Loading…
Loading…
13,362 results • Best match
Providing Decorative Lighting to Green Belt North Side of Bandar Canal from Ragavayya Park Bridge to Foot Bridge on NH 2nd Call General Funds
Construction of Galvalume Roofed Shed to perform Rituals of deceased at G&V Canal Bund in Sivalayam Road in 28th ward in Tanuku Municipality
Repairs to breached portion of main canal in between km 17.260 to km 17.360 at Timmapuram village Maddigedda Reservoir Project Addategala in E.G Dist.
Construction of Galvalume Roofed Shed to perform Rituals of deceased at G&V Canal Bund in Sivalayam Road in 28th ward in Tanuku Municipality
Providing Greenery (Wadeliya) to Bundar canal from American Hospital Bridge to Raghavaiah park Bridge south side (Ch.970m to 1210m) General Funds 1st Call
Providing PVC coated Link Mesh Fencing to Canal berm, mee-seva side at Kothavanthena Bridge near lotus land mark in Kedhareswarpeta of 50th Division.
Protection works to eroded banks by construction of bathing ghat and walls on LHS bank of GE Bank canal near Old Dangeru OT sluice
Formation of CC Roads cum drains in Expats colony of Gannavaram Airport expansion near Eluru Canal China Avutapalli (V), Est.Rs. 1500.00 lakhs (2nd call)
Laying of CC Road from Kunta Surplus to Canal in Ankalammaguduru Village in Simhadripuram Mandal in YSR Kadapa District, Est. cost Rs.19.00 Lakhs.
Arresting leaks and breaches on Raiwada Link Canal in Reach-I to IV i.e., from 0.00km Devarapalli to 58.43km Narava Filtration Plant of GVMC.
Providing CC Drain from Kummari Canal to Smt Rayudu Nagaratnam house D.No-1-5-75 in Diguva savaram at 28th ward in Amalapuram Muncipality
Providing PVC coated Link Mesh Fencing to Canal berm, mee-seva side at Kothavanthena Bridge near lotus land mark in Kedhareswarpeta of 50th Division.
Supply of work inspectors for YLM canal monitoring and computer operator for VIWSCO Engineers at Office of GM, VIWSCO for the year 2018-19.
Providing 2 Nos of Long Arm Excavators to Biologist for removal of debris, pistia and cleaning in Budameru canal. (Rc.V1-109945/2026) 2nd call
Removal of weed growth main canal and its distrubutories WUA Muramanda limits for Khariff and Rabi seasons 2023 24 of Tapeswaram section 2nd call
Providing C.C Walls in place of existing Nadi kalva of MLA sluice of K.C.Main Canal near Chiyyapadu(V) in Chapadu (M) of Kadapa Dt.
Providing CC drain from Km 21.80 to SP Km 22.446, and fixing of HDPE Pipe for crossing of Water supply canal in Reach-III
Laying of CC Road from Kunta Surplus to Canal in Ankalammagudur Village in Simhadripuram Mandal in YSR Kadapa District, Est. cost Rs.19.00 Lakhs.
Desilting of out fall Drain on both side of Donka Road from Bandar Road to Bandar canal in 13th Division. 3rd Call General Funds
PROVIDING CROSS BUND AT ARATLAKKATTA LOW LEVEL CANAL OFFTAKE POINT FOR FILLING OF SS TANK OF KAKINADA MUNICIPAL CORPORATION UNDER SUMMER ACTION PLAN-2025.
Modernisation to Godavari Central Delta - Improvements of bank canal from Km.22.10 to Km 47.100 and Vilasa channel system including CM and CD works
Laying and Widening of CC Road From Vijaya Milk Shop to main road (Opp Green Park bar) along K.C canal in Ward No.24.
Construction of Protection walls for L/s of 141R sluice from Km 0.240 to 0.315 Km of K C main canal at km 171.750.
