Loading…
Loading…
11,001 results • Best match
Repairing and maintenance of Mrigala inspection Bungalow with other allied works at dankuni in the district of Hooghly under National Highway Division- I, during the year 2023-24.
Comprehensive Material Retrieval, Categorization, Weighing, Labelling, organizing including Site Clearance with temporary Pathway and Platform Preparation by engaging Machineries labours at different Stackyards of National Highway Division VI
Emergent patch repairing of Muchipara Shibpur road from 1.00 kmp to 3.00 kmp, 5.50 kmp to 7.00 kmp, 13.00 kmp to 16.00 kmp in stretches under Durgapur Highway Sub-Division of Asansol Highway Division,
Emergent repairing of Kunur bridge Bituminous surface at 9.40km. of Panagarh-Illambazar road by repairing potholes, premix carpet etc. in patches of Sadarghat Highway Sub-Division-II under Asansol Highway Division, P.W. (Roads) Directorate
Chanda - Domohani Road(FR-14) from 11.50 kmp to 14.50 kmp Emergent patch repair of Asansol Highway Sub-Division under Asansol Highway Division in the District of Paschim Bardhaman during the year 2020-21
Emergent repairing and maintenance work of Ukhra-Madhaiganj Road in stretches from 0.50km. to 1.50km., 2.00kmp. to 3.00kmp. and 5.00kmp. to 6.00kmp. of Durgapur Highway Sub-Division under Asansol Highway Division, P.W. (Roads) Directorate,
Patching repairing of Burnpur Samdhi Road 6.00 kmp to 9.00 kmp under Asansol Highway Sub-Division of Asansol Highway Division, P.W.(Roads) Directorate in the District of Paschim Bardhaman during the year 2020-21.
Emergent patch repairing work of Different stretches from road connecting to FR-10 to FR-19 (FR-13) road from 0.0 km to 2.50 km of Asansol Highway Sub-Division under Asansol Highway Division,
Patching repair of NH-2 to Industrial Housing Scheme Road (Sen Ralaigh Road) from 1.50kmp. to 2.50kmp. by providing repairing potholes etc. under Asansol Highway Sub-Division of Asansol Highway Division, P.W. (Roads) Directorate,
Patch repairing work of Muchipara-Shibpur Road from 2.50km. to 4.00km., 6.00km. to 8.20km., 10.80km. to 13.20km. 16.00km. to 18.00km. in stretches of Durgapur Highway Sub-Division under Asansol Highway Division, P.W. (Roads) Directorate,
Emergent patch repairing of Raghunathpur Kantaberia road via Molandighi from 0.00 to 2.00 kmp and 4.5 km to 7.00 km in stretches under Durgapur Highway Sub-Division of Asansol Highway Division, P.W.(Roads) Directorate
Road safety measures on Baguihati Flyover (Both flank) Under Baguihati Highway Sub Division under Barasat Highway Division No.- I in the District of North 24 Parganas.
Jagatpur road from 0.40 km. to 1.30 km. Patch repair under Baguihati Highway SubDivision of Barasat Highway Division No.I in the District of North 24 Parganas.
Bamboo wall fencing at different Location on K.N.I. Avenue under Baguihati Highway Sub-Divn. of Barasat Highway Division No.I in the Dist. of North 24 Parganas.
Repair of Falakata Highway Sub-Division Office, P.W.(R)Dte. including repair of GCI Roof along with Others allied Civil Works at Falakata under Alipurduar Highway Division in the district of Alipurduar during the year 2023-24.
Emergent patch repairing and maintenance work of Ukhra-Nachan road in stretches from 0.00km. to 2.50km. and 0km. to 8.50km. of Durgapur Highway Sub-Division under Asansol Highway Division, P.W.(Roads) Directorate FY- 2024-25
Emergent patch repairing work of different stretches of Pandabeswar-Samla Road (FR-21) from 4.0km to 4.45 by providing patching potholes and 20mm premixed carpeting work of Asansol Highway Sub-Division under Asansol Highway Division,
Rain damage repairing work of Guskara-Ausgram-Choraphari Jungle road from 21.00kmp. to 23.00kmp. in stretches under Sadarghat Highway Sub-Division-II under Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman,
Emergent restoration of flank at Old G.T. Road (Budbud Portion) opposite side of Sadarghat Highway Sub-Division under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardwan during the year 2025-26
Bigra-Dignagar Phase-II road emergent repair by potholes, premix carpet, seal coat etc. in stretches from 3.00kmp. to 4.80km. under Sadarghat Highway Sub-Division-II of Asansol Highway Division, P.W.(Roads) Directorate (2nd Call)
Emergent Sanitary and Plumbing Works including some other works at P.W Roads Dte. Office Campus of Asansol Highway Sub-Division under Asansol Highway Division in the district of Paschim Bardwan during the year 2023-2024
Patch repairing and maintenance work of Ukhra-Madhaiganj Road in stretches from 1.50km. to 2.50km. and 6.00km. to 9.00km. of Durgapur Highway Sub-Division under Asansol Highway Division, P.W. (Roads) Directorate, in the district of
Demarcation and Barricading with Guard post and Barbed wire fencing at KMDAs Land beside18 MLD STP Kalyani Expressway,Barrackpore and allied works.
