Strengthening of Existing R/S bank Between K.M 308.400 to K.M 310.200 of TBP LLC Main Canal
Strengthening of Existing R/S bank Between K.M 306.550 to K.M 308.350 of TBP LLC Main Canal
Strengthening of both side canal Banks in between Km 164/000 to 168/000 of RB LLC.
Strengthening the Banks of the KMJ Canal including construction of Bathing ghat at Km 49.600 (3rd call)
Strengthening of Existing R/S bank Between K.M 310.250 to K.M 312.050 of TBP LLC Main Canal
Strengthening of Existing R/S bank Between K.M 312.100 to K.M 313.900 of TBP LLC Main Canal
Strengthening of existing L/S bank between KM 311.950 to KM 313.270 of TBP LLC Main Canal
Construction of storm water drain from Church to KP Canal in ward 06 of Vuyyuru Nagara Panchayat
Hiring of private vehicles for patrolling all along the power canal from July 2018 to March 2018
Arresting structural leakages in various structures on raiwada canal at different chainage points from 17.900Kms to 57.000Kms
Removal of nachu and weed growth from canal bed in identified reaches in Gududur section of RBLLC
S.P.BPRC-NCP- Improvements to the Canal in between K.M. 0.525 and K.M. 0.620 of Brahamanakraka major Distributory.
Removal of weed growth on KMJ canal and its Distributaries for Khariff and Rabi in Jangannadhagiri section
Providing G.I. Link Mesh Fencing to Ryves Canal side near Kothavanthena Bridge in 43rd Division.Rc.E11-142740/2018
Removal of weed growth on Coringa canal and its Distributories for Khariff and Rabi in Jagannadhagiri Section
Removal of Weed from Pampa Main Canal at 0.00 Km to 7.70 Km in Annavaram & Gopalapatnam villages.
Construction of temporary Pipe Culvert for Nidigallu - Pinnadari Road at Km.107.500 of of PABR Right Canal
Providing improvement at Sri Kotesathemma Ammavari temple & Amenities at Nidadavole Canal at Nidadavole in West Godavari District
Engaging of Graduate Engineers on YLM canal and at Kateru pump house for the year 2018-19
Strengthening of Existing R/S bank Between K.M 310.250 to K.M 312.050 of TBP LLC Main Canal
Repairs and Construction of CC walls at km 17.984 to the 20L sluice of main KC canal.
Construction of Pipe culverts of field channels on 113L Branch canal near Maddur Village of Pamulapadu Mandal.
Strengthening of Existing R/S bank Between K.M 312.100 to K.M 313.900 of TBP LLC Main Canal
Repairs and painting works to Eluru and Ryves Canal bridges railings and foot paths in 1st Division
Urgent Repairs to the inspection path along raiwada canal at various place from 0.00 Kms to 58.43Kms.
Strengthening of existing L/S bank between KM 309.250 to KM 310.570 of TBP LLC Main Canal
Providing Machinery such as Hydraulic Excavator and Tractor on hire basis in Power Canal Section, TB Dam.
Providing Shotcreting to Left Side Slope from KM 78.300 to KM 85.000 KM of T.G.P Main canal
Repairs and strengthening the R/s Bank in b/w Km 0.500 to 1.000 of KC Canal
Providing Shotcreting to Right Side Slope from KM 79.450 to KM 79.650 KM of T.G.P Main canal
Repairs and Construction of CC walls at km 14.754 to the 14L sluice of main KC canal.
Repairs and strengthening the L/s Bank in b/w Km 8.00 to 8.200 of KC Canal.
Permanent Restoration to Flood Damage of PBC Canal Banks at km 25.100 Mallavaram Village and Gollaprolu Mandal
O&M repairs to head walls for Madavevapatnam lower parallel channel on Right Bank of Undi Canal
Providing Shotcreting to Right Side Slope from KM 78.400 to KM 78.600 KM of T.G.P Main canal
Providing Galvanised Link Mesh Fencing to Kalakshetram Bridge on Eluru Canal at Railway Parcel Office (West side)
O&M repairs to masonary on Upper pulleru regulators including shutters at km.20.300 of bandar canal.
Addanki Municipality - Construction of CC Drain from Bhavanasi Canal to Sri Gottipati Ravikumar Colony in 19th Ward
Strengthening of existing L/S bank between KM 311.950 to KM 313.270 of TBP LLC Main Canal
O and M Repairs to Shutters of branches of Commamuru canal from KM 58.000 to KM 65.000
Removal of weed (Shoals) in Branch Channels of Duvvuru Canal in Sangam Mandal of SPSR Nellore District.
Special Repairs to Approach Roads of SLB located at Km 19.400 on Bank canal towards Merlapalem Village
Demolish of existing old damaged dribdge on canal towards west side at Venkateswarpuram in Division no. 54
Desilting in Mylavaram Reservoir North Canal (Lined) from 9.00 Km to 13.00 Km in Y.S.R Kadapa District
Construction of production walls and improvements to canal from Km. 2.800 to Km. 7.000 of Lakshmipalli vanka
Road from Nadipudi Lock to Christian Burrial Ground canal road in Amalapuram(M) Est Rs 283.00 lakhs
Repairs and Construction of CC walls at km 9.277 to the 7L sluice of main KC canal.
Tenali Municipality - Construction of cover slabs over drain to pati canal in 2nd ward of Tenali Municipality
Repairs and Construction of CC walls at km 10.836 to the 8L sluice of main KC canal.
Repairs and strengthening the R/s Bank in b/w Km 4.000 to 4.500 of KC Canal