Loading…
Loading…
13,361 results • Best match
Removal of weed from Benda Canal Reach-I KM 48.300 TO 52.180 for both Khariff and Rabi seasons 2024-25-Amalapuram Mandal.
VIWSCO - Construction of Escape for surplus water during floods at tail end of Km 33.60 in water supply canal in Reach-II
Desilting of Main Canal including Dangabhadra branch channel under Vommigedda Anicut Scheme near G.S.Puram (V) in Jiyyammavalasa (M) of Parvathipuram Manyam Districrt
Construction of 300mm CC drains and culvert in Vishnu Nagar from Existing Drain to Kuravanka canal at 31st ward in madanapalle municipality
Strengthing of Flood Banks to super passage at 17.000 Km of Left main Canal near Varkur(V), Kodumur (M), in Kurnool (Dt.)
Providing c.c walls to existing Canal on Bojanam channel near Buchha Raju Fields near Bojanam village of B.Atmakur Mandal in Nandyal District
Removal of weed growth on Bank canal from km 14.500 to 27.000 (for khariff & Rabi seasons 2024-25 ) in Alamuru Section Alamuru.
Construction of Single Lane Bridge at KM 88.000 on Bantumilli Main Canal in Yadapalli Village of Kruthivennu Mandal of Krishna District MPLADS
Providing of chain link mesh fencing at damaged portions along KC canal from Swami Reddy Nagar to Joharapuram in Kurnool Municipal Corporation
FDR-10/2025- Temporary Restoration to Valluru Canal from Km.0.000 to Km.4.200 in Nellore Rural Mandal of SPSR Nellore District.
O and M Essential repairs to Rajupalem Major from km 0 000 to km 12 000 of Bellamkonda Branch Canal of NSJC
Desiltation of existing Drains & Culverts, Removal of Blockages from CMR Shopping Mall to Pothuraju Canal along Guntur Road in Division No.49
Maintenance of Inspection track for effective water regulation on 1R Major of KR Left canal in Podalakur Mandal of SPSR Nellore District.
FDR- Repairs and restoration of inspection track from Ch:0.00 to Ch:2.60 of Ananthasagaram Minor of 13R Major of GKN Canal
Repairs to walls to the canal in between km 0.500 to km 1.000 connecting Duddi Reservoir and Madhavaram Major of TBP LLC
Urgent Repairs to Slab Culvert (1vx1.0M) at km 7/2 of Rajavolu Kondagunturu road via Ava canal road in East Godavari District
Construction of Single Lane Road Bridge at Km.30.165 of Santhakovuru Branch Canal under GKLI Scheme in Thonduru Mandal of Kadapa District
Improvements to canal banks and closing of syphoning points in between km.200.000 to km.204.000 in Holagunda-II section of RBLLC
Construction of Outfall RCC Drain in Service Road end connecting to Bandar Canal,9th Division. (MAUD-10733-29050)1st Call GGMP Funds
Providing Storm Water CC Drain from Venkateswara Swamy Temple to Mogalthur Road via Vemuladeevi Canal East side bund in Ward No.23
Construction of RCC BOX Culvert at 27 th ward Near Kummari canal bund Chinna vantena area starting vegitable shop in Amalapuram Muncipality
Construction of CC Drain from Krishna Rao nagar Road No. 1 to G V Canal in ward No. 01 in Tanuku Municipality
Construction of RCC Drain in Krishnaveni Road E/S from Darsipet Junction to Bundar Canal in 14th Division. (General Funds).10th Call
O&M Repairs to S.G shuttering arrangements to No.3 Escape on L.B of Eluru canal at Km 53.343 in Kurellagudem (V)
Providing additional Off Take Sluice on Bandar canal at Km. 58.89 left side Under Neeru Chettu, Under P.C Movva Mandalam Krishna District
Road from Narasaraopeta - Vinukonda R&B to Peda Turakapalem (R.T.O. Office) along NSP Canal of Narasaraopet Mandal, Estimate Cost Rs.150.00 lakhs
Providing Decorative Lighting to Green Belt North Side of Bandar Canal from Nethaji Bridge to Ayappa Swamy Temple (Anna Canteen) on NH
Providing Inspection road with B.T. for the balance reaches from K.m. 118.000 to K.m. 120.800 on left side bank of S.S.G. Canal
SP-BPRC-NCP-Protection works to canal on upstream side and downstream side of Aquiduct at KM 6.200 of Somavarappadu Major Distributory.
SP-BPRC-NCP-Improvements to the inspection path from KM 0.000 to KM 0.750 of Sri Venkateswarapalem Major Distributory of Kavali Canal.
