Loading…
Loading…
13,358 results • Best match
Reconstruction of collapsed compound wall at Zoo Hospital back side near check dam in SVZP, Tirupati during 2021-22
FDR to Check Dam across Velpucherla vanka M. Eswar Reddy fields in Rajaguruvayapalli village in Muddanur Mandal YSR District.
Construction of Check dam across Yeddulanna Kunta vanka near Ankavaripalli(V) in Lingala (M) of YSR District Kadapa district
Construction of Check dam across Neelavari Kona Vanka near Jangamreddy palli (V) in Simhadripuram (M) of YSR Kadapa District
Construction of Check dam across Kachiva Chan adda vanka near Ippatla (V) in Lingala (M) of YSR Kadapa district
Repairs to Check Dam across Palar river at Km.5.450 near Kollupalli (V) in Ramakuppam (M) of Chittoor District.
FDR Restoration of Check Dam side banks near Ananathapadmanabha Puram of Akkurthy village in Srikalahasti Mandal of Tirupati District.
Construction of Check Dam No.2 in Compt.No.211,Bandirevu RF., Bandirevu(South) Beat, Nellipaka Range of Chintur Division
Repairs to Check Dam across Palar river at Km.15.500 near Mandegownioddu (V) in Shanthipuram (M) of Chittoor District
Repairs to Check dam across Thopu vanka near Bevanapalli H/o C.Bandapalli (V) in Santhipuram (M) of Chittoor Dist.,
Construction of Check dam across Chinnagutta Kalava near Kannikapuram(v) in Palasamudram Mandal of Chittoor District. (Item No.03)
Reconstruction of Check Dam across Palar River at Km 11.430 near Sivaiahoddu (V) in Santhipuram (M) of Chittoor District.
Construction of Check Dam at South side of Sandu chenu near Alireddypalli village of Vempalli Mandal of YSR District.
Construction of Check Dam across Gangamma vanka beside Rajanikanth fields near Badrampalli village of Thondur Mandal of YSR District.
Construction of check dam across Chinna vanka near Vivekananda Reddy fields near Kadapanagayapalli village Simhadripuram Mandal of YSR District.
Construction of Check Dam No.2 in Compt.No.211,Bandirevu RF., Bandirevu(South) Beat, Nellipaka Range of Chintur Division
Reconstruction of Check Dam across Palar River at Km 11.430 near Sivaiahoddu (V) in Santhipuram (M) of Chittoor District.
Construction of check dam across Chinna vanka near Obul Reddy fields near Kadapanagayapalli village Simhadripuram Mandal of YSR District.
Reconstruction of check dam across Pedda vanka near Sangarajupalli H/o Gurrappapagaripalli village in Veeraballi Mandal of YSR District
Repairs and Improvements to Kanneru Vagu check dam near Boddagunta(V) of Y.Ramavaram mandal(Upper) in East Godavari District
Repairs of Check Dam across Palar River at Km 28.310 near Giddeganipenta (V) in Kuppam (M) in Chittoor District.
Reconstruction of Check Dam across Palar River at Km 14.500 near Santhipuram (V) in Santhipuram (M) of Chittoor District.
Construction of Check dam across Nasanakota Vanka near Ajineyulu Fields near Muthuvakuntla (V) in Kanaganapalli(M) of Ananthapuramu (Dist)
Construction of check dam across Pandameru vanka near Pedda Pothanna fileds near Baddlapuram (V) in Kanaganapalli (M) Ananthapuramu (dist)
Construction of Check dam across East Veerayapalem Alugu vagu near East Veerayapalem Village of Darsi Mandal in Prakasam District
Neeru-Chettu -CONSTRUCTION OF CHECK DAM ACROSS MAMIDIKALAVA THIPPA OF MANAMALA (V) IN OZILI MANDAL OF SPSR NELLORE DISTRICT.
