Loading…
Loading…
1,818 live1,167 closing this weekmost from Department of Water Resources and Irrigation Department
1,818 results • Best match
Estimate for clearance of (weed, jalla, deela, sarkanda , jungle,butti, dhorra,silts)etc manually from New khudal Minor R.D. 0-20650, arkwas distributary From RD 0-29470 and Minors 1 ,2 and 3 of Arakwas Distributary, Dayalpura Distributary
Contruction and extension of irrigation canal from land of Gh Hasan Magray to house of Ali Mohd Mir and others at Pakherpora -B
Improvements of Service road and removal of jungle & silt in distributary of 98 A & 98 B of TLBC(In selected reaches)
Construction of Retaining wall in distributary 98 for embankment reaches to avoid overflow at PO 13A and gate repairs under TLBC.
GENERAL ACTION PLAN 2026 27 Annual maintainence of Konni distributary from Ch 0m to 22125m Vazhamuttam minor distributary from Ch 0m to 4274m Mallaserry Minor distributary from Ch 0m to 915m in connection with water distribution General Civil Work
GENERAL KIP O and M Action Plan 2026 2027 Annual Maintenance of Mallika Distributary from Ch 0m to 5814m Parapetty Minor Distributary from Ch 0m to 2050m and Orippuram Minor Distributary from Ch 0m to 1853m General Civil Work
Establishment of a Screen House for Mother Block in an area of 320 sqm having Drip Irrigation and Weed Mat etc.
Estimate for Rehabilitation of Kasubegu Distributary from RD 24680 to RD 40000 with cement-concrete lining, including construction of fall at RD 32680.
GENERAL KIP Action Plan 2026 27 Annual maintenance of Punalur distributary from ch 0m to 3928m and Thalachira distributary from ch 0m to 4994m and urgent CC lining work at ch between 50m and 100m of Thalachira distributary General Civil Work
Providing ManPower for Water Management of Basavan Bagewadi Branch Canal (From0.00to72.55KM )& its Distributary Network along with lifting of Vertical lift gate and Head Regulator Gates at Ch. 11th km, 19th Km &70th km of Bijapur Main canal for Tank Filling purpose for The Year 2026-27
As per tender Document
Reconstruction of CTC at 5.15 and 10.05 km and Removal of silt and jungle in distributary 95 of TLBC(in selected reaches).
CONSTRUCTION OF STEEL SHADE AT CR RD 900M ON THE GOSIKHURD LEFT MAIN CANAL AND HR ON GOSI (BK) MAIN AND BRANCH CANAL.
Continuous patroling, functioning & vigilant Inspection of khedva main canal with its distributaries & minors of khedva reservoir project for Rabi irrigation for year 2026-27
Construction of the Pastara link road from the Tikri distributary
GENERAL KyIP ACP Plan 2026 27 Rectification of leaked portion of Orkkattery distributary canal between Ch 0 350 km and Ch 0 787 km in Onchiyam panchayath General Civil Work General Civil Work
Improvement to Sunugoradi Distributary from RD 3.900Km. to 4.940Km.
Restoration to Rajas Distributary from RD 1.200Km. to 1.500Km.
Estimate for Rehabilitation of Kasubegu Distributary from RD 53000 to RD 68250 with cement-concrete lining, including reconstruction of DR Bridge at RD 53965
Estimate for Rehabilitation of Kasubegu Distributary from RD 40000 to RD 53000 with cement-concrete lining, including including construction of fall at RD 45580.
Construction of Boundry wall at Kandhighat Pump Canal.
Construction of drainage canals at Kotapalem V, Ranasthalam M Phase 1 under CSR.
CONSTRUCTION OF STEPS AT RD 900M,8250M,11130M ON GOSIKHURD LEFT MAIN CANAL.
1 Term contract for civil maintenance works for a period of two years at HAL Factory Kanpur. 2 Proposed modification of conference room at CNC shop and enclosure for laser cutting machine in TDS at HAL TAD Kanpur. 3 Fixing of Bamboo Fencing ... with Drip irrigation system ...
