esmac PR on different location of different roads under the jurisdiction of Basirhat Highway Sub-Division of Barasat Highway Division No.I, P.W.(Roads) Directorate ..
Khandighi Jitarpur Health Centre road from Ch.3.990 km. to 4.190 km. Reconstruction with widening work under Arambagh Highway Sub Division of Hooghly Highway Division No. I, P.W. (Roads) Directorate, in the district of Hooghly (2nd Call)
Lal bazar Paglimari road from ch 0.00 Km to 3.0 kmp Pre- Monsoon Road Flank protection and Patch Repairing work ( at different stretches ) of Mathabhanga Highway Sub Division under Coochbehar Highway Division in the District of Coochbehar .
Maintenance of STKK Road (SH-6) including Traffic Safety Measure fom 98.00 kmp to 102.00 kmp under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2024-25.
1) Emergent repairing and maintenance of damaged road surface of Arambagh Goghat Ramjibanpur Road (in stretches effectively 6.45 km) with WMM, Profile Corrective course, MSS etc., under Arambagh Highway Sub Divn of Hooghly Highway Divn I, P.W.Roads
Painting and Repairing of existing concrete Culverts from 0.0 kmp to 33.88 kmp of STKK Road under Bansberia Highway Sub Division- II of Hooghly Highway Division-ll. In the District of Hooghly. during the year 2023-2024
Nalhati Rajgram Road at chainage 18.00km to 20.50km repairing of potholes depression of road surface and dressing and chilchalling under Rampurhat Highway Sub Division of Birbhum Highway Division- I P.W. Roads Dte during the year 2024-25
Minor repairing work of drain with others allied work of Nabanna to Kajipara road at 0.680 km of Howrah Highway Sub-Division under Howrah Highway Division in the Dist. of Howrah during the year 2024 to 2025.
Katlamari Health centre road from 0.00 kmp to 2.20 kmp emergent maintenance and patch repair with stone WBM and Bituminous course under Islampur Highway Sub-Division under Murshidabad Highway Division No-I in the district of Murshidabad.
Patch repairing work of Ramjibanpur-Ketugram-Katwa Road (SH-6) from 91.00 Kmp to 96.50 Km under Ramjibanpur Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2025-26.
Emergent repairing work at shoulder portion on upcoming monsoon period by Jhama metal consolidation work with moorum screning of different roads under Section - I and Section III of Bansberia Highway Sub-Division-II under Hooghly Highway Division
Emergent Restoration at Different stretches of Dakshin Barasat Magrahat Usthi Road from 0.00 Kmp to 21.00 Kmp due to damages caused by Super Cyclonic Storm AMPHAN under Diamond Harbour Highway Sub-Division of Diamond Harbour Highway Division.
Sagardighi-Siteshnagarghat road from 2.50 Kmp to 10.00 Kmp Patch Repair (Bituminous Potholes, W.B.M. covered by 20 mm MSS in stretches), in the Raghunathganj Highway Sub-Division under Murshidabad highway Division No.I. During the year 2020-2021
Surfacing work to Link Road Monteswar Dainhat Road to Chandrapur H.C. from 0.00kmp. to 0.450kmp. under Bhatar Highway Sub-Division No.-II of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2020_21
Reconstruction of collapsed boundary wall (North side and East side) of Office Building under Falta EPZ Highway Sub-Division of Diamond Harbour Highway Division in the district of South 24 Parganas for the financial year 2021-22.
Advance collection of Stone Materials and premixing the same with bitumen for repairing of rain induced bituminous potholes as and when necessary basis on different roads under Hooghly Highway Sub Division of Hooghly Highway Division No. I