Loading…
Loading…
13,358 results • Best match
Construction of Road Dam Near Check Dam at Chilekampalle Village H/o of Chakrayapeta Mandal in YSR Kadapa District, Estimate Cost Rs.25.00 Lakhs
Construction of check dam across Vadde vanka near Suresh ReddyReddy fields of Utukurvandlapalli (V) H/o Surabi (V) in Chakrayapeta (M) of YSR District.
Construction of check dam across Pedda vanam vanka near Balaiah fields of Nerusupalli (V) H/o Nerusupalli (V) in Chakrayapeta (M) of YSR District.
construction of check dam across Kalamalavanka at 1.5 km upstream side of R&B Bridge near Potladurthi village in yerraguntla (M) of YSR District
Neeru Chettu Programme Construction of Check Dam across Local vagu near Pulipadu Road and Railway track in Nadikudi village Dachepalli Mandal of Guntur District
Repairs to Check dam near Srikanth Reddy fields across Morava vanka in Badugumakulapalli (V) H/o Kenamakulapalli (V) in Santhipuram (M) of Chittoor District.
Permanent Restoration to CDR for the Check dam across Local gedda Basagummigedda near Koravangi vilage of Koravangi Panchayat in Pedabayalu Mandal of Visakhapatnam District
Removal of damaged structures at Gundepalli Check Dam,SLRB,OT Sluice at KM 1.85 and Cattle Ramp at KM 1.67 on Yerracalva River to clear the water way,to avoid erosionof Banks and providing Irrigation facilities in Gundepalli Villages of Nallajarla Mandal in East Godavari District
Improvements and Strengthening of Polavaram Irrigation Project Right Main Canal Package No.IV from Km 89.000 to Km 105.100+2.465
Reconstruction of SLRB @KM 0.230 on Left canal of Torrigedda Medium Irrigation Project in Seethanagaram mandal East Godavari District
Polavaram Irrigation Project Right Main Canal - Package No.6 - Demolition of Temporary Pipe Bridge arrangement @ Km 148.847 of PIPRMC
Reconstruction of SLRB @KM 2.235 on Left canal of Torrigedda Medium Irrigation Project in Seethanagaram mandal East Godavari District
Polavaram Irrigation Project Right Main canal - Package No.6 - Demolition of Temporary Pipe Bridge arrangement @ Km 135.543 of PIPRMC
Reconstruction of SLRB @KM 11.000 on Right canal of Torrigedda Medium Irrigation Project in Seethanagaram mandal East Godavari District
Reconstruction of SLRB @KM 9.200 on Right canal of Torrigedda Medium Irrigation Project in Seethanagaram mandal East Godavari District
Reconstruction of SLRB @KM 0.700 on Main canal of Torrigedda Medium Irrigation Project in Seethanagaram mandal East Godavari District
Reconstruction of SLRB @KM 2.68 on Main canal of Torrigedda Medium Irrigation Project in Seethanagaram mandal East Godavari District
Reconstruction of SLRB @KM 1.735 on Main canal of Torrigedda Medium Irrigation Project in Seethanagaram mandal East Godavari District
Reconstruction of SLRB @KM 11.000 on Right canal of Torrigedda Medium Irrigation Project in Seethanagaram mandal East Godavari District
Reconstruction of SLRB @KM 0.230 on Left canal of Torrigedda Medium Irrigation Project in Seethanagaram mandal East Godavari District
Reconstruction of SLRB @KM 2.68 on Main canal of Torrigedda Medium Irrigation Project in Seethanagaram mandal East Godavari District
Extenstion of Guide walls on Right Main Canal from KM.17.92 to km.18.00 under rallapadu medium Irrigation Project
Restoration of Irrigation system for effective water regulation of Kommalapudi branch canal in Venkatachalam Mandal of SPSR Nellore District.
Providing CC road from beside irrigation canal to ulimella junction near Venkateswara swamy temple in Ulimella of Pulivendula Municipality
Restoration of Irrigation system for effective water regulation including Monitoring and Management to Alavala major, of Addanki Branch Canal
O&M to strengthening of banks on Kakaraparru canal at Vulnerable points under the jurisdiction of irrigation Section, Peravali.
Construction of RCC Culvert near ( Irrigation Canal) Shadikana back side in 26th ward of Tenali Municipality under GGMP Grant
Hindupur Municipality - General fund 2020-21- Laying of RCC pipes under irrigation canal at nimkampalli area in Hindupur town
Restoration of Irrigation system for effective water regulation of Guruvindapudi branch canal in venkatachalam Mandal of SPSR Nellore District.
