Loading…
Loading…
1,821 live1,172 closing this weekmost from Department of Water Resources and Irrigation Department
1,821 results • Best match
Gram-Gungavad, Block jagner, District-Agra main Lohadi Nadi par Purv Nirmit Holipura-Second Check dam Ki Marramat Ka kary.
Improvement to Service Road of Daha Left Distributary From RD 8200 m to 10600 m of Daha Irrigation Project for the year 2026-27.
Improvement to Service Road of Daha Right Distributary from RD 4000 m to 8000 m of Daha Irrigation Project for the year 2026-27.
Construction of Protection wall near RD 3600 m on right bank of Daha Left Distributary of Daha Irrigation Project for the year 2026-27.
Improvement to Service Road of Daha Right Distributary From RD 30000 m to 31500 m of Daha Irrigation Project for the year 2026-27.
Renovation of Ramachandrapur Sub-minor between RD 00 m to 300 m of Left Distributary of Baghua Irrigation Project for the year 2026-27.
Survey, Investigation, Preparation of Design & Drawings, Installation, Testing and commissioning of Lift Irrigation Scheme consisting Intake Canal, Jackwell Cum Pump House, Pumping Machinery, Rising Main, Bleeders and Manifolds, Pipe Distribution ... Providing irrigation facility ... Mareguddi Lift Irrigation Scheme ...
Supply, Installation, Testing and Commissioning of micro irrigation system
Construction of Dhepaguda-I Check Dam over Local Nalla near village Dhepaguda in Dasmanthpur Block of Koraput District Under MATY 3.0
Construction of Chapsil-I Check Dam over Local Nalla near village Chapsil in Koraput Block of Koraput District Under MATY 3.0
Construction of Jiraguda-II Check Dam over Bamunijodi Nalla near village Jiraguda in Kundra Block of Koraput District Under MATY 3.0
Cleaning of Main Canal and its Distributaries of Canal Network of Machchhu 1 Irrigation Scheme Section 1 for Rabi Season of the Year 2026-27.
Cleaning of Main Canal and its Distributaries of Canal Network of Machchhu 1 Irrigation Scheme Section 1 for Rabi Season of the Year 2026-27.
Cost of maintenance of Trek path from Check dam to Pattiyangal 2.25 km in Pambadum Shola National Park under Shola National Parks
Operation and Maintenance for 03 years of Punasa Lift Irrigation Scheme including its distribution network by pipeline of Culturable Command Area (CCA) 35008 ha on Turn-key basis including watch and ward of complete scheme as per detail scope of work
Annual maintenance of Edappally branch canal between ch.11.00 km to 15.50 km , including pre water distribution cleaning, operating all shutters, and nets, proper watching of canals and canal bunds, clearing siphons / well drops,
Estimate For Construction Of 18 Nos Check Dams In Kingrawala Choe,Mehngrowal Choe, Wadala Drain, Nazampur Drain And Sultanpur drain For Groundwater Recharge In The Jurisdiction Of Jalandhar Drainage Cum Mining AND Geology For Groundwater Recharge I
Improvement and CC lining of Ghodapalan Sub-minor from RD 1400 m to 1460 m of Left Distributary of Baghua Irrigation Project for the year 2026-27.
Construction of C.C. guard wall with bed lining from RD 6530m to 6610m with desilting from RD 4460m to 7060m of Sankara distributary of Talsara Irrigation Project.
Construction of Settling Pond and De-silting of existing Pond, Garland drain, Check dam at Kodingamali Bauxite Mines in the district of Koraput
GENERAL-Annual maintenance work for 2026-27-Annual maintenance to Check dam across Panathur river at Erinhilamkode in Panathady Panchayath-General Civil Work
GENERAL-Annual maintenance work for 2026-27-Annual maintenance of Check dam across Panathur river at Pookkayam in Kallar Panchayath-General Civil Work
GENERAL-Annual maintenance work for 2026-27-Annual maintenance to Check dam across Panathur river at Balanthodu in Panathady Panchayath-General Civil Work
Retaining wall to irrigation canal near the hous eof Nasir Ahmad Sheer Gojri at Goi nag kargam palpora
Footpath from National Highway to Irrigation canal W2 under ADP at Salamabad for year 2026-27, Block- PARANPILAN
GENERAL KyIP ACP PLAN 2026 27 Rectification Works b w ch 1 450 km and 1 700 km of Ulliyeri Sub Distributary Canal General Civil Work
GENERAL KyIP ACP PLAN 2026 27 Rectification Works to Poonath Distributary Canal b w ch 2 900 km and ch 3 300 km General Civil Work
GENERAL KIP O and M Action Plan 2026 2027 Annual Maintenance of Paranthal Distributary from ch 0m to 5150m Kadakkadu distributary from ch 0m to 6919m Keerukuzhi minor distributary from ch 0m to 2325m and Poozhikkadu distributary from ch 0m 4415m
RM of LIS Lift irrigation scheme for horticulture land Marathu Khad to Tharola Phase 1st Jai Pidi Mata in Tehsil Jubbal Distt Shimla HP SH Repair of RCC Stank of 90000 ltrs cap Laying jointing and testing of GI pipes of various dia
Rehabilitation of Kasubegu Distributary from RD 62250 to RD 85608 with cement concrete lining including construction of falls at RD 68250 and RD 77000 construction of Head Regulator Mehma Minor Cross Regulator of Kasubegu Distributary at RD 83460
CONSTRUCTION OF LASTER (LEFT) CANAL IN JHAKHOLI BLOCK OF RUDRAPRAYAG DISTRICT.
