Loading…
Loading…
6 live1 closing this weekmost from CPWD and Chhattisgarh Medical Services Corporation Ltd. (CGMSC)
6 results • Best match
AHU-AIR HANDLING UNIT (HDU/ICU) WORK AT 50 BEDDED CRITICAL CARE HEALTH UNIT (CCHB) KORBA, DISTRICT-KORBA (C.G.)
AHU-AIR HANDLING UNIT (HDU/ICU) WORK AT 50 BEDDED CRITICAL CARE HEALTH UNIT (CCHB) DH DURG, DISTRICT-DURG (C.G.)
RMO EI and fans, lifts, water supply, substation, fire alarm and fire fighting and air conditioning plant etc. at AG Office Raipur, SH: Comprehensive Maintenance of 13 Passenger lifts & service elevator KONE make during 2026-27.
Supply Installation, Testing & Commissioning of Cab Air Conditioner HVAC unit with built in Inverter by cutting the roof and wielding mounting frame and making provision of drain
Custom Bid for Services - Servicing and replacement of defective spare parts of Air Conditioners installed at Urja Club, Kusmunda Area Similar Category Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System)
Construction of Permanent Campus of Indian Institute of Technology Bhilai at Kutelabhata, Durg, Chhattisgarh. Phase-B-Part-1. SH- Engineering Department (3 blocks) (G Plus 5), Administrative block (01 block) (G Plus 3), Lecture Hall Complex (01 ... installation, HVAC , ...