Loading…
Loading…
13,362 results • Best match
Removal of silt (Obstructions) from the bed of Kanupur Main Canal from Km 4.550 to Km 8.500 in Podalakur Mandal of SPSR Nellore District
Resectioning of Canal including strengthening of existing banks in vanuarable reaches in Between K.M 1.600 to K.M 3.500 of G.Singavaram Distributory of TBPLLC Project
NUDA - Construction of Balance 60 ft CC Roads and restoration of UGD networkincluding site levelling nearby existing canal towards east side Kavali MIG layout
Improvements and Repairs to structures at Km 0.350 and at Km 1.200 in 4th Distributor of MP North Canal for the year 2020-21
O&M of Head regulator gates at Jeedipalli Reservoir at Km 216.300 of HNSS Project Phase II Main Canal for the year 2022-2023.
Providing protection arrangements with RCC Retaining wall on canal side to the tower Loc.No.17/3 of 132KV Alipiri LILO Line in Chittoor dt.
Darsi Nagara Panchayat General Funds 2022 23 Construction of Culvert Slabs at Different Places on NSP Canal in 9th Ward of Darsi Nagara Panchayat
Supply, Fabrication, Erection, testing and Commissioning including all embedded parts of Service Gate and Emergency Gate of Right Main Canal Sluice of Pincha Project
Removal of weed growth from Upparakhandi Canal and its offtake channels under W.U.A No.25 Gollaprolu during the Year 2022-23 for Rabi Crop
Flood protection works to Left side bank at K.m 64.000 to 64.400 near collapsed wall of Main K.C Canal near Satanikota(V) Nandikotkur (M).
Essential Repairs and Rectifications to Gates of Off take Regulator to Bypass Canal at Km 56.700 in Panyam Mandal, Panyam Constituency of Nandyal District
Construction of Guide walls between existing drop and S.P at KM 9.100 and 10.200 of Major in Block No.19 of TGP Main Canal.
Providing c.c walls to existing Canal near FC near Maheswara Reddy feild of Noonepalle supply channel near Kuluru (V) Gosupadu(M) in Nandyal (Dt).
Maintanance of water supply - Supply and Delivery of 2 nos of Change over switches and control panel boards at KP canal in Srikalahasti Municipality
Removal of weed from canal bed of Chowkicherla TSC, Tank sluice channels, Vavilla TSC and sluice channels in Vidavaluru (M) of SPSR Nellore Dt.
Cleaning and desilting of Lomada Channel which feeds Lomada Tank from SKD Major Canal b/w km.0.000 to km.1.250 under GKLI Scheme
Providing G.I Chain Link mesh fencing to Skew Bridge (West Side) both side walls on Bandar Canal at 16th division.1st Call General Funds
Strengthening of Right Side Bank of Left Main Canal from Km 13.000 to 14.000 Km of Gajuladinne Project in Gonegandla (m) of Kurnool District
Construction of Parapet Wall to Culvert on Venganna Canal near Sree Mahalakshmi Temple in Golagamudi Road in Division No.20 of Nellore Municipal Corporation
Clearing of Jungle on Ongole Branch Canal,Throvagunta Major Chillakapadu Major and Chimakurthy Major-2 under NSJC O&M Division Chimakurthy in Prakasam District
Providing C.C Walls to the existing damaged lining at Km 299.800 of kcc main canal near Upparapalli (V) in Chennur mandal of Kadapa (Dist)
Providing DWF through 100Percentage FHTCs to Ryves Canal Bund habitation of Nidamanuru Village in Vijayawada Rural Mandal in NTR District, Est Rs.13.30 lakhs
Flood Damage Repairs on L/S Bank at 6.200 KM of Kamalapuram Link Channel under MR South Canal under Mylavaram Reservoir of Kadapa Dist
Construction of CC road from Gavireddi Nookaraju house to PWD canal via Koruprolu Govind house in Ward No.18 of Narsipatnam Municipality(1st Call)
O&M to maintenance of Inspection path on Kakaraparru Canal R/B from Km.12.510 to Km.13.131 in the jurisdiction of Peravali Section
Balance Earth work Excavation and Construction of Drops and O.T Sluices on 44 L Major distributory system on Right Main canal of S.K.K.Y.R Project
Providing Decorative Lighting to Green Belt North Side of Bandar Canal from Ragavayya Park Bridge to Foot Bridge on NH 1st Call General Funds
Removal of silt in canal bed identified reaches and repairs to DP shutters in Chintakunta section in between km 121.00 ti 135.00 of RBLLC
Hiring of Private vehicles for patrolling all along the canal from km 72.000 to km 105.4350 of RBHLC from July 2018 to January 2019
providing FHTCs in Ryvas canal bund habitation of Nidamanuru village(by utilising existing infrastructure and retrofitting/augmentation) in vijayawada rural mandal in krishna district
Construction of bridge across Attili canal on the road from Velivennu to Nandamuru Aquiduct at Velivennu of Nidadavole Constituency, Est Cost Rs 400.00 Lakhs
Road from KM 6/2 of Katrenikona R & B road to Bank canal via Komati Cheruvu in Ainapuram of Mummidivaram mandal,Est.Rs.62.00 lakhs
O&M repairs to S.G.Arrangements to No. 4 Escapes and O.T.Sluices on Eluru Canal from Km.53.343 to 73.072 for the year 2019-20
Reconstruction of RCC Through Aqueduct Across Cheepigedda on Jagadeibatti to Kalingadala Left Main Canal system near Bellupatia (V) in Mandasa (M) of Srikakulam District
Construction and Beautification of Median Island for tree in Hands Sculpture near T Junction, K.C Canal (Airport Road) of Alamkhanpalli, in Kadapa Municipal Corporation
Repairs and replacement of shutters to Anacoderu Channel system, Undi Canal system and right bank of Yanamadurru Drain inlet @ Km.36.000 in the jurisdiction of Irrigation Section Yendagandi, Bhimavaram
Strengthening of canal bank of munusubugari bridge to chinchinada village road on Kaza branch channel in chinchinada village limits in Elamanchili mandalam in the jurisdiction of Irrigation section, Sidhantham.