Operation, maintenance, and repair of all civil, electrical, and mechanical components, including the Patan (Matpur) & Kalyana Pumping Station, civil structures, M.S. pipeline, and distribution network, ensuring efficient and reliable water supply to ... (Matpur)-Dindrol Lift Irrigation M.S. ...
Estimate for repairs to Distributories 13 of Dindi Left Main Canal in Gundlapally Mandal under Dindi Medium Irrigation Project, Gundlapally (m), Nalgonda District
Restoration to Main Canal (MRBC) by Providing C.C.Lining and Keywall in between ch 59000 m to 64000 m under Juridiction of Ode Irrigation Sub division
Restoration to Main Canal (MRBC) by Providing C.C.Lining and Keywall in between ch 43526 m to 46940 m under Juridiction of Ode Irrigation Sub division
Restoration to Main Canal (MRBC) by Providing C.C.Lining and Keywall in between ch 54255 m to 59000 m under Juridiction of Ode Irrigation Sub division
Estimate for construction of Bridge at R.D. 110820 of Ladbanjara distributary
Construction of VRB on Ankushpur Distributary near Village Mallick Sahi.
GENERAL KIP O and M Action Plan 2026 27 Annual maintenance of Kodumon Distributary from Ch 5315m to Ch 16315m Kodumon west minor distributary from Ch 0m to Ch 3280m Kodumon east minor distributary from Ch 0m to Ch 1990m and Murinjakal Minor distr
LIS Pattal- Improvement of canal network from 0 to RD 700 at RD 700 to 2500mts
Reconstruction of CTC at Ch 54 and 87.5 Improvements of SR and removal of silt and jungle in distributary 94 under TLBC (in selected reaches)
REVIVAL ESTIMATE OF AYODHYAPUR LIFT IRRIGATION SCHEME ON MUNNERU RIVER NEAR AYODHYAPUR (V), GUDUR (M), MAHABUBABAD DISTRICT
Providing and fixing Boundary Pidhiya on Both Banks of River Main Ozat, MOP-1, BOP-1 and Other Rivers and Canals for Boundary Between Farms and River/Canal in Various Villages of Keshod and Manavadar Taluka of Junagadh District
PROVIDING SERVICES FOR CONTINUOUS PATROLLING, FUNCTIONING AND VIGILANT INSPECTION OF MESHVO MAIN CANAL WITH ITS DISTRIBUTARIES & MINORS OF MESHVORESERVOIR PROJECT FOR RABI IRRIGATION 2026-27 (AUTO DRAW)
Providing Services for Continuous patrolling, functioning of canal and vigilant inspection of Hathmati “C2” Zone Distributaries with its Minors of Hathmati Reservoir Project for Rabi Irrigation 2026.
Engaging of Hydraulic excavator and tractors for maintenance of canals for the year 2026-27
Estimate for hiring of vehicle for inspection under the project estimate for relining lining of water courses of various outlets of various distributary system in Faridkot canal and ground water division by brick water courses underground pipeline
GENERAL ACTION PLAN 2026 27 KIP LB Annual maintenance of canal Melila West distributary from Ch 0m to 24200m during water distribution jungle clearance of Chemmanthoor campus and Rectification of flume at ch 12100m General Civil Work
CONSTRUCTION OF 33KV LINE FROM NEW PROPOSED 132/33KV GHAZIPUR Ist MARDAH TO PUMP CANAL MARDAH GHAZIPUR ON SEMI TURNKEY BASIS.Ist MARDAH TO PUMP CANAL MARDAH, GHAZIPUR ON SEMI TURNKEY BASIS.
REPAIRING AND RENOVATION OF THE MINOR IRRIGATION CONSTRUCTION SUBDIVISION, (GHOTI)NASHIK AND CONSTRUCTION OF SEPARATE TOILET FACILITIES
Underground irrigation system
Improvements of Service Road, protective work and removal of jungle & silt in Sub-Disty 98/4L &98/5L in Distributary of 98 of TLBC(in selected reaches)
PROVIDING THE SERVICES OF CONTINUOUS PATROLLING, FUNCTIONING AND VIGILANT INSPECTION OF LANK MAIN CANAL OF LANK WATER RESERVOIR FOR RABI IRRIGATION FOR THE YEAR 2026-27. (AUTO DRAW)