O&M Estimate for BASALADODDI LIFT IRRIGATION Scheme Stage-I under Guru Raghavendra Project at Madhavaram (V), Mantralayam (M), Kurnool District for the year 2025-26.
O&M Estimate for BASALADODDI LIFT IRRIGATION Scheme Stage-II under Guru Raghavendra Project at Madhavaram (V), Mantralayam (M), Kurnool District for the year 2025-26.
O&M Estimate for SOGANUR LIFT IRRIGATION Scheme Stage-I under Guru Raghavendra Project at Chinnakothiliki (V), Nandavaram(M), Kurnool District for the year 2025-26.
Construction of series of check dams along Ramaraju vanka from B. Rachapalli to Nayunivaripalli in Ramapuram (M) of Y.S.R. Kadapa District.
2026-HOR01-CB-186 Development of soft landscaping work and installation of drip irrigation system at Ootagedda Outfall Drain (South & North sides), including maintenance for one year period , in Ward No. 29,South Zone .
2026-HOR01-CB-186 Development of soft landscaping work and installation of drip irrigation system at Ootagedda Outfall Drain (South & North sides), including maintenance for one year period , in Ward No. 29,South Zone .
Improvements to Neelapuram minor canal of length 6.390 kms distributory of Gudipadu major-1 canal in Block-40A Under CMP canal in Duvvur Mandal of YSR Kadapa District for effective water regulation including monitering and management
Major Irrigation - Annual maintenance for Operation & Maintenance of 2nd Stage Lifts of Kesavaram lift II at Km 7.425 on Kesavaram Dystributary of P.L.I.S. Main canal of Thota Venkatachalam Pushkara Lift Irrigation Scheme at kotikesavaram Village Korukonda Mandal, E.G.Dt for the period from 01-06-2020 to 31-05-2021 (excluding CC charges).
Operation and Maintenance of 2nd stage lift NARASAPURAM Lift Irrigation Scheme at Narasapuram(V),Korukonda(M) in East Godavari District at Km.20.000 on TVPLIS Main Canal for the period from the date of agreement to 31-05-2019(excludung CC Charges).
Operation & Maintenance of 2nd Stage Lifts of Talluru lift at Km 45.195 of P.L.I.S. Main canal of Thota Venkatachalam Pushkara Lift Irrigation Scheme at Talluru (V) Gandepalli (M), E.G. District for the period from the date of agreement to 31.05.2021 (excluding C.C. charges).
Annual Maintenance for Operation And Maintenance of 2nd stage lift Narasapura Lift Irrigation Scheme at Narasapuram(V) Korikonda(M) in E.G.Dt at Km.20.000 of TVPLIS Main Canal for the year 2017-18(period from 1-06-2017 to 31-05-2018)
Lift Irrigation Scheme to lift 292 Mcft of water from SPVBR left canal at Km.20.500, Km.24.900 and Km.32.000 to fill the tanks of Itugulapadu, Savisettipalli, Kondrajupalli, Varikuntla and Ganganapalli near their respective villages in S.A.Kasinayana Mandal of Kadapa District
Restoration of Irrigation system for effective water regulation including Monitoring and Management of OT shutters of 10 Nos on Major canals off-taking from Nagarjunasagar Right Main Canal under Section 1 & 2, Kurichedu.
Restoration of Irrigation system for effective water regulation including Monitoring and Management of OT shutters of 10 Nos on Major canals off-taking from Nagarjunasagar Right Main Canal under Section 1 & 2, Kurichedu.
Somasila Project GKN Canal Minor 4 and 5 of 42R Major Distributary FDR 2025 2026. Removal of deposited earth in the canal bed from minor 4, 5 due to inlet of rain water from local fields of 42R major distributary of GKN canal.
Shifting of Head works of Anamanamuru (Private) Lift Irrigation Scheme on Gundlakamma Reservoir in Korisapadu Mandal of Prakasam District including maintenance of the scheme for two years
Shifting of Head works of Anamanamuru (Private) Lift Irrigation Scheme on Gundlakamma Reservoir in Korisapadu Mandal of Prakasam District including maintenance of the scheme for two years
Reconstruction of Santhakovvuru Lift Irrigation Scheme on Mogamaneru Vagu in Thonduru Mandal of YSR Kadapa District on turnkey basis including operation of the scheme for two years
LIFT IRRIGATION SCHEME FOR LIFTING OF WATER FROM ZARIKONA RESERVOIR TO FEED PEDDACHERUVU AND OTHER SYSTEM TANKS NEAR CHERUVUMUNDARIPALLE (V) OF SAMBEPALLE (M) OF YSR KADAPA DISTRICT.
