Loading…
Loading…
23,368 results • Best match
Athavanad GP 363/24-25 Construction of Generator shed -at PHC in ward 13
Annual Plan-Kannambra GP 2024-2025 PHC RENOVATION- P NO 163-General Civil Work
Annual Plan- Rennovation of PHC main centre to HWC - PERAYAM GP 144/2023-24
Athavanad GP- 316/23-24 Construction of PHC-BUDS Compound Wall- in ward 13
IRIMBILIYAM GRAMA PANCHAYATH 2023 24 PHC WELL IMPROVEMENT AND DEEPING PRO NO 316 24
Re-Tender CHITTAR GP 234/24 Rennovation of PHC velimala Colony Road ( Ward 12)
AruvappulamGp pro no 202/21-22 Toilet construction for PHC subcentre in ward 13
Annual Plan-Kottopadam GP Pro No 241/26 Koduvalippuram PHC Road retaring Ward-17
GENERAL-Providing Inverter-Supply and providing inverter at PHC, Nelliyampathi, Palakkad.-General Electrical Work
Annual Plan 135/23-Maintanence of PHC subcenter in Yeroor GP-General Civil Work
General electrical work-MOE1-KSMART-255599/2025 Electrification to urban PHC in div.64
Annual Plan 2018-19 (324-19, 338-20 (SO)) Construction of Toilets in PHC
Re Tender -Annual Plan KANNAMBRA GP PROVIDING LABORATARY FACILITY AT PHC -Project No. 40
Muthuvalloor GP 2021-22 Pro no 203/22 Sheet works to Vilayil PHC yard
Pro No 115/2024 25 Completion works of Drinking water project near Karikkottakkari PHC
Construction of Dugwell recharge structure with filter unit at PHC Thazhakkara in Thazhakara Gramapanchayat.
Elampalloor GP 88/21-22 Construction of Immunisation room and conference hall in PHC
Iritty BP_128_ Construction of compound wall, interlock and additional facilities to keezhpally PHC Quarters
Proj No 402/25-26 Renovation of PHC Subcentre at Pottore in Ward 11
Annual Plan-Kadapra GP 2024-2025 /103-Wall Construction Of PHC Sub Center Valanjavattom
Pro No 275/26,Renovation works to compound wall at PHC -in ward 12
Pampadumpara PHCProviding UPS and allied electrical works Pampadumpara PHC Providing UPSand allied electrical works.
SO379/26 Electrification of PHC IP block Old age Home and Shelter ward 15
95/26-Maintenance of Moonnilavu PHC And Three face conection -General Electrical Work
GENERAL-Running Contract estimate for emergency works and minor works at Ward No.6, Ward No.7 and Ward No.8 at Mental Health Centre Kozhikode-General Electrical work
Government Hospital and Old age Clinic Building and Protection wall construction
Design, Supply, Installation and Commissioning of 50kWp Grid Connected SPV Power Plant at Kuttipuram Taluk Hospital,(TopCon Panel) Malappuram
GENERAL Finishing works to Maternity Block Pazhayangadi Taluk Hospital Kannur SITC of fire Fighting Systems Electrical Fire Fighting Work
General project-SO 57/26 Aryad block panchayath Installation of Lift For Muhamma CHC General electrical work-estimate is created for the supply installation testing and commissioning of 1 no.15 bed cum passenger mrl-gls elevator at muhamma chc
PANTHALAYANI BLOCK PANGAYATH 2020-2021 .PR NO.57- CONNECTED WORKS IN CHC THIRUVANGOOR IN CHEMANCHERY GP
Annual Plan-Kattappana block 2024-25 Pro No 177/25Additional facilities to CHC Vandanmedu and lab modernization
Annual Plan-MBP 2025-26-Project no 183/26 BUILDING CONSTRUCTION FOR MAYYANAD CHC General Civil Work
Annual Plan-2024-25 Kanjirappally Block (Project No 77/25)-Improvement of Basic Facilities of Erumeli CHC
Erection, Installation and Commissioning of 62.5 KVA DG SET at CHC, Vadavucode under CSR Scheme of FACT.
DEPOSIT-CHC-VELLARADA-OP BLOCK-Construction of OP Block in Vellarada C.H.C -ELECTRICAL work-General Electrical Work
Kalikavu BP 2023-24,Pro 88/24, RENOVATION WORKS TO COMPOUND WALL AND INTERLOCKING AT CHC KARUVARAKUNDU
Annual Plan- Chambakulam Block Plan 2025-26 Facilities for Vehicle parking in CHC Chambakulam-.-General Civil Work
Anchal BP 2021-22 Pr No 122/22 Anchal CHC roofing and infrastructure development in anchal GP
Annual Plan-2022 and 2023-Mankada BP-Compound Wall Gate Construction and Interlock tiles laying in CHC
Annual Plan 2024-25 Mankada BP (Proj No. 43/25)-Completion of Repair Works at CHC Puzhakkattiri
KMC Division 10 Project No. 1391/2025-Thrikadavoor CHC Construction of room for storage of Bleaching Powder
MLKV 114 CHC-Pattikkunnupara Road renovation in ward 10 of Melukavu GP under annual plan 2022-23
Annual Plan-POTHENCODE BP 2024-25 PRO NO 21/25-RENOVATION TO PUTHENTHOPU CHC-General Civil Work
Kuzhalmannam GP 2023-24 - Project No. 231_26 - Construction of FWC Sub Centre Chithali under CHC Kuzhalmannam-Electrification
DEVELOPING SUB CENTRES TO HEALTH AND WELFARE CENTRES IN MALAPPURAM DISTRICT - PAPPAYI SUB CENTRE (KOTTAKKAL CHC/FHC)
Annual Plan Tile paving at Moothakunnam CHC compound to eliminate waterlogging 75 2025 26 General Civil Work
Annual Plan-P.NO 309/23 Parappanangadi Municipality Take a Break Construction at CHC Neduva -General Civil Works
Annual Plan-Ponnani BP 2024-25 -Edappal CHC - Public Health Laboratory Renovation Electrical work -General Electrical Work
Annual Plan-Pro.No.100/26-Nilamel CHC Electrification and Related work-Cdlm BP.-Electrification.-General Electrical Work
Annual Plan 2023-24 Mankada Block Panchayath (Proj No. 175)-Renovation of CHC, Mankada in Mankada GP