Construction of check dam across Jammimanu cheruvu vanka in S.No:502-836 Athamakur (V) in Tadimarri (M) Ananthapuramu (dist)
Construction of check dam across Rekulamula vanka near Sy.No.477/1 in Buddareddypalli (V) Dharmavaram(M) of Ananthapuramu District
Construction of Check Dam (CD No 8) a/c Gundlamadugu vagu near Ayyanapalem village in Bollapalli Mandal Guntur District
Construction of Check dam across Erragunta Vanka, near Hanumanna fields in Gajarampalle (V) in Pamidi (M) of Ananthapuramu (Dist)
Construction of check dam near Sake Chennappa filed Sy.No.379/1 in Buddareddypalli (V) Dharmavaram(M) of Ananthapuramu District
OM annual maintenance of weed free on kakaraparru, Bank canals from Km.11.725 to 25.800, Km.23.480 to 33.800, in Jurisdiction of Irrigation Section Peravali
Preparation of Detailed Project Reports (DPRs) for Minor Irrigation tanks with an ayacut of 7599 (3075 Ha) to be taken up under Andhra Pradesh Integrated Irrigation and Agriculture Transformation project (APIIATP) with world bank Assistance as per CWC Guidelines and APIIATP norms pertaining to YSR Kadapa District.
Operation and maintenance of 2nd stage lift Kesavaram Lift-I at Km.1.350 on Thota Venkatachalam Pushkara Lift Irrigation Scheme for the year 2018-19 for the period from 1-06-2018 to 31-05-2019.
Operation & Maintenance of 33/11 KV Sub-station at Stage I Pump House of Siddapuram Lift Irrigation Scheme, Near Siddapuram (V), Atmakur (M), Kurnool District on work contract basis for the period from 01.09.2019 to 31.03.2020
Operation and maintenance of 2nd stage lift Kesavaram Lift-I at Km.1.350 on Thota Venkatachalam Pushkara Lift Irrigation Scheme for the year 2018-19 for the period from 1-06-2018 to 31-05-2019.
Re-Construction of pipe Culvert on vagu crossing at Km.1.400 and at Km.3.900 of inspection road from Stage-I Pump House to Stage-II Pump House of Sri BuddaVengala Reddy Siddapuram Lift Irrigation Scheme..
Re-construction of pipe Culvert on vagu crossing at Km.4.700 and at Km.5.200 of inspection road from Stage-I Pump House to Stage-II Pump House of Sri BuddaVengala Reddy Siddapuram Lift Irrigation Scheme.
Operation and Maintenance of 2nd stage Lift Kalvacherla Lift at Km.25.00 on Thota Venkatachalam Pushkara Lift Irrigation Scheme for the year 2024-25 for the period from the date of Agreement to 31-05-2025.
Annual Maintenance of Thota Venkatachalam Pushkara Lift Irrigation Scheme Main canla and Distributories from Km.0.000 to Km.38.600 for the year 2024-25 for the period from the date of Agreement to 31-05-2025.
Repairs to 1600 KVA transformer and associated electrical items at Malyala Lift Irrigation Scheme I on the foreshore of Srisailam Reservoir in Nandikotkur Mandal of Nandyal District to restore efficient power supply to the pump house
Operation and Maintenance of 2nd stage Lift Narasapuram Lift at Km.20.000 on Thota Venkatachalam Pushkara Lift Irrigation Scheme for the year 2024-25 for the period from the date of Agreement to 31-05-2025.
Removal of weed growth Yeleru Main Canal and breach canals in the jurisdiction of Peddapuram Mandal for the year 2022- 2023 of WUA - Tirupathi
Construction of 40Kl OHSR for water supply from irrigation canal to HRS, Ananthpur, Ananthpur District
Construction of 40Kl OHSR for water supply from irrigation canal to HRS, Ananthpur, Ananthpur District
Strengthening of Canal banks on Digamarru channel near Pedamamipalli village limits in Irrigation Section Palakollu
Construction of Sub Station near Stage 2 Pump House under Siddapuram Lift Irrigation Scheme in Kurnool District Civil Works (Civil Works i.e., Construction of Control Room, Compound Wall and Electrification at Stage 2 Pump House)(2nd Call)
Rewinding of 2500 KVA 33 6.6 KV HT Transformer etc and 33 6.6 KV outdoor Sub Station servicing including replacing of unserviceable items of VKMN Janjhavathi Reservoir Project Lift Irrigation Scheme at Rajyalaxmipuram Komarada Mandal Vizianagaram District
Operation and Maintenance of 2nd stage lift Kesavaram Lift-1 at Km.1.350 on Thota Venkatachalam Pushkara Lift Irrigation Scheme for the year 2023-24 i.e., for the period from 01-06-2023 to 31-05-2024.
Restoration of Irrigation system for effective water regulation including Monitoring and Management to Minor canals underWUA-240-Chintalacheruvu-IandWUA 241-Inavolu under Inavolu Major of NSJC