Land filling over 2 acres low land adjacent to Kalyani -Barrackpore Expressway at Kalyani Industrial Park under WBIIDC, Kalyani, Nadia..Pin-741235.
Construction of cement concrete road from State Highway towards Cooch Behar Tea Garden Pry. School within Barosolmari G.P under Mathabhanga-II Development Block. Fund TDD
Construction of Chainlink Fencing on the both side of State Highway from Prem Road to Subarna Jayanti Bhaban at Ward No. 1 within Haldia Municipality
Bhedia Chora Road repairing work at 14th km Ramnagar Tentultala more of Sadarghat Highway Sub-Division No.-II under Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman during the year 2022-23
Conducting various test for health assessment of Kunur Bridge at 9th km of Muchipara Shibpur road under Durgapur Highway Sub Division of Asansol Highway Division in the District of Paschim Bardhaman during the year 2025-26
Emergent repairing work of damaged culvert at 8th km of Ukhra-Madhaigang road of Durgapur Highway Sub-Division under Asansol Highway Division, P.W.(Roads) Directorate in the District of Paschim Bardhaman, during the year 2025-26.
Repairing of damaged Boundary wall at Raina Stackyard under Sadarghat Highway Sub-Division No.-I
Moonsoon preparedness work for Falakata Highway Sub-Division under the Alipurduar Highway Division, P.W.(Roads)Dte. in the district of Alipurduar during the year 2026-27.
Estimate for traffic calming measure Gopalnagar Chowberia Ukhra Road and Chandpara Nahata Akaipur Road,.i.c.w RTA cases taken in last one month, under Bongaon Highway Sub Division of Barasat Highway Division No. II Govt of West Bengal
Chandpara Palla Road from 3.50 Km to 7.00 Kmp, Emergent Patch Repairing work in stretches under Bongaon Highway Sub Division of Barasat Highway Division No. II, Govt of West Bengal in the District of North 24 Parganas.
Chandpara Palla Road from 0.00 km to 4.00 km Emergent Patch Repairing work in stretches under Bongaon Highway Sub-Division of Barasat Highway Division No. II Govt of West Bengal in the District of North 24 Parganas.
Pandabeswar Shamla road from 0.00 kmp to 5.00 kmp patch repair under Asansol Highway Sub-Division of Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman during the year of 2020-21(SL-2)
Emergent patch repairing work of different stretches under from road connecting Burnpur-Samsi (FR-19) road from 12.10km. to 14.00km. of Asansol Highway Sub-Division under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim
Chanda-Domohani Road (FR-14) from 11.5 kmp to 14.5 kmp patch repair under Asansol Highway Sub-Division of Asansol Highway Division, P.W.(Roads) Directorate in the district of Paschim Bardhaman during the year of 2020-21
Emergent patch repairing work of Station Link Road, from 0.00kmp. to 0.300km. and 0.600km. to 0.900km. in stretches underDurgapur Highway Sub-Division of Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardwan 25-26
Emergent patch repairing work of Different stretches at Domohani-Gourandi-Runakuraghat from 8.50 km to 9.50 km by providing patching potholes and 20mm premixed carpeting work of Asansol Highway Sub-Division under Asansol Highway Division, P.W.(Roads)
Chandpara - Jhawdanga Road from 4.00 Kmp to 8.00 Km, Emergent Patch Repairing work in stretches under Bongaon Highway Sub Division of Barasat Highway Division No. II, Govt of West Bengal in the District of North 24 Parganas.
Repairing and maintenance work of traffic rotary and island at DVC Feeder under Durgapur Highway Sub-Division of Asansol Highway Division, P.W.(Roads) Directorate in the District of Paschim Bardhaman, during the year 2025-26.(2nd Call)
Construction of Boundary Wall at Vacant land beside Kalyani Expressway adjacent to Barrackpore Housing Complex Phase II at Wireless More.
Construction of Concrete road from National Highway 34 to h/o Jamuna Sharma at Mouza- Adhata, Sansad no XII under Adhata Gram Panchayat of Amdanga Block. Activity code 97925563
Route survey and way leave permission along and across of National Highway in Augmentation of Chandrakona Road Railway Station Zone_I PWSS under Kharagpur Sub_Division of Midnapore Division PHE Dte.
New wing wall of sinjuri 1 bridge at chainage 310 123 kmp of NH 14 D S right hand side of National Highway Division XII of the year 20242025
CONSTRUCTIO OF PCC ROAD FROM NATIONAL HIGHWAY TO HO RAHIM SK AT DIGHIRPAR UNDER DAKHALBATI GP JL NO 106 MOUZA JOYKRISHNAPUR PLOT NO NH TO 09 ACT CODE 89355759
Construction of Paver Block road from New Station Worker Colony at Ranicherra T.G. to PMGSY road near National Highway at Damdim G.P., Mal Block, in the district of Jalpaiguri.
Repair and Maintenance work Boundary wall on Southside Part of Northern Highway Circle Office and Other allied works under Malda Highway Division, in the district of Malda.
Rasulpur -Khejuri road from 6.20Km to 9.00Km, maintenance work by Jhama metal and Dressing chilchalling work in stretches under Contai Highway Sub-Division within Tamluk Highway Division
Patch repairing work in stretches of Nabanna Zone of Howrah Highway Sub-Division under Howrah Highway Division in the district of Howrah during the year 2025-26