Loading…
Loading…
13,361 results • Best match
Providing Greenery and linked mesh to the canal bund by the side of Ambedkar Bhavan (Assistance to AP study circle funds) (3rd call).
O&M-Renovation of Inspection path on Attili canal Right Bank in bet km.27.200 to 28.300 in Mandapaka(V) Tanuku (M) W.G.District
De-silting of Main Canal from KM 18.000 to KM 23.850 of Sri K.V.Rama Krishna (Suramapalem) Reservoir Project, East Godavari District, 2nd call
Removal of Weed Growth from Yeleru Main Canal, Gurrakanam Calva & Jammidoddi Calva in the Jurisdiction of Peddapuram Mandal for the Year 2021-22.
FDR 10/20225 SP BPRC Temporary Restoration of L/s Canal Bank in between Km 0.000 to Km 0.900 of Somavarappadu Minor (6RA)
Embankment repairs on left bank of Bantumilli main canal from KM 63.000 to KM 66.000 under Cowtharam section for the year 2021-22
Construction of Bridge across Peta Canal near Rajiv Gandhi College in Ramanayyapeta of Kakinada Rural in Kakinada District.Est.Cost.Rs.130.00 lakhs in 1st call.
Removal of weed (water Hyacinth) of Thikkavarapadu Branch Canal from km. 0.00 to Km. 3.900 in Nellore Rural Mandal of SPSR Nellore District.
Providing GI link mesh fencing to BRTS road along Ryvas Canal bund from Madhura Nagar Sivalayam Bridge to Padavalarevu in Works Division-II
Providing 315mm dia hdpe pipeline for filling of water to yerra cheruvu through nsp canal at pedapalakuluru div.no.40 under AE-08 section
Strengthening of Canal banks by providing additional berms in between Km 57.950 to Km 58.150 and Km 59.350 to Km 59.550 of RBHLC.
PROVIDING 250 KVA CAPACITY DIESEL GENERATOR FOR RUNNING MOTORS AT SAMALKOTA CANAL ON HIRE BASIS OF KAKINADA MUNICIPAL CORPORATION SUMMER ACTION PLAN 2023.
Removal of Silt sediments in Gooty Sub Branch Canal from chainage 2.190 KM to 2.670 KM at Head Water Works of Guntakal Municipality
Desilting in Right Main Canal of B.R.R. Vamsadhara Project in between Km 0.000 to Km 1.800 in Kondaragolu Gram panchayat of Hiramandalam Mandal
Engaging Lascars on outsourcing from Km 26.700 to KM 96.700 of Mid Pennar south Canal for Water regulation Period during year 2020-2021
Restoration to 10 th Distrubutory in Right Main Canal from km: 0.4 of Sanjeevaiah Sagar (Gajuladinne) Project in Gonegandla (M) in Kurnool District
Removal of weed growth on Bank canal from km 14.500 to 27.000 for khariff & rabi seasons 2023-24 in Alamuru section 2nd call
Repairs and Restoration of Retaining Walls to Right Bank of Commamuru Canal at Up Stream of Nose Gauge in Duggirala of Guntur District
FDR -Estimate for Repairs and Restoration Dividing Dam at km 8.749 on kachavaram main canal Of Balusupadu(V), Jaggaiahpeta (M) in NTR Dist.
Repairs and Restoration of Retaining wall at D S of K W Bank Canal Head Sluice at Revendrapadu in Duggirala of Guntur District
Temporary Restroration of Tank bund, Canal Network, Inflow Channels and Surplus Courses for Village Tank of Basavapuram Village of Mundlamuru Mandal Prakasam District
Removal of Weed growth From Kakinada Main Canal Between Km 15.200 to 25.480 Km during Khariff and Rabi 2024-25 of Tossipudi Section.