Improvements at 23rd Distributory from Km 0.000 to Km 0.135 and from km 1.200 to km 1.600 of M P South canal
Repairs and strengthening the Left side Bank from Km.91.000 to 93.200 of K.C Canal under Pagidyala Mandal under Neeru Chettu Programme
Construction of Single Lane Bridge (SLB) at km 82.50 near Vamulapudi village in Reach - II of Yeleru Left Main Canal in VIWSCO
Removal of shoals and silt at various locations from the chainage of 14.00 KM to 38.700 KM of Raiwada canal of GVMC
Removal of shoals and silt at various locations from the chainage of 39.200 KM to 58.430 KM of Raiwada canal of GVMC
Estimate for Cost of Diesel Oil for lifting of water from drains/canals for supplementation to the standing crop for Rabi 2021-22 to the ayacut of Pallamkurru No.2 channel system from Mokkala thippa minor drain and Pallamkurru drain cheekurimilli vari peta and dasarivari peta village limits
Main Work. Construction of Double lane Bridge at Km. 1.200 on Eluru Canal near Tummalapalli Kalakshetram in Vijayawada. Sub Work. Conducting Survey & Levelling operation and soil investigation for site including preparation of Design & Drawing for ... Eluru canal near ...
Laying of sand bags on U/s, D/s and top of the falling shutters of Sangam Anicut from 1 to 334 Nos to Head up of Storage at Sangam Anicut for let out the required Discharges to Kavali canal and Kanupuru Canal of Sangam Mandal of SPSR Nellore District
Laying of sand bags on U/s, D/s and top of the falling shutters of Sangam Anicut from 1 to 334 Nos to Head up of Storage at Sangam Anicut for let out the required Discharges to Kavali canal and Kanupuru Canal of Sangam Mandal of SPSR Nellore District
Supply of Man Mazdoor labour for Watch and Ward of Subsidiary Reservoir No.1 and skilled operators for the maintainance of Chennamukkapalli Canal Head Regulator at Bund A of Subsidiary Reservoir No.1 of NTR TGP Main Canal in Duvvuru Mandal of YSR Kadapa District for the Year 2023-24
Construction and Commissioning of Lift schemes to lift 12.50 mcft to feed Mudhireddy Palli tank from TGP main canal at Km 120.925 and to lift 23.210 mcft to feed Thippireddy Palli tank(Goderu cheruvu) from TGP main canal at Km 120.925 in Mydukur Mandal, YSR Kadapa District including O&M
Relocation of existing 1.5KM 11KV Dosaludiki feeder and 0.5KM 11KV Moosam feeder passing along/across the HNSS canal due to widening of canal in between Aluru to Kasapuram(V) in Guntakal Rural Operation section of Guntakal sub-division in Gooty division of Anantapuramu circle(T-0925-07-02-44-03-002)
Construction and Commissioning of Lift schemes to lift 12.50 mcft to feed Mudhireddy Palli tank from TGP main canal at Km 120.925 and to lift 23.210 mcft to feed Thippireddy Palli tank(Goderu cheruvu) from TGP main canal at Km 120.925 in Mydukur Mandal, YSR Kadapa District including O&M
Supply of Man Mazdoor labour for Watch and Ward of Subsidiary Reservoir No.1 and skilled operators for the maintenance of Chennamukkapalli Canal Head Regulator at Bund A of Subsidiary Reservoir No 1 of NTR TGP Main Canal in Duvvuru Mandal of YSR Kadapa District for the Year 2024 to 2025
Providing Rcc Jollies and M.s Iron Gates for Budameru canal Bund at devinagar in circle 2 area. Rc.E3.PD3(Parks)-100212/2026 (6th Call)
Improvements and restoration of theoritical profile for effective water regulation in Eluru canal from Km.28.200 to 32.00 in irrigation Section, Tadepalligudem For the year 2026-27.
Improvements and restoration of theoritical profile for effective water regulation in Eluru canal from Km.24.000 to 28.000 in irrigation section,Tadepalligudem For the year 2026-27
Improvements to Irrigation System of Trough on M.D.3 Canal of Subbareddy Sagar Project at Km 1.10 Near Peddipalem Village Limits in Prathipadu Mandal in Kakinada District.
Improvements and restoration of theoretical profile for effective water regulation in Eluru canal from Km.24.000 to 28.000 in irrigation section,Tadepalligudem For the year 2026-27
Improvements and restoration of theoretical profile for effective water regulation in Eluru canal from Km.28.200 to 32.00 in irrigation section,Tadepalligudem For the year 2026-27