Loading…
Loading…
31 live13 closing this weekmost from PWD and TNEB Limited
31 results • Best match
COMPREHENSIVE MAINTENANCE OF 48 HP VRF AIR CONDITIONING PLANT
81496 COMPREHENSIVE MAINT OF CENTRAL AC PLANT AT INS PARUNDU UNDER GE TIRUNELVELI
O RING KK71EW471 for HVAC Chiller centrifugal compressor terminal block, Scotchfil Insulation Putty for HVAC Chiller centrifugal compressor terminal block, Electrical Tape (Super 88) for HVAC Chiller centrifugal compressor terminal block, Frame -2 & ... for HVAC Chiller centrifugal ...
87748 Repair and maint to central AC plant to certain storage accn at INS Rajali Arakkonam
SPECIAL REPAIRS/ REPLACEMENT OF CENTRAL AC PLANT AGAINST BER AT CHANAKYA AUDITORIUM OF OTA UNDER GE STM CHENNAI.
Augmentation of the existing HVAC system with VRF Air Conditioners at the VoCPA premises
HVAC and Chiller Operations Breakdown Rectification and Maintenance and AI-based monitoring and Optimisation at UAB Campus
Special repairs to 4 Nos. 250 TR Chiller plants, Primary Motors and Secondary Motors with all AHU and FCU units in Super specialty building of GMKMS Hospital at Salem in Salem District
SITC of Voltas Make 11 TR Outdoor Unit for (3X11TR) AHU
SPARES FOR BLUESTAR CHILLER -CONTROLLER-HMI DISPLAY
SITC of VRF System at FRFCF.
supply and commissioning of air cooled chiller plant
Engaging of HVAC Consultant for TNMSC Drug warehouses
Customized AMC/CMC for Pre-owned Products - AMC FOR VAM CHILLER OF MODEL 2B; AMC FOR VAM CHILLER OF MODEL 2B; Annual Maintenance Contract (AMC); Quarterly; No
Facility Management of HVAC installations at Terminal Buildings at CIA. SH Rate contract for HVAC Installations at T1 and T4 for the year 2026-28.
C23M26R340 2815991094 DUCTABLE SPLIT TYPE AC 5.5 TR, 2820990314 HARD DRAWN COPPER PIPE 5/8", 2820990114 HARD DRAWN COPPER PIPE, 7/8 IN, SERV INSTALLATION, COMMISSIONING AND TESTING
Providing additional 1 No. 17TR Ductable AHU AC unit in Burns ICU at Government KMC Hospital, Chennai-10
NCTPS II-SE MI Circle MPM III AC Plant - Unit I II PHB SB dismantling of severely corroded and damaged air duct and fabrication, erection of new GI duct with MS structural frame by angle in Air handling unit dur
MPM III - Switch yard Ventilation system - Overhauling of switch yard Air handling units 80,000 CMH in 400 KV 12,500 CMH in 230 KV Capacity centrifugal fans, water circulating system pumps and valves, cleaning of spray hea
Custom Bid for Services - FABRICATION AND COMMISSIONING OF BURNER SYSTEM DUCTING AND PIPE LINES FOR TESTING OF EXHAUST MANIFOLD AS PER SCOPE OF SUPPLY AND SCOPE OF WORK IS ENCLOSED IN ANNEXURE A Similar Category Maintenance and Pigging Service for Oil and Gas Pipelines
Renewal by supply and fixing of 11.0 TR floor mounted air handling unit with connected accessories in Honorable Minister for Rural Development and Water Resources at Main Building, Secretariat, Chennai - 09.
Renewal by supply and fixing of 8.5 TR Ductable AC unit with accessories at HRM Tappal section first floor of Main Building Secretariat, Chennai - 09
Renewal by Supply and Fixing of 8.5TR One Number Ductable AC Unit with Accessories at Finance FC Section at First floor of Main Building Secretariat, Chennai - 09
Renewal by supply and fixing of 16HP Outdoor and Indoor VRF AC unit system to ULC Hall at 3rd floor of main building, secretariat, chennai-9.
Renewal by supply and installation of 11 TR Ductable Type AC unit to Law department section and Under Secretaries chamber at 3rd floor of main building, Secretariat, chennai-09.
Renewal by supply and fixing of Two Number of 8HP VRF AC unit system at Chief Secretary control room 2nd floor of main building, secretariat, chennai-9.
NCTPS I SE MI Circle AMC 26 27 MPM Dn AC Plant Routine and Breakdown maintenance in the 16 5 TR 11 TR package Air conditioner located in the UCB II UCB III ESP III unit control room for a period of one year from the date of handing over the site
Annual Maintenance of 8 Nos of 8.75 5.5 Ton ductable scroll AC Ist Floor Western wing Howard Hall Howard Hall Annexe ERP Room 41 Nos of 2 Ton 1.5 Ton Window Split AC units of various make and capacity in NPKRR Maaligai for a period of 1 year 26 27