HNSSPROJECT Phase II Package No 55 Madakasira Branch canal Flood damage work FDR Temporary Restoratin of breached canal at 1 Left side Bank at Km 88 110 near Kotipi village 2 Left side Bank at Km 100 75 3 Right sideBank at Km 100 800 near Pochanapalli village, Hindupur mandal of Ananthapuramu district of A.P
Providing watch and ward water regulation to the SSG Main Canal from Km. 10.000 to Km. 47.100 TGP Division, Rapur for the year 2016-17. Sub work:- Security persons/ Watch and ward persons to the O.T Sluices and Escapes all along the canal from Km. 10.000 to Km. 47.100. (12/2016 to 03/2017)
Clearing of Weed removal & Desilting from canal bed on canal banks of Sanagapadu Major - 2 , 38L , 39L , 40R , 43R Minors of Sanagapadu Major - 2 , 2R, 3L, 8R, 11L, 12R, 14R Minors of Nawabpeta Major - 1 , 1L, 2R, 4R, 6L, 7R, 8L, 9R, 10L Minors of Nawabpeta Major - 2 ,Pochampalli Major-1 & 2 and Bandipalem Major.
Delineation of TB Board land duly conducting land survey, vetting with Revenue Department, demarcation of boundary and fixing of boundary stones to protect TB Board land of the canal including excavating trenches in HLC No.1 Section from Km 0.000 to ... Power Canal Section ...
Arresting leaks of UT side walls of Km 3.50 by plastering the side walls and providing lining for the damaged portion & existing retaining wall at Km 4.50 by grouting and guniting retaining walls in Link Canal & Removal of shoals and silt in link ... link canal various ...
Delineation of TB Board land duly conducting land survey, vetting with Revenue Department, demarcation of boundary and fixing of boundary stones to protect TB Board land of the canal including excavating trenches in HLC No.1 Section from Km 0.000 to ... Power Canal Section ...
Prov Temp Lighting arrangements at Kotappakonda for Chilakaluripeta Road from Police control Room to RTC Busstand for Narsaraopeta Road from Police control Room to NSP canal checkpost to Road ZPH school area official tents busstand NSP canal bund Giri pradikshana and other places at Kotappakonda for Mhasivarathri festival from 24.02.2025 to 26.02.2025 3 days
Providing Crash barrier,painting & studs at week & narrow irrigation canal at Km.2/4-6 of MT road Munnelli road "Under the main work of Pkg(a) SR to road from Km.0/0-11/0 of MNBB road to Brahmanapalli road (b) SR to road from Km.0/0-4/0 of MT road to Munnelli road (c) SR to road from Km.0/0 to 5/0 of Konarajupalli to Muttukur road in YSR District
Construction of CC Drain from D.no.10/336 to EP NO G7/4 (Nagulbavi Sr. area), from EP NO G7/20 to D.no. 10/444 (at nagulbavu st Ramalayam), From D.no. 10/444 to 10/286, At nagulbavi St, Ramalayama Temple (Front Side) (near Ep.no: G7/19) and ... Katta) irrigation Canal at ...
O&M to Strengthening and Formation of Berm and embankment on Yanamadurru Drain L/B in between km.5.800 to 5.950 under the jurisdiction of Irrigation Section, Mandapaka
Restoration of Irrigation system for effective water regulation of Eastern Channel from D/S of 4th Drop to 8th Mile Drop in Kodavalur (M) of SPSR Nellore Dt
O&M Repairs to Inspection Path on Rapaka Channel in between KM 6.00 to 8.00 in Kakileru and Koyyetipadu (V) limits in the Jurisdiction of Irrigation Section, Marteru.
Development of VUDA Park in Ward No. 18 including civil works, Landscaping, Play Equipment, Electrical, Irrigation Works etc. to complete at Visakhapatnam under Smart Cities Mission (2nd Call)