Loading…
Loading…
13,359 results • Best match
Removal of weed on Lower Pulleru and Batumilli canals and their allied works under Cowtharam section for the year 2023-24.
Construction of control points in Canals for optimum use of Water in DP-51 and DP-52 of TBP LLC Project
Repairs of canals and structures of 4L Minor Off-take at Km. 1.180 on in Block No.6 TGP under VBR
Dr. NTTPS - Cleaning of Grass, Natchu and Fungus at trash racks of link canals I & II for the year 2018-19
DISMANTLING OF IRRIGATION STAFF QUARTER 3 BLOCKS
IRRIGATION MATERIALS UNDER THE GARDEN AT HILLTOP
PROVIDING CROSS BANDS TO ALAMURU CANAL AT CHOPPELA LOCK AND ARTLAKATTA CANAL AT KDIYAM LOCKS AND SAMALKOT CANAL AT VARIOUS PLACES FOR INTERMITTENT RELEASE OF RAW WATER TO SAMALKOT CANAL FOR FILLING OF SAMALKOT SS TANK.
Construction of Pipe Culvert Near Obulampalle village to Drain the recharged water collected from TGP Distributary blocks-21,22.
Construction of pipe culvert at Km 8.722 of 25R minor of tangeda major under distributary committee tangeda village
Providing new Foot Bridges at Km 1.500 Km 3.500, Km 5.500 and Km 8.500 of TS Distributary RBLLC
Desiltaion of Major Drains Irrigation canals and Medium Drains at Sramika Nagar main Road (Venkaiahswamy Temple Lane), Chandrababu Nagar C Block 4th street, Police Colonymain Road to Bridge, Chanikyapuri main Road , Ramakotaiah Nagar centre to Nakkagopal Nagar in Podalakuru Road and New Postal Colony 1st street in Division No.30 of NMC
Removal of Silt in KCC Main Canal & Branch canal and Construction of Pipe Culvert on Branch canal near Maddur Village of Pamulapadu Mandal in Kurnool District.
Providing repairs to UTs, Canal drops, lining, reading scale in the link canal from KM 0.00 to KM 5.20 of Yeleru Left Canal system.(2nd Call)
Somasila Project-Kavali Canal(BPR Canal)-Construction of diversion canal from Km.48.559 to Km.52.950 in foreshore of Chinnakraka Balancing Reservoir in SPSR Nellore District.
Somasila Project-Kavali Canal(BPR CANAL)Construction of Diversion Canal from KM.48.559 to Km.52.950 in Foreshore of Chinnkraka Balancing Reservoir in SPSR Nellore District.
Weed Removal (Tape Grass) for free flow water to save standing crops in rabi in Attili canal from Km 10.725 to Km 28.800 and its branch channels in Irrigation section, Mandapaka for the year 2019-20
Providing Supplementation of irrigation water to ayacut under Veeraiah cheruvu near kandulapadu village (V) from Bhalerao cheruvu near polavaram RHS canal in G konduru (m) in Krishna District including operation of the scheme for 4 months.
OM painting, Tarring and Oiling to the Locks, Head sluices and Off take sluices of Narasapuram Canal and Slit removal in Narasapuram Lock chamber and Mogalturu Lock chamber in jurisdiction of Irrigation section, Narasapuram in W.G.Dt.
O M annual maintenance of weed free for the year 2020-21 in Undi canal from km.53.100 to km 64.349 and its off takes Narasimhapuram, Mamidicheruvu, pedaamiram, Narayanacodu, and Vandrm Channels in Irrigation Section, Undi.
Restoration of Irrigation system for effective water regulation including Monitoring and Management for Providing Controlling Arrangements for Minors and DP's of Pamidipadu Branch Canal and Modepalli major under NSJC Sub Division Mundlamuru Control of Division Darsi.
OM painting, Tarring and Oiling to the Locks, Head sluices and Off take sluices of Narasapuram Canal and Slit removal in Narasapuram Lock chamber and Mogalturu Lock chamber in jurisdiction of Irrigation section, Narasapuram in W.G.Dt.
Medium Irrigation-Sri KVRK Surampalem Reservoir Scheme-Estimate for the work of Formation of Gravel path from Chainage Km.0.000 to km.38.121 to the Right Bank of Main Canal of Sri KVRK Surampalem Reservoir Scheme.
Restoration of Irrigation System for effective Water Regulation including Monitoring and Management on Lower Pulleru canal Right bank from km 45.200 to Km 45.600 and Left bank 45.700 to 46.100 in Upper Gudivada section, Pamarru limits.
Restoration of Irrigation System for effective Water Regulation including Monitoring and Management in Saki Drain above Commamuru Canal from Km 7.000 near Ramanayapalem(V) to Km.13.400 near Adusumilli(V) in Paruchuru(M) of Bapatla(Dt)
Restoration of Irrigation system for effective water regulation including Monitoring and Management for Providing Controlling Arrangements for Minors and DP's of Pamidipadu Branch Canal and Modepalli major under NSJC Sub Division Mundlamuru Control of Division Darsi.
