Loading…
Loading…
1,912 live1,333 closing this weekmost from Department of Water Resources and IRRIGATION AND WATERWAYS DEPT.
1,912 results • Best match
Construction of Box Type VRB at Ch.5423 mt. Mahudha to Mangalpur to Vina to Shedhi River Drain.
Contructing New HR in Place of old Existing HR No.5-6 on Vadala Tank Bank(2 Nos.)
Constructing Precast Concrete RCC Box Culvert at ch.4860 mt & ch.7750 mt Ex Tail Distry.
Contructing New HR in Place of old Existing HR on Goblej Tank Bank(5Nos.)
Construction of Box Type VRB In Place of Damaged Pipe VRB at Ch.2650 mt. of Porda to Saiyat tank Drain.
Constructing WBM Road on Goblej Training Kans to Goblej Tank Feeder.
Providing C.C. Lining to Latwadi Kansadi Ex Dharoda Drain With Structure.
Reconstruction of damaged masonry structures and execution of other works on the Kosi Dy, situated within the jurisdiction of the Upper Division, Agra Canal, Mathura in District Mathura
New Construction of the Sihori Dhiramai route spanning from the Bamba culvert to the LGC track Hazara Canal via the Garhwala route during the 2026-27 financial year.
ESTIMATE FOR LINING / RELINING OF WATERCOURSES OF O/L 34522/R (SLICE - 03) OF PATTI DY , VILL- RAIPUR BLEEM DISTRICT- TARNTARN UNDER UBDC CANAL SYSTEM.(LENGTH 1393 MTR)
ESTIMATE FOR LINING / RELINING OF WATERCOURSES OF O/L 34522/R (SLICE - 02) OF PATTI DY , VILL- RAIPUR BLEEM DISTRICT- TARNTARN UNDER UBDC CANAL SYSTEM.(LENGTH 887 MTR)
Constt of Lane From Ranbir Canal Pull to Bhajan Singh House at Sua No 1 W.No 6 Pyt Malpur Block Bhalwal Scheme MPLAD for the Year 2026-27
Special Repairs to Sluice No.1, 6, 20, 21, 22, 23 and Taildam of Mile 2.1.000 (R) Distributory of Parambikulam Main Canal in Udumalpet Taluk of Tiruppur District.
Repairing and Reconditioning work of 1 Nos. Escape Gate size (2750mm x 2400mm) at RD 29 km of O.S.P Main Canal Phase-II at Mandleswar Distt-Khargone (M.P.)
Excavation and Cement Concrete Lining of Baitarani Right Bank Canal (BRBC) from RD 0.00 km to RD 3.40 km (Balance work) including construction of structures and service road.
Construction of road from km 2 of Devkali link road to canal Patri towards residences of Sardar Matiha, Bareek Singh, Santosh Singh, and others in Nanakmatta Under TSP.
Silt Clearance/Removal of blown sand from lined canal section of High Level Minor RD 0.000 to RD 20.500 (Tail) Chhillan Disty. RD 0.000 to RD 38.675 (Tail)
Lining Repair and Construction of Balance Works of Right Main Canal and its Structures of Package 2 (RD 17.16 to 31.40 km) under North Koel Reservoir Project Jharkhand
Lining Repair and Construction of Balance Works of Right Main Canal and its Structures of Package 1 (RD 0 to 17.16 km) under North Koel Reservoir Project Jharkhand
Installation and Commissioning of Grid Connected Solar PV Power Plants of cumulative array capacity 643 KWp at different locations under Irrigation Waterways Department, West Bengal including 5 years comprehensive maintenance on turnkey basis
Request for Proposal from empanelled WRD Consultants for preparation of Detailed project report and Bid Document for New Triveni Weir Scheme under Executive engineer irrigation Division, Godda Shivir Mahagama, Water Resources Department
Engagement of different categories of personnel on outsourcing basis for operation and maintenance of Hirakud System under Superintending Engineer, Burla Irrigation Division, Burla for the year 2026- 27 (From 01.10.2026 to 31.03.2027)
Estimate for Providing p/s to 29nos. 67hp Irrigation Pump Connection At Vill- sewra, jhabar, girari, basantpur, kudri, girari manjhepara & Pandrikhar under Pendra(R) D/c of o& m Dn. Pendra Road.
