Loading…
Loading…
11,086 results • Best match
Laying of 110mm and 160mm dia HDPE water pipeline at Sri Venkateswara Housing Colony in Ward No. 01 (15th Finance Commission - 2024-25 (1st Installment) Tide Grant).
TOP HOUSING AS PER DRG NO. WD-12008-S/1 ALT. 03 ITEM 2 confirming to RDSO Spec. WD-62-MISC-17 Rev-1 of Jul-25.
Top housing for PU side bearer pad to drg. no. AAL-021101 Alt-8, item-1. confirming to RDSO Spec. no. WD-38-misc-2004, Rev-2.
Top housing for PU side bearer pad to drg. no. AAL-021101 Alt-8, item-1. confirming to RDSO Spec. no. WD-38-misc-2004, Rev-2.
Investigation, Design, Manufacturing, Supply, Lowering and laying and Jointing Trunk mains of water supply (Pumping main from sump at Abbas Nagar) of PMAY - NTR Colony (HFA) at Dinnedevarapadu area/Jaganathagattu, Kurnool of Kurnool District including 02 (Two) years defect liability period on Lump sum contract(Percentage tender).
Electrification of layouts for E/s to 3824 Nos. LT Cat I services for newly constructed houses by APTIDCO at Nandamuri Nagar Layout under PMAY Scheme at Nandamuri Nagar, Nandyal (T) in Operation Division, Nandyal of Kurnool Circle (WBS No. E-2017-08-02-11-03-038)
Electrification of layouts for E/s to 3840 Nos. LT Cat I services for newly constructed houses by APTIDCO at SRBC Colony Layout under PMAY Scheme at SRBC Colony, Nandyal (T) in Operation Division, Nandyal of Kurnool Circle (WBS No. E-2017-08-02-11-03-037)
Electrification of layouts for E/s to 3824 Nos. LT Cat I services for newly constructed houses by APTIDCO at Nandamuri Nagar Layout under PMAY Scheme at Nandamuri Nagar, Nandyal (T) in Operation Division, Nandyal of Kurnool Circle (WBS No. E-2017-08-02-11-03-038)
Electrification of layouts for E/s to 3840 Nos. LT Cat I services for newly constructed houses by APTIDCO at SRBC Colony Layout under PMAY Scheme at SRBC Colony, Nandyal (T) in Operation Division, Nandyal of Kurnool Circle (WBS No. E-2017-08-02-11-03-037)
Electrification of layouts for E/s to 3824 Nos. LT Cat I services for newly constructed houses by APTIDCO at Nandamuri Nagar Layout under PMAY Scheme at Nandamuri Nagar, Nandyal (T) in Operation Division, Nandyal of Kurnool Circle (WBS No. E-2017-08-02-11-03-038)
176002400026, FILTER HOUSING 91576573 73K030, 176002400027, FILTER HOUSING 91576573 74K801
Repairs to roof slab, Plinth protection along with damaged PVC pipe line and painting to Type-IV and V Quarters near GJH at Salagramapuram
Providing 3m width Security track along the Quarters side of SMPC2 compound wall from Gate 1B for a length of 1500m at SDSC SHAR
REPAIR REPLACEMENT OF INTERNAL WIRING FITTINGS FIXTURES AT SVN COLONY MES KEY PERSONNEL QUARTERS NAUSHAKTHI VIHAR AREA UNDER AGE EM OF GE ND VISAKHAPATNAM
Supply, Installation, Testing and Commissioning of 2Nos of 10Passenger LIFTs to AP Police Head Quarters at 6th Btn., APSP, Mangalagiri of Guntur District (STN).
Construction of CC drain and culverts from D.no. 20-2-303 to 20-2-342 in Kodadibba kindhi quarters drain in Division no. 41
Construction of 6seated toilet block with urinals at the premises of AR Head Quarters, Khailasagiri in ward no. 06 of Zone - I (2nd Call).
Providing Internal C.C Roads at Various Places in C.R.P.F Quarters Down Left Side Area (T. Srinivasulu house to V.Vinod House) in Division No.31
Construction of 6seated toilet block with urinals at the premises of AR Head Quarters, Khailasagiri in ward no. 06 of Zone - I (2nd Call).
Improvements and Urgent Repairs to Residential Executive Engineer(S3&S6) Type and Deputy Executive Engineer type(S4) quarters at Neelagirisangam, Nellore, SPSR Nellore District.
Replacement of Damaged GI pipe lines of Individual over head tanks of C2 type Quarters No. C2-97 to 237 at PNN Colony, Sullurpeta.