O&M to maintenance of Inspection path on Kakaraparru Canal R/B from Km.12.510 to Km.13.131 in the jurisdiction of Peravali Section
Construction of CC drain from Masid to Pulleru canal (via) Malli baddi & Devaiah house in 3rd ward opp of Sai mahal in Vuyyuru NP.
Construction of Protection walls for L/s of 141R sluice from Km 0.160 to 0.235 Km of K C main canal at km 171.750.
AME of providing private security in between Km.0/000 to Km.21/300 of Power Canal for the year 2020-2021 (12 Months)
Desilting work to 2nd Branch channel and 4th Branch channel of NLS Canal in Kambara & Dasumantha puram villages of Veeraghattam mandal of Srikakulam District
Construction of Protection walls for R/s of 141R sluice from Km 0.240 to 0.315 Km of K C main canal at km 171.750.
Construction of Protection walls for R/s of 141R sluice from Km 0.320 to 0.395 Km of K C main canal at km 171.750.
Construction of Protection walls for R/s of 141R sluice from Km 0.400 to 0.475 Km of K C main canal at km 171.750.
Construction of Protection walls for R/s of 141R sluice from Km 0.400 to 0.475 Km of K C main canal at km 171.750.
O&M Removal of Tape grass from the bed of junction canal, Mid-level channel & branches and low level channel for the fasali 1431.
FDR 12/2025 - Repairs & Restoration of R/S of SSLC Canal Bund between Km 83.280 to Km 83.300 in Srikalahasthi Mandal of Tirupati District.
Desilting to right main canal of Madduvalasa Reservoir Project from Km 32.500 to Km 34.400 near Talatampara(V) of Santhakaviti(M) in Vizianagaram Dist
O & M Such as annual weed free maintenance on Polraj Main Canal under the jurisdiction of Mudinepalli & Vinjaram sections for the year 2023-2024
O & M - Removal of Weed growth in Bandar Canal in between Km 59.100 to Km 69.200 and it's Distributories for the year 2023-2024
O and M removal of weed growth on Munnangi channel, Chivaluru channel, Thumuluru channel, Davuluru channel, Polimera branch channel and branches of K.W.Bank canal
Re sectioning of Canal including strengthening of existing banks in vanuarable reaches in Between K.M 6.000 to K.M 9.500of MLSP Major of TBPLLC Project
Construction of new Single Lane Bridge at Km.128.900 on Nagarjuna Sagar Jawahar Canal at Nehru Nagar Thandda in Bollapalli (M) of Guntur District.
Protecting the R/B of Samalkot canal up to gravel formation level including construction of cattle ramps between km 43.200 to 48.000 (2nd call)
Repair to Pipe Culverts on fileds to R B Channel ayacut road of KC canal system near Revanur (V) of Koilakunta (M) in Kurnool.Dt.
Construction of Pipe Sluice from Bandar Canal to East Side Channel near Tarakaturu SS Tank in Machilipatnam Municipal Corporation under 14th Finance Commission Grant
Improvements to L/S Bank on Harivaram supply channel at K.M 8.500 to 10.000 nearKampamallametta(V) Uyyalawada(M) Kurnool(Dt) under KCC main canal
Removal of weed growth on Kakinada canal from Km 25.600 to Km 33.000 under WR Section, Tossipudi during Khariff & Rabi Seasons in 2020-21
Engaging lascars on outsourcing from Km.0.000 to Km.34.450 of Dharmavaram Branch Canal for water regulation period for the water year 2020-2021
De-silting of YLM canal from Km 68.60 to Km 69.00 with dredge pump set having floater platform in deep cut in Reach-I
Improvements to canal bank in between km. 0.000 to km. 0.090 on no.11/1 Venkatapuram Branch channel in Mopidevi Mandal in Krishna District.
Formation of quarry rubbish for filling up of pot holes on approch road for new compost yard along Kowsika canal bund in Amalapuram Municipality
O&M Removal of weed on Nizampatnam canal from km 32.186 to 43.874 and Edlapalli channel from km 0.00 to 10.700 in Kuchipudi Section.