Loading…
Loading…
13,361 results • Best match
FDR 10 2025 SP BPRC Temporary Restoration of R s Canal Bank in between Km 4.100 to Km 5.900 of SMD
OM to strengthening and protecting the LB of Undi canal in Bet. Km.57.00 to Km.58.500 in Undi village limits
MGWDS-Protection of Eroded banks of Narasapuram Canal in bet. Km.52.800 to Km.53.000 of Palakollu (V) & (M) in W.G.Dsit.,
MGWDS-Protection of Eroded banks of Narasapuram Canal in bet. Km.52.800 to Km.53.000 of Palakollu (V) & (M) in W.G.Dsit.,
Laying of CC Road from D.No: 1-14-16 towards East at Jampani Canal road in 10th ward of Tenali Municipality
Construction of Protection wall from Km.95.960 to Km.96.110 andKm.96.380 to Km.96430 L/S of PABR Right Canal
Providing Repairs, Paintings and construction of Toilets in existing Dhobi Khana beside Eluru Canal in 34th division in Circle-I area
Providing 160mm dia HDPE Distribution pipe line from Vittanalavari canal road Sri Venkateswara Swamy temple to towards south in 14th ward
OM Repairs to O.T.Sluice of Gorintada Channel on Narasapuram main canal at Km 57.700 in palakollu (M) of West Godavari Districtu
APILIP-Phase-II-JICA-Modernization of Araniar Reservoir Project and its canal system of Pichatur village and mandal of Chittoor district.
Construction of Single Lane Bridge at KM.88.000 on Bantumilli Main Canal in Yadapalli Village of Kruthivennu Mandal of Krishna District
O&M such as repairs to Syphon and Seethampeta channel in the jurisdiction of Krishna Canal Section eluru,west godavari District
Construction of Pipe Culvert on Lomada tank feeding canal at Km 1.950 near Y Kothapalli Village Simhadripuram Mandal of YSR District
Restoration of Irrigation System for effective water regulation including Monitoring and Management on Koderu No.1 branch channel from km 0.00 to km 6.550, Chikkala No.1 branch channel from km 0.00 to km 1.400 & Chikkala No.2 branch channel from km ... of Irrigation Section
Providing Irrigation system for Horticultural and Landscaping works at Rocket Garden area and Parking area in front of Entrance Plaza at Visitors Complex SDSC SHAR
LAYING SAND BAGS ON U/S, D/S AND TOP OF THE FALLING SHUTTERS OF SANGAM ANICUT FROM 1 TO 334 NOS TO HEAD UP OF STORAGE AT SANGAM ANICUT FOR LET OUT THE REQUIRED DISCHARGES TO KAVALI CANAL AND KANUPUR CANAL OF SANGAM MANDAL IN SPSR NELLORE DISTRICT
N.W:Construction of Double Lane Bridge at Km.1.200 on Ryves Canal near Tummalapalli Kalakshetram in Vijayawada, Sub-work: Conducting Surveying & levelling operations and soil investigation for site including preparation of Design & Drawing for ... Ryves Canal near ...
Providing Temporary Lighting arrangements at Chilakaluripet Road from RTC Bus stand to police control room ,Narsaraopet Road from canal to check post,check post to Quarry Road ,ZPH School area and Official Tents,Bus Stand ,NSP Canal bund at Kotappakonda for Mahasivarathri festival from 27.02.2022 to 1.03.2022(3 Days)
Main Work. Construction of Double Lane Bridge at Km.3.700 on Eluru Canal near Satyanarayanapuram in Vijayawada, Sub-work: Conducting Surveying & levelling operations and soil investigation for site including preparation of Design & Drawing for ... Eluru Canal near ...
Protection arrangements on Left side bank of SSG canal from KM 120.800 to KM 121.100 in Varadaiahpalem Mandal and 8A Branch Canal Inspection track from KM 3.575 to KM 4.550 and 4L Major of 8A BC from KM 0.00 to KM 1.525 in B.N Kandriga Mandal in Tirupati district.
Pula Subbaiah Veligonda Project-Excavation of approach channel from reservoir to head regulator Excavation of tunnel from Head regulator to Eastern Main Canal and Formation of approach road to top of NoF dam of Kakarla Gap and head regulator of ... Main Canal of ...
Removing and Replacement of Mylavaram Reservoir North Canal Service Gate with Hoist Platform and Mylavaram Reservoir South Canal Service Gate with Hoist Platform setup for both service and emergency gate of Mylavaram Reservoir and preparation of Designs and Drawings for Mylavaram Reservoir Mechanical items of in YSR Kadapa District
Delineation of TB Board land duly conducting land survey, vetting with Revenue Department, demarcation of boundary and fixing of boundary stones to protect TB Board land of the canal including excavating trenches in No.1 of HLC in Power Canal Section from Km.0/000 to Km.21/300
Construction of High level Bridge across NSP Canal at km 14/10 of Addanki - Santhamaguluru road SW:- Conducting Soil Investigation and Sub soil exploration, Soil testing and pre survey for Construction of High Level Bridge across NSP Canal at Km 14/10 of Addanki - Santhamaguluru road in Bapatla District.
Removing and Replacement of Mylavaram Reservoir North Canal Service Gate with Hoist Platform and Mylavaram Reservoir South Canal Service Gates with Hoist Platform setup for both service and emergency gate of Mylavaram Reservoir and preparation of Designs and Drawings for Mylavaram Reservoir Mechanical items in YSR Kadapa District
Protection arrangements on Left side bank of SSG canal from KM 120.800 to KM 121.100 in Varadaiahpalem Mandal and 8A Branch Canal Inspection track from KM 3.575 to KM 4.550 and 4L Major of 8A BC from KM 0.00 to KM 1.525 in B.N Kandriga Mandal in Tirupati district.