O & M head regulator gates at Jeedipalli Reservoir at Km 216.300 of HNSS Project Phase II Main canal for the year 2022-2023
Embankment repairs on left bank of Bantumilli main canal from KM 63.000 to KM 66.000 under Cowtharam section for the year 2021-22
Embankment repairs on right bank of Bantumilli main canal from KM 63.000 to KM 66.000 under Cowtharam section for the year 2021-22
Providing CC Road and CC Drain from Ram Gangadharam gari house to Canal Road in Gandhi Nagar in 7th ward in Bhimavaram Municipality
Desilting in Right Main Canal of B.R.R. Vamsadhara Project in between Km 0.000 to Km 1.800 in Kondaragolu Gram panchayat of Hiramandalam Mandal
Removal of Silt & Jammu from Km.14.100 to Km.20.000 of SKD Canal under GKLI Scheme in Simhadripuram (M) of YSR Kadapa District
RESTORATION TO R/S BANK OF SSG CANAL FROM KM 126.730 TO KM 126.760 NEAR MG NAGAR ST COLONY IN VARADAIAH PALEM MANDAL
Removal of weed growth from Lingamparthi main canal, Yeleswaram main channel and its Distributory channels of Timmaraju tank in Yeleswaram Mandal, Kakinada Dist.
Removal of Silt & Jammu from Km.6.100 to Km.14.000 of SKD Canal under GKLI Scheme in Simhadripuram (M) of YSR Kadapa District
Removing of excess Bund and Desilting of Pothuraju Canal from Guntur Road to Papa Colony Foot Bridge north side in Ongole Municipal Corporation
Clearing of Thin jungle, Removal of Jammu and removal of silt in 15R Major of Left Main Canal of KOR Gundlakamma Reservoir project.
Construction of outfall Storm water CC Drain in Kakathiya Road End Connecting to Bundar Canal in new 12th Division.1st Call General Funds
Construction of Raw Water Pump Shed at Rivas Canal Side of Tarakaturu SS Tank in Machilipatnam Municipal Corporation under 14th Finance Commission Grant
STRATEGIC PREPAREDNESS FOR CYCLONE/ MONSOON IMPACT AND FLOOD PREVENTION ONNTR TGP MAIN CANAL IN MYDUKUR CONSTITUENCY, YSR KADAPA (Dist) FOR THE YEAR -2024.
(2nd Call) Providing of CC Road from Galliya Prayer Ministries to fish Market along Canal Bund in Yanamalakuduru Circle of YSR Tadigadapa Municipality.
Repair and restoration of trough aquiduct at km. 4.000 on kanupur main canal near viruvuru village in podalakur mandal of SPSR Nellore District.
Providing pumping main from NSP canal to SS tank in Pedanandipadu Village & Mandal of Guntur District (Part-B), Est. Cost Rs. 23.94 Lakhs
Repairs to Banks and canal lining between KM 1.770 and KM 2.000 for Gollaguruvayya Kaluva of Paleru Tank Distributory of Owk Reservoir Complex.
O&M Removal of weed growth in Ryves Canal branches and its allied works in Ventrapragada Section for the year of 2023-2024.
Improvements and strengthening of the Polavaram Project Right Main Canal to strengthen the banks from Km 7.00 to Km 14.806 of package-1
Item No.7 - Strengthening of Load Berms of Canal Banks from KM 33.700 to KM 35.120 on NSJC near Syamarajapuram (V), Durgi (M)
Construction of On Farm Development works under structural intervention of CADWM for High Level Canal of KOR Gundlakamma Reservoir Project in Prakasam District
Rapid Filling arrangements for filling with Canal water to Old and New SS tanks in Chilakaluripet Municipality (for the month of August 2020)
Silt removal, improvements to structure and laying of vulnerable reaches (wherever laying is disturbed) of Raiwada Canal from 15.000 Km to 20.000 Km.
Construction of Double Lane Bridge over Survepalli Canal at Thummala Katta Sangam in Division No.15 in Nellore Twon of SPSR Nellore District
SUPPLY AND DELIVERY AND FIXING OF 90WATT, 100WATT, 120WATT LED STREET LIGHTS FOR ONE SIDE LIGHTINGS FROM YETTIMOGA CANAL ROAD IN 16TH DIVISION.
Erection of 11 Mtrs and 9.10 Mts Poles from Devuni Kadapa Sub Station to Ayesha School along KC Canal in Kadapa Municipal Corporation
Protection works to eroded banks by construction of cattle ramp on G.E., Bank canal on D/S of Sub Division Office (2nd call)