Loading…
Loading…
13,359 results • Best match
Improvements to Baligattam Major canal of TRP from 6 Km to13 Km near Vemulapudi (V) in Narsipatnam (M) of Visakhapatnam District
Construction of slab culvert crossing on Local vagu of ayacut road under KC canal system near gospadu (V&M) in Kurnool.
Urgent repairs to CM & CD structure of main canal of Pedda Vanka M tank of Hebbatam (V), Holagunda (M), Kurnool District
Resectioning of Canal including Strengthining of Existing R/S banks Vulnerable reaches in Kowthalam Major in Wet-I of TBP LLC
Formation of Inspection road with BT and Construction of Kerb wall from KM101.000 to KM102.700 on left side of S.S.G Canal
Construction of Protection mesh along the KC Canal at Arundathi Nagar beside Royal Garden in 4th Division of Kadapa Municipal Corporation
Providing GSB WMM patches along G&V Canal from Vissakoderu bridge down to FCI turning 8th ward in the Bhimavaram Municipality
O and M Repairs Removal of Jungle, Weed and Silt on Commamuru Canal from KM 107.400 to 112.400 and its distributaries
Providing 160mm dia HDPE Distribution pipe line from Vittanalavari canal road Sri Venkateswara Swamy temple to towards south in 14th ward
Removal of silt in KCC Main Canal at Various Locks near Kanakaiah Kottala village of Jupadu Banglow Mandal in Kurnool District.
Somasila Project-Bezawada Papi Reddy Canal- Construction of Protection walls in between KM.1.350 and KM.1.500 of Kothapalem Major Distributory
Construction of cc drain to Jampani canal from Bose road to Tadikala badi Junction in Tenali Municipality under 13th FC Grant
Providing weed and jungle removal by manual and machinery on YLM Canal, from Km 30.00 to Km 48.00 in Reach-I
Providing Link mesh with protection of Greenary to right side of Bundar canal near Raghavaiah park Bridge 1st Call General Funds
Re-Construction and Construction of S.W drain at Sea Horse and up to SL Canal in ward no.26 (3rd call)
Providing Greenary (Wadeliya) to Bundar canal from Bundar Lakulu Bridge to RTC Depo Bridge on N.H Side 1st Call General Funds
Providing CC Road and Side Drains to Marvadi Temple Street from Canal Road to Sivalayam Street in 39th Division (Corporator Budget)
Removal of Weed from Benda Canal Distributory System Channel in Amalapuram Section for the year 2020-2021 both Khariff & Rabi Crop.
Repairs and Replacements to 500KVA, 11KV/433V Transformer at Adavipalem MI Scheme on Krishna Western canal in Nagayalanka Mandal, Krishna Dt.,
Construction of cc roads at Pati Canal side roads form Adi Andhra School to Yerrabadi in 40th ward under SCSP Grant
Construction of Protection wall from Km.95.960 to Km.96.110 andKm.96.380 to Km.96430 L/S of PABR Right Canal
Providing C.C. Drain from Himalaya Ice Cold Storage to Bethapudi canal in Ward No.17 and 19th under 14th F.C. grant
Construction of side walls on 17 L Sluice in Umapathinagar of Revanur Branch channel of K.C Canal system in Kurnool Dt.
LAYING OF C.C ROAD FROM CANAL BRIDGE MAIN ROAD TO 4-354 (APPALA SWAMI HOUSE) AT TARAKA RAMA NAGAR IN MEDALINE
Strengthening of existing Left side bank of Kurnool Branch Canal in between Km.25.750 to Km.27.090 of TBP LLC Project.
Strengthening of existing Left side bank of Kurnool Branch Canal in between Km.19.550 to Km.21.000 of TBP LLC Project.
O and M repairs to removal of weed, jungle and strengthering of banks to commamuru canal from KM 21.400 to 33.200
O and M Embankment repairs to banks and maintenance of Inspection path of Nizampatnam main canal from Km.50.116 to 50.516
Removal of silt , debris from canal prism in between Km 49/273 to Km 49/700 of Section 1 of Torangallu.
Jungle clearance in outer slopes of canal banks on both sides in between km.151/000 to 168/000 of RBLLC
Construction of RCC Culvert across left side main canal at 9.92KM near new Padirikuppam HW in Karvetinagaram mandal of chittoor district.
Construction of Guide walls to the Upparapalli Channel of KCC Main Canal near Upparapalli(V) in Chennur(M) in Kadapa District.
Providing Cement Concrete Lining for Cross Regulator U/s and D/S and Repairs at Km.78.535 of PABR Right Canal
Providing weed and jungle removal by manual and machinery on YLM Canal, from Km 99.00 to Km 113.30 in Reach-III
Reconstruction of Aqueduct at Km 3.550 of 29L Meghavaram Minor of 25R Distributory of Left Main Canal of B.R.R. Vamsadhara Project
APILIP-PHASE-II-JICA-Modernization of Krishnapuram Reservoir Project and its canal system of Karvetinagar village and mandal of Chittoor district.
Removal of weed grwoth on Samalkot canal in between Km 43.400 to 59.000 during Kharif and Rabi seasons in 2019-20
Strengthening of existing Left side bank of Kurnool Branch Canal in between Km.15.300 to Km.16.620 of TBP LLC Project.
Strengthening of existing Left side bank of Kurnool Branch Canal in between Km.21.100 to Km.22.550 of TBP LLC Project.
Removal of weed growth from Bank canal in between Masakapalli Lock and Tallarevu Lock for Khariff and Rabi in 2020-21
O&M repairs to shutters at east escape on krishna eluru main canal under krishna eluru section in west godavari district
FDR to scoures berms in Km 0/4, Km 4/2 & 7/8 of Yerraguntla - KC Canal road in Kurnool district
Providing HDPE 110mm dia. For unserved areas at By-pass road towards kovada canal road at 38th ward in Bhimavaram Municipality
Providing CC Drain from KC Canal to water tank along the YSR Nagar Main road in Ward No.38 (3rd call)
Construction of RCC drain from D.No. 10/70-20-2-2 to D.No. 10/292 along KC Canal Road in KMC
Construction of Pre-Cast Slabs from Chunduri Petrol Bunk to Pothuraju Canal in Guntur Road in Division No.49 (3rd call)
Hire of Tree Cutting machine and labour , Consultant for Taking Levels of S.L Canal in ward no 39 of zone-IV.
Providing GSB Road from Canal Bridge to Mamidala Somaraju (H) at Chandrampalem (V) of Samalkota(M), Est.Rs.9.10 Lakhs(2nd Call)
Construction of Slab Culvert on Kotanemalipuri Major Canal at Devarampadu Temple of Devarampadu (V) of Rajupalem (M) , Est. Cost . 5.00 Lakhs.
Construction of CC drain at 26th ward canal road from Shaik Baji house to Shaik Mahaboob Subani house in Ponnur Municipality.