Strengthening of canal banks on old No.3 channel Near Agarru community hall Sc colony in Irrigation Section, Palakollu.
Flood Protection work on Venkampeta Branch Canal of Rallapadu Medium Irrigation Project in Gudluru Mandals of SPSR Nellore Dist
Polavaram Irrigation Project Right Main Canal - Package No.6 - Demolition of Temporary Pipe Bridge arrangement @ Km 148.847 of PIPRMC
Reconstruction of SLRB @KM 2.235 on Left canal of Torrigedda Medium Irrigation Project in Seethanagaram mandal East Godavari District
Reconstruction of SLRB @KM 6.200 on Right canal of Torrigedda Medium Irrigation Project in Seethanagaram mandal East Godavari District
Restoration of Irrigation system for effective water Regulation including monitoring and management to Bed Level Escape and Canal bank at km 98 350 near Thatipadu village of KC canal.
Restoration of Irrigation System for effective water regulation including Monitoring and Management on Attili main canal in between Km.10.725 to km.17.400 in the jurisdiction of Irrigation section, Mandapaka
Restoration of Irrigation System for effective water regulation including Monitoring and Management on Attili main canal in between Km.10.725 to km.17.400 in the jurisdiction of Irrigation section, Mandapaka
Restoration of Irrigation system for effective water regulation including monitoring and management in between km 59.000 to km 69.000 on Campbell canal under Vadali section of Irrigation Sub Division, Kaikaluru
Restoration of Irrigation System for effective water regulation including Monitoring and Management on Attili main canal in between Km.10.725 to km.17.400 in the jurisdiction of Irrigation section, Mandapaka.
Neeru Chettu Programme-Somasila Project-SFC-Strengthening of canal banks duly providing lining of 4 L Distributary of South Feeder Channel from Km.0.300 to Km.1.300
FDR -Estimate for Repairs and Restoration Sluice Slab OT of Balusupadu Distributary at km 8.450 on Kachavaram main canal Of Balusupadu (V), Jaggaiahpeta (M) in NTR Dist
Removal of Weed from Amalapuram Main Canal and its distributary Channels for the year 2023-24 in both Khariff and Rabi Seasons in Amalapuram Section.(2nd Call)
FDR -Estimate for Repairs and Restoration Sluice Slab OT of Balusupadu Distributary at km 8.450 on Kachavaram main canal Of Balusupadu (V), Jaggaiahpeta (M) in NTR Dist
PIPHW-"Construction & laying of Pressure Main, Delivery Cistern, Approach channel, Tunnel and Protection works at D/s of Tunnel leading to Exit Channel of Irrigation Tunnel and dismantling of existing pressure mains 12 rows of Pushkara Lift Irrigation...
Estimate for Cost of Diesel Oil for Lifting of water from Drains/Canals for supplementation to the standing Crop for Rabi 2019-20 to the ayacut of PIP Irrigation Section, Muramalla
Estimate for Cost of Diesel Oil for Lifting of water from Drains/Canals for supplementation to the standing Crop for Rabi 2019-20 to the ayacut of PIP Irrigation Section, Muramalla
Preparation of Detailed Project Reports (DPRS) for 24 Cascades/71 Minor irrigation Tanks with an ayacut of 20404 Ac (8261Ha) tobe taken up under Andhra Pradesh Integrated Irrigation and Agriculture Transformation Project (APIIATP) with World Bank Assistance as per CWC guidelines and APII ATP norms pertaining to 6 Districts viz., Prakasam, Nellore, Kadapa, Anantapuram, Chittoor and Kurnool
Item-1 Preparation of DPRs for Modernization of 4 Cascade tanks and 12 Independent Minor Irrigation tanks under APIIATP(World Bank Phase-II) of Yellamanchili, Kotaruatla Rambilli,Narsipatnam,S.Rayavaram,Makavarapalem,Padmanabham,Bheemili,Chintapalli, Golugunda and Koyyuru Mandals (11 Mandals) in Visakhapatnam District
Preparation of DPRs for 78 Minor Irrigation Schemes out of remaining 169 tanks to be taken up under APILIP-II with JICA Assistance as per CWC guidelines and JICA norms pertaining to Krishna, Guntur, Prakasam, Nellore Kadapa Kurnool Ananthauram and Chittoor Districts
Improvements & Re construction of Side walls of Brundavanam sub branch channel at km 0.185 to 0.227 of Bathaluru distributary canal (L/s Off take at km 5.700 ), under Main KC canal, near Brundavanam (v), Allagadda (m), in Kurnool (Dt