CLEANING OF UG/OH/GLR SUMP OF DIFFERENT CAPACITY INCL CHECK DAM AND CONNECTED REPAIR WORKS UNDER AGE E/M OF GE DSSC WELLINGTON
Providing Services for Continuous patrolling, functioning of canal and vigilant inspection of Hathmati “C1” Zone Main Canal with its Distributaries & Minors of Hathmati Reservoir Project for Rabi Irrigation 2026.
Providing Services for Continuous patrolling, functioning of canal and vigilant inspection of Hathmati “B” Zone Main Canal with its Distributaries & Minors of Hathmati Reservoir Project for Rabi Irrigation 2026
Development of Service road of Kanpur Main Canal from RD 3045 m to RD 6000m of Kanupur Irrigation Project
Remodeling of Pratii to Goshan irrigation canal by way of cement concrete channel at spots Foto Yab Lamar Drass
GENERAL KIP O and M Action plan 2026 27 Annual Maintenance Payyanalloor Distributary ch 0m to 4680 m Payyanalloor Minor Distributary 0m to 1310 m Peringanad Distributary 0 m to 3270 m Ammakandakara Distributary 0 m to 2210 m General Civil Work
GENERAL KIP O and M Action Plan 2026 27 Annual maintenance of Vallicode Distributary from 0m to 8054m Vallicode Minor Distributary from Ch 0m to 2285m Nariyapuram Minor Distributary from Ch 0m to 6800m Thrippara Minor Distributary from Ch 0m to 3
GENERAL KyIP ACP Plan 2026 27 Rectification of leaked portion of Chorode Distributary Canal between Ch 0 700 km and Ch 3 000 km General Civil Work
Providing Man Power for Water Management of Salawadagi Branch Canal ( From 0.00 to 19.07 Km) & its Distributary Network for Tank Filling purpose for The Year 2026-27
PROVIDING SERVICES FOR CONTINUOUS PATROLLING, FUNCTIONING AND VIGILANT INSPECTION OF WATRAK RIGHT BANK MAIN CANAL WITH ITS DISTRIBUTARIES & MINORS OF WATRAK RESERVOIR PROJECT FOR RABI IRRIGATION 202-27, HOT IRRIGATION 2027-28 AND KHARIF IRRIGATION 2027-28 (AUTO DRAW)
Providing the Services of Continuous patrolling, functioning and vigilant inspection of Watrak Left Bank Main Canal with its Distributaries & Minors of Watrak Reservoir Project for Rabi Irrigation 2026-27, Hot Irrigation 2027-28 and Kharif Irrigation 2027-28. (AUTO DRAW)
Opening of turn sluices and closing of Non-turn sluices during Zone III irrigation period in Manupatti Branch Canal, Kiluvangadu Branch Canal and its distributories during the year 2026-2027.
Provide vehicle with driver for Tillari Canal Sub Division No. 02 and Tillari Canal Sub Division No. 04 Sawantwadi under Sindhudurg Irrigation Project Construction Division Charathe-Sawantwadi on Rental basis
Construction of Lepaguda Check Dam over Kurlu Nalla near village Lepaguda in Boipariguda Block of Koraput District under MATY 3.0 for the year 2026-27
Integrated Irrigation, Drainage and Water Infrastructure Modernization Project in Barada Ghed Area (Phase-2). Excavation and Resectioning Of Various Rivers/Drains/ Vonkla/ Canals and Deepening Ponds In Barda Ghed Area. (Package-3).
Continuous Patrolling, functioning & vigilant inspection of Complete Canal Network of Harnav Stage-1 for Rabi Irrigation For Year 2026-27
Realignment of HT/LT lines and transformer at Chittoor road for Mullassery Canal widening in connection with Operation Break Through Project
Improvement to Hagari Aqueduct K.m. 8.00 to 9.00 of distributary no 16(A) under RBHLC including Approches.
Construction of C.C Trough wall of Mirigisinga Sub-Minor and Satahalia Minor off-taking from Kanpur Main Canal and Gopapur Sub-Minor off-taking from Chimila Minor under Kanupur Irrigation Project for the year 2026-27. under AIBP/PMKSY