Dismantling of Old Compound Wall & Construction of New Compound Wall at South West Corner of District Head Quarters Hospital at Chittoor in Chittoor District
SDSTPS-2X800MW-Integrated Township-Housekeeping of common arears in 'D' type quarters in A-Colony for the period from April'2017 to March'2018
Urgent Repairs to Electrical Installation and Replacement of Electrical Fixtures in the pump room at A-type Government Quarters near Andhra University in Visakhapatnam
Replacement of Switches, Sockets, ceiling fans, Heating elements etc., in 2nd & 3rd NC, GNB Quarters in ESD-West, Tirupati for the year 2020-21.
Construction of central divider from Atmakur Bustand Under bridge to Police Quarters road along Stonehousepet Main Road in Nellore Municipal Corporation, Under NUDA Jurisdiction.
Dismantling of Old Compound wall & Construction of New Compound wall at South West Corner of District Head Quarters Hospital at Chittoor in Chittoor District
Erection and removal of pendals for various functions at Vinayakanagar quarters, Padalamandapam and free luggage center at Alipiri, Tirupati for the year 2020-21
Supply and Installation Testing and commissioning of 6 Persons 408Kgs G 5 6 Stops Lift to Squadron Group commander Quarters at Greyhounds at Visakhapatnam
Annual Maintenance of Panchajanyam rest house, PAC-III, New C & D Type quarters and surrounding car parking at Tirumala for the year 2020-21
Architectural and Engineering Consultancy Services for Construction of One Stop Crisis Centre in the Premises of District Head Quarters Hospital, Chittoor in Chittoor District.
Laying of 160mm dia HDPE Pipe line (Righter line) from D.No. 28/1525 to 28/1068-19-4 in Nurse quarters Ward no. 28
Providing Additional Panel board for Distributing Power supply to AC outdoor units at AP Police Head Quarters at 6th Bn, Mangalagiri of Guntur District
Construction of CC drain and culverts from D.no. 20-2-326 to 20-2-522 in Kondadibba kinda quarters drain in Division no. 41
Repairs to the damaged pipe lines and paintings to internal and external walls to Type III and IV quarters opposite SCC at SG Puram
WELCOME MAINTENANCE TO A TO D SECTOR OFFICERS MARRIED QUARTERS, ATT AND CERTAIN MISC B/R WORKS AT DOLPHIN HILL UNDER GE (NB) VISAKHAPATNAM
WELCOME MAINTENANCE TO A TO D SECTOR OFFICERS MARRIED QUARTERS, ATT AND CERTAIN MISC B/R WORKS AT DOLPHIN HILL UNDER GE (NB) VISAKHAPATNAM
WELCOME MAINTENANCE TO A TO D SECTOR OFFICERS MARRIED QUARTERS, ATT AND CERTAIN MISC B/R WORKS AT DOLPHIN HILL UNDER GE (NB) VISAKHAPATNAM
Electrical refurbishment works for C2 type Quarters 283 Nos in Sullurupeta colonies Phase IV works at PCN colony. External Power Supply Augmentation. Package B
Upgradation of 4 nos Type-II quarters including providing IEI and Fans, power wiring, street lighting, safety equipment at National Sanskrit University, Tirupati, AP
Urgent Repairs to in Km 11/0 to 21/0 of Putlur mandal head quarters to Iguduru (via) Yerraguntapalli - Juturu road in Anantapuramu District
Providing UG cable service connections in place of LTOH lines to A-type Quarters and shifting of High mast near Vengamamba park at Tirumala
ARM works (Electrical) at ESIC Hospital Kakinada along with 32 Residentail Quarters. SH: Comprehensive Annual maintenance of 2 Nos 60KVA UPS of Vertiv Make.
Replacement of Switches, Sockets, Ceiling fans, Heating elements etc., in 2nd & 3rd NC, GNB Quarters in ESD-West, Tirupati for the year 2021-22.
Widening of Road from Locks Superintendent Quarters to Lotus Hotel and Junction Improvement at Lotus Hotel in Tadepalli of Municipal Corporation under General Funds
Rewiring and special repairs to EI of B type quarter(6 Nos & Minor repairs to 2 Nos quarters) under RHS at Seethammadhara in Visakhapatnam
Construction of Pilgrim Hall, Construction of Archaka Quarters and Construction of Vahanasala to Sri Venkateswara Swamy Temple, Brahmin Street, 1-Town, Vijayawada, Krishna District
Supply, Installation, Testing and Commissioning of 2Nos of 10Passenger LIFTs to AP Police Head Quarters at 6th Btn., APSP, Mangalagiri of Guntur District (STN).
Dr NTTPS- Repairs to the damaged floorings and other civil works in various types of quarters of B colony for the year 2020 2021
Providing C.C Roads from Ankamma Thalli Temple to C.R.P Quarters Road (Ch.150 to ch.315) in Vijaya Nagar Colony in Division No.31