Operation and Maintenance work towards supply of Outsourcing Lascars for Water Regulation period during the season 2026-27 in Madakasira Branch Canal from Km 20.000 to Km 53.300/60.350 including Off-Take sluices along the canal nearby villages of Penukonda constituency and Hindupur constituency in Sri Satya Sai District
Providing Temporary Lighting arrangements at Chilakaluripet Road from RTC Bus stand to police control room ,Narsaraopet Road from canal to check post,check post to Quarry Road ,ZPH School area and Official Tents,Bus Stand ,NSP Canal bund at Kotappakonda for Mahasivarathri festival from 16.02.2023 to 18.02.2023(3 Days).
Construction and commissioning of Lift schemes to lift 12.50 Mcft to feed Mudireddypalli tank from TGP Main canal at Km.120.925 and to feed 23.210 Mcft to feed Thippireddypalli tank (Goderu Cheruvu) from TGP main canal at Km.120.925 in Mydukur Mandal, YSR Kadapa District including O&M
Construction of High level Bridge across NSP Canal at km 14/10 of Addanki - Santhamaguluru road SW:- Conducting Soil Investigation and Sub soil exploration, Soil testing and pre survey for Construction of High Level Bridge across NSP Canal at Km 14/10 of Addanki - Santhamaguluru road in Bapatla District.
Restoration of Canal System including Monitoring and Management by removal of jungle,silt for smooth water regulation during Khariff 2024 on Panguluru Minor,Kotapadu Minor,Janakavaram Minor and Bommanampadu Minor of Paidipadu Major under Addanki ... Branch Canal in ...
Urgent Repairs to Providng approaches to Janampeta Bridge of Polavaram Right main canal at km 9/6-8 in Eluru - Medisettivaripalem road (SH 020) in W.G.Dist. Sub work: Providing RSI to Janampeta Bridge approches of Polavaram right main canal at km 9/6-8 in Eluru - Medisettivaripalem road.
Restoration of Damaged L/S and R/S Embankment for 11R Minor from Chainage KM 2.400 to KM 2.800 and Repairs and Restoration of Block No.28 in between chainage KM 10.500 to KM 12.000 of TGP Major Distributary Block No.28
Restoration of Damaged L/S and R/S Embankment for 11R Minor from Chainage KM 2.400 to KM 2.800 and Repairs and Restoration of Block No.28 in between chainage KM10.500 to KM 12.000 of TGP Major Distributary Block No.28 (2nd call)
Improvements to bathing ramps on Both L/B and R/B of Narasapuram Main Canal from Ullamparru Village to Ayyappa swami Temple in Irrigation Section Palakollu
OM to Desilting of Annayacodu Channel from KM6.700 to KM 10.776 at Pallepalem, Kalavapudi and Modi village limits in the jurisdiction of Irrigation Section, Akividu
Formation of Gravelpath on Pipe No.23 of Vaddilanka Channel from Elamanchili Lanka to Elamanchili Madugu Vilalge in Irrigation Section Siddantham in West Godavari District.
Supply, delivery and laying of PVC pipe lines and fixing of Drip system and sprinklers for irrigation system at Thummalagunta village of Tirupati Rural Mandal
OM to Desilting of Annayacodu Channel from KM6.700 to KM 10.776 at Pallepalem, Kalavapudi and Modi village limits in the jurisdiction of Irrigation Section, Akividu
Construction of CC Outfall drain from Cheruvu to Disneyland Gate (YSR Smrithivanam Road) and Disneyland Gate to existing drain in Railway track road. (Irrigation Grant).
OM Desilting to the Mulaparru branch, laparru channel, siddantham no.2 channel and penumanchali Branch channel in the irrigation section siddantham in west Godavari District
O&M to masonary repairs to Inlet at km.26.349 RB of Yanamadurru drain in Kesavaram village limits in the jurisdiction of Irrigation section Chilakampadu.
OM Desilting of Chinchinada Channel from Km 10.000 to 15.000 and pulapalli channel, Degamarru Channel and branch channel in the Jurisdiction of Irrigation Section Palakollu
OM Desilting to the Mulaparru branch, laparru channel, siddantham no.2 channel and penumanchali Branch channel in the irrigation section siddantham in west Godavari District
Repairs and Renovation to the Section officers quarters located in the premises of Irrigation Division compound in Madanapalle town of Chittoor district (Item no.02)
Construction of CC Outfall drain to North side of Rajiv Nagar main road from UDA Colony main road to Nunna Road (Irrigation Grant)(2nd call).
Formation of Gravelpath on Pipe No.23 of Vaddilanka Channel from Elamanchili Lanka to Elamanchili Madugu Vilalge in Irrigation Section Siddantham in West Godavari District.
O&M to A.M. of Weed Free on All Channel and Branch Channels in the jurisdiction of Irrigation Section, Narasapuram for the year 2019-20
Construction of CC Outfall drain to 80 feet road (North side) from Rajivnagar main road to NSC Bose Nagar DP station (Irrigation Grant).(3rd call)
O&M Repair to the Pipe Culvert on Penumanchili Branch Channel of Siddantam No.2 Channel near Achanta Phora in Irrigation Section, Siddantam in W.G.District