Restoration of Irrigation system for effective water regulation including Monitoring & Management of HNSS Main canal in upsteam and downstream at Km 321.500, Km 323.000, Km 324.950, Km 326.400 and Km 327.325 in Sri Satya Sai District
Item-1/I.D-1954 Restoration of Irrigation System for effective water regulation including Monitoring and Management Perumallapalli Major from Km 0 000 to Km 6 800 on Nagarjuna Sagar Jawahar Main Canal under KotcherlaWUA 218 Vinukonda
O&M to annual maintenance of Weed free for the year 2024-25 in Undi Canal from Km. 53.100 to 64.359 and its off takes Narasimhapuram, Madmidicheruvu, Pedamiram, Narayanacodu and Vandram Channel in Irrigation Section, Undi
O M annual maintenance of weed free for the year 2020-21 in Undi canal from km.53.100 to km 64.349 and its off takes Narasimhapuram, Mamidicheruvu, pedaamiram, Narayanacodu, and Vandrm Channels in Irrigation Section, Undi.
O&M to annual maintenance of Weed free for the year 2023-2024 in Undi Canal from Km.53.100 to 64.349 and its off takes Narasimhapuram, Madmidicheruvu, Pedamiram, Narayanacodu and Vandram Channel in Irrigation Section, Undi
Improvements to Irrigation System of Nakhalakhandi Drain, Clearing of Vents of Aqueduct at 19.20 K.M of PBC Clearing Shoals etc., from 0.0 K.M from Ballakattu to 1.00 K.M Upto PBC Main Canal Gollaprolu in Gollaprolu Mandal
Restoration of Irrigation System for effective Water Regulation including Monitoring and Management of Scoures and slipped banks in between k.m 72.500 to 72.780 R/B of Commamuru canal near Ramanayaplem (V) Parchuru (M) of Bapatla District
Restoration of Irrigation System for effective Water Regulation including Monitoring and Management of Scoures and slipped banks in between k.m 73.300 to 73.600 L/B of Commamuru canal near murukuntapadu (V) Bapatla(M) of Bapatla District
Medium Irrigation- Sri KVRK Surampalem Reservoir Scheme - Estimate for the work of Formation of Gravel path from Chainage Km.0.000 to Km.38.121 to the Right Bank of Main canal of Sri KVRK Surampalem Reservoir Scheme.
Cost of Diesel Oil for lifting of Water from drains to supplement the standing crop for rabi 2022-23 under channels of Gannvaram main canal in between Km.55.400 to 72.300 in Irrigation section Razole limits.
Restoration of Irrigation system for effective water regulation including Monitoring and Management from km.6.739 to km.7.952 of of Tangedumalli major of Addanki branch Canal under DC.24 Rompicherla in Block No 14 of NSJC
Supplementation of water to the Rabi ayacut under Eluru canal by lifting through oil Engines from Koovvali, Pothunuru & Modicodu Drains in Pothunuru, Dosapadu, Kovvali & Malkapuram villages during Rabi crop for Fasali.1431 of Irrigation Section, Gundugolanu
Purchase of Office hardware and Peripherals under the main work of Providing Drinking water and Irrigation facilities to 68 tanks in the upland areas of kurnool District from left side of HNSS Main canal Phase-I.
Restoration of Irrigation system for effective water regulation including Monitoring and Management for Providing Controlling Arrangements for Minors and DP's of Pamidipadu Branch Canal and Modepalli major under NSJC Sub Division Mundlamuru Control of Division Darsi.
Restoration of irrigation system for effective water regulation including monitoring and management of the Right Main Canal of SGL Thotapalli Barrage Project fromKM 36.000 to KM 42.000 near Allupaltheru (V) in Badangi (M) of Vizianagaram District
Restoration of Irrigation System for effective Water Regulation including Monitoring and Management to wing wall on karamchedu new channel at k.m 85.050 of Commamuru canal near Karamcheu(V)in Karamchedu (M)of Bapatla Dt.(2nd Call)
Restoration of Irrigation system for effective water regulation including Monitoring and Management to 18R of Vizianagaram Branch Canal RMC of SGL Thotapalli Barrage Project from Km 0.00 to Km 2.100 to improve its Water Carrying Capacity.
Restoration of Irrigation system for effective Water Regulation including monitering and management to Infall RegulatorGates at 138.170 K.M. on TGP Main canal in deepcut area in Gangayapalli village limits Under TGP System in YSR Kadapa Dt.
Restoration of Irrigation system for effective water regulation including Monitoring & Management of HNSS Main canal under AVR HNSS Project - Phase-II - from Km 360.400 to Km 380.000 under Package No.11 in Sri Satya Sai District
Construction of Cross Regulator km.11.600 of 5th Branch Canal Under Sri Satya Sai Ganga Canal
Repairs to the canal and Banks from Km.104.000 to Km.111.500 of PABR Right Canal
Construction of Cross Regulator km.11.600 of 5th Branch Canal Under Sri Satya Sai Ganga Canal
Providing canal front development on both the banks of Bandar canal (4.8 km stretch ) in vijayawada
Repairs and Renovation of Existing Canal on Right Side at Km.14.000 of Main K.C canal
Repairs and Renovation of Existing Canal on Right Side at km.14.000 of K.C Main Canal