Maintaining the Suthagangai Odai, its Supply channels, Feeding Tanks, 18th Canal Tanks and its Supply channel under the Jurisdiction of Irrigation Section, Theni in Uthamapalayam Taluk of Theni District for the year 2026-2027
Preparation of Detailed Feasibility Report (DFR) cum Detailed Project Report (DPR) for Rejuvenation and exploring the mode of Water Metro Transport along the Buckingham Canal from Ennore to Mahabalipuram
Construction of filed drain channel from Nidhori branch canal to Nandakumar Kuranes farm via Halasidhanath gummat temple of Appachiwadi village in Nippani constituency of Nippani taluka of Belagavi District.
MRC D 10 CONSTRUCTION STRENGTHENING OF CANAL SECTION OF CONCRETE WALL AT SPOTS BETWEEN RD 4200 TO 4800 6200 TO 6600 6800 TO 7520 M OF D 10 A
Supply Intallation, Testing and Commissioning of Diesel Generating Set at RD 58.4 KM of Indira Sagar Main Canal Dist.Khargone. including material, labour, charges, connection and testing etc. complete work.
Construction of Cement Concrete road from Sukhadali Samir Mandal house towards Canal Par ,Mouza- Sukhadali, JL NO-129, Plot - 322,under Sarenga panchayat Samity For the year 2025-26
Construction of a drain and CC tile road in Ward-73 (Sanaua), running along the canal bank from Guddus warehouse, passing via Shakeel, to Shahidamans house (Shahid Painters lane).
Maintenance of Bolera Branch Canal (Ch.9.928 km to 25.390 km) with Distributaries and Minors under jurisdiction of K.B.C. Division No. 1/5 (Unit-I), Chanasma for Year 2026
Maintenance of Bolera Branch Canal (Ch.0.0 km to 9.928 km) with Distributaries and Minors under jurisdiction of K.B.C. Division No. 1/5 (Unit-II), Chanasma for Year 2026.
Construction of Tunnel From Km. 3.875 to 4.500 and Earthwork for making Canal Section from Km 3.635 to Km 3.875 and Km 4.500 to Km 4.700 of Gajarawakhadi Dy..
GENERAL KIP O and M Action Plan 2026 2027 Annual maintenance of Pandalam branch canal from Ch0m to 15482m and RBMC from ch 44015m to 52000m General Civil Work
Construction of interlocking tiles road from Shyamal Rai house towards Katna Canal in village Shaktifarm Baikunthpur in Sitarganj constituency of Udham Singh Nagar district Under State Sector (Balance Part)
LIS Sheeri-Construction of Cement concrete Channel at damaged spots on main canal and sub minors at Spots, jacketing of delivery tanks and providing crate work near supply channel.
Silt clearance and removal of blown sand from lined canal section of Shekhuwala Mr RD 0 to 7.42 Tail, Dhurkot minor RD 0 to Tail for year 2026-27
Operation work to watch and ward to C.R. in Km. 20 on ULBC Main canal and H.R. of URBC For Kharif, Rabbi and HW rotation) for year 2026-27.
ESTIMATE FOR CONSTRUCTION OF WATER COURSE OF OUTLET 32500/TF OF SAIDEWALA BRANCH OF BOHA DISTY. UNDER LEHAL CANAL DIVISION WATER RESOURCES DEPARTMENT PUNJAB, PATIALA ( EXTENSION BRANCH ( PART -1)
Design with Quality Assurance plan, Supplying, Erecting, Testing and Commissioning, of electrical work of 132/33kV Substation Kahurkheda and 33 KV HT Line Tal. Bhusawal, Dist.Jalgaon. of Bodwad Parisar Irrigation Scheme Tal.Bodawad Dist.Jalgaon
Hiring of Consultants - Milestone/Deliverable Based - Carrying out of Aerial LiDAR Survey for the Sonai Irrigation Project in the Cachar District Assam; As per NIT; No; Hybrid(As specified in scope of work)
Special repair and maintenance of Kakdwip Irrigation Bunglow inside the Kakdwip Irrigation Campus at mouza Ganeshpur, G.P- Pratapadityanagar, Block- Kakdwip under Kakdwip Irrigation Division i.c.w. G.S Mela-2027