Earth work excavation and construction of CM and CD balance works in distributory D2 in sublift-II of Tadipudi Lift Irrigation Scheme consisting sub works(2nd call)
Reconstruction of Santhakovvuru Lift Irrigation Scheme on Mogamaneru Vagu in Thonduru Mandal of YSR Kadapa District on turnkey basis including operation of the scheme for two years
Replacement of 1 Nos of 60 HP HCF Pump set and Electrical & Mechanical works at Somavaram Lift Irrigation Scheme on Yeleru Riverl in Kirlampudi Mandal, Kakinada District.
Shifting of Head Works of Anamanamuru (Private) Lift Irrigation Scheme on Gundlakamma Reservoir in Korisapadu Mandal of Prakasam District including maintenance of the scheme for two years
Micro Irrigation for landscape arrangements for seed access road for a total stretch of 16 kms (Each unit length of 2 kms) in Amaravati Capital City of Andhra pradesh
Micro Irrigation for landscape arrangements for seed access road for a total stretch of 16 km (each unit length of 2 kms) in Amaravati Capital City of Andhra Pradesh
Micro Irrigation for landscape arrangements for seed access road for a total stretch of 16 km (each unit length of 2 kms) in Amaravati Capital City of Andhra Pradesh
Detailed investigation, designs and Construction of Pump House, associated Civil, Electro Mechanical works, Electrical Sub-Station including Installation, Laying of MS Pressure mains, Manifolds, Construction of Delivery Cistern and canal /piped ... for Lift Irrigation Scheme ... Polavaram Irrigation Project ... Main Canal near ...
Construction of series of check dams along Gudumalla vanka from Subbareddy Mango Garden to Udumulavaripalli in Ramapuram (M) of Y.S.R. Kadapa District.
Operation & Maintenance of 14 Nos of Lift Irrigation Schemes along the CBR Right Canal for period from 01/12/2023 to 31/03/2024, Sub Work: Operation & Maintenance of Lift Scheme from CBR Right Canal to Velidandla tank & CBR Right Canal to Thathireddypalli Lift Scheme for the period from date of Agreement to 31/03/2024 in Lingala Mandal of YSR District
Tadipudi Lift Irrigation Scheme Sub-Lift-2- Construction of CM & CD Works from Km 0.000 to Km0.225 on D1, at Km 0.125 on D3, from Km 0.000 to Km0.025 on D4, from Km 0.000 to Km5.398 on D5 of Tadipudi Lift Irrigation Scheme Sub-Lift-II in Yadavolu, Gopalapuram, Komatikunta, Jagannadhapuram villages of Gopalapuram, Devarapalli Mandals of West Godavari District.
Restoration of Check dam across Local vanka near ramapuram (V) in Palamaner (M)
Restoration of CHeck Dam across Local vanka nera Nunevaripalli (V) in Palamner (M)
Construction Check dam across Pilleruvagu near Nemalipuri village in Rajupalem mandal Guntur Dist
Construction of check Dam Across Kale Vagu near P.Gudipadu(V) Korisapadu(m) Prakasam
CONSTRUCTION OF NEW CHECK DAM ACROSS POOTHIKAVALASAGEDDA NEAR POOTHIKAVALASA (V) IN SEETHAMPETA (M)
Restoration to check dam across Thodella vagu near Mundlamur (V) & (M) Prakasam District.
Construction of check dam across pathabavi vagu near ravinuthala v of korisapadu mandal
Formation of Road from Fountain to Check Dam in the premises of Lowbhavi
Construction of Check dam across Nallavagu near Nagulapadu (V) Addanki (M) Prakasam Dist
Construction of check dam across Chilakaleru near Vemulabanda (V) Mundlamuru (M) Prakasam Dist
Construction of Check dam across Peddavanka near Ourvay (V), Nallacheruvu (M), Anantapuramu Dist.
CONSTRUCTION OF NEW CHECK DAM ACROSS POOTHIKAVALASAGEDDA NEAR POOTHIKAVALASA (V) IN SEETHAMPETA (M)
CONSTRUCTION OF CHECK DAM ACROSS VONI GEDDA NEAR SOMAGANDI (V) IN SEETHAMPETA (M)
Construction of Check dam across Guttanarva Vanka near Cheruvandlapalli (V) in Nallacheruvu (M)
Repairs check dam across Bottoni vanka near Alamkonda (V) Krishnagiri (M) Kurnool District.
Construction of Check Dam in yendapalli (V) of Chintalapudi (M) in Eluru District
Repairs check dam across Girigri vanka near Alamkonda (V) Krishnagiri (M) Kurnool District
Construction of new lining in Halvi main minor canal from 690.0m to 810.0m in Halvi Major for optimum use of water of TBP LLC.
Construction of new lining in Halvi main minor canal from 690.0m to 810.0m in Halvi Major for optimum use of water of TBP LLC.
Operation and Maintenance of 14 Nos. of Lift Irrigation Schemes along the CBR Right Canal for the period from the date of Agreement to 31/03/2027.