Loading…
Loading…
13,359 results • Best match
Closing of Breaches and desilting of Elichetladibba Canals and Strenghting of Elechetladibba Tank Bund in betwen KM.0.000 to KM.2.000 in Elechetaladibba (V) in Nagayalanka(M)
Strengthening of irrigation facilities at Agricultural Research Station, Amadalavalasa, Srikakulam Dist.
Providing C.C.Road from Irrigation office to Electrical Department in 4th Ward
Repairs to damaged existing compound wall at irrigation section Office, Bhimavaram
Strengthening of irrigation facilities at Agricultural Research Station, Amadalavalasa, Srikakulam Dist.
Providing Irrigation facility in Swatantra Nagar park of Zone-I area.
Reconstruction of Irrigation Sub Division Office at Tirupati of Tirupati District
Providing Irrigation facility in Swatantra Nagar park of Zone-I area.
Supply of Xerox Machine to Irrigation Division Madanapalle of Chittoor District
Removal of Weed growth in WUA Ramachandrapuram in Irrigation section Ramachandrapuram
Removal of weed growth in Mandapeta channel in Irrigation Section Ramachandrapuram
Laying of Cement Concrete lining for canal bed, between Km.31.540 to Km.31.630 and Laying of Cement Concrete lining for canal bed between Km.32.520 to Km.32.570 (near Aravakur Nagappa Field) of PABR Right Canal
Silt Removal from KM 9.150 To KM 15.125 (TE) of 2B Branch Canal including 6R,7R,8R,9R,10R,11R,12L,13R,14L,15R,&16TE majors and its Minors of 2B Branch Canal of SSG Main Canal
PROVIDING CROSS BUND TO SAMALKOTA CANAL AT CHOPPELLA LOCKS, AND SAMALKOTA CANAL AT VARIOUS PLACES FOR INTERMITTENT RELEASE OF RAW WATER TO SAMALKOTA CANAL FOR FILLING OF SS TANK OF KAKINADA MUNICIPAL CORPORATION SUMMER ACTION PLAN 2024.
Restoration of Irrigation system for effective water regulation of Congress Channel and link canals at Kotha vangallu Vill of Kodavaluru (M)
Strengthening of TGP Canal to Kodipunjula vagu near Narsinghapalli (V) in Porumamilla (M) in YSR Kadapa District
Improvements to Surampalem canal system in between KM 14.000 to KM 38.000 for the year 2026-2027
Restoration of the canal to its original standards by construction of trough side wall with cement concrete on RSD canal at KM 18.650
Removal of silt from water supply canal from KM 30.00 to KM 33.60 by machinery and manually of Yeleru Left main canal system.
Maintenance of Greenery at Eluru Canal left and Right side of Canal Bunk for a period from 01.05.2019 to 30.04.2020.(Rc.E11-108905/2020)
Widening of existing Uyyala Kaluva branch canal and construction of new culverts on the canal in Division no. 38 & 48 ( Under 14th FCG )
NEERU - CHETTU-Jungle Clearence De-Silting and strengthening of canal Bund from Km. 4.000to Km. 6.475 of Degapudi Major under 1st Branch Canal
Providing cross bund across Eluru main canal near old raw water pumping station during canal closure period in Tadepalligudem Municipality for Summer 2020
NEERU - CHETTU-Jungle Clearence De-Silting and strengthening of canal Bund from Km. 4.000to Km. 6.475 of Degapudi Major under 1st Branch Canal
Removal of silt from water supply canal from KM 25.00 to KM 30.00 by machinery and manually of Yeleru Left Main Canal system.
Restoration of Canal Section at 15th Distributory and other improvements in Right Main Canal of Gajuladinne Project in Gonegandla (M)in Kurnool District
Repairs and Strengthening to the right side bank of K C Canal from km 98.500 to km 99.500 of Main K C Canal
Temporary Restoration of L/S and R/S Damaged Canal from Km 11.050 to Km 14.625 of 4L Major under 5th Branch Canal
Improvements to the canal right side bund of 14th block 9R Minor Distributory of TGP Main Canal from KM 0.000 to KM 2.700.
Providing warning signage boards for preventing dumping of garbage into canal along Eluru canal bund both sides in 13th ward of Tadepalligudem Municipality.
Construction of RCC Culvert on Paladri canal at Paladri canal at Paruchuri vari street in 4th ward of Tenali Municipality under General fund
Improvement to the canal Right Side Bund of 17th Block 1L Minor Distributory of TGP Main canal from KM 0.000 to KM 2.700
Repairs to Shutters on West Escape at Km Gate No. 10,11,12 on Krishna Eluru Main Canal Under Krishna Canal Section in Eluru Town
Providing cross bund across Eluru main canal near old raw water pumping station during canal closure period in Tadepalligudem Municipality for Summer 2022
Repairs to Shutters on West Escape at Km (Gate No. 1,2 ) on Krishna Eluru Main Canal Under Krishna Canal Section in Eluru Town
Restoration of Canal breach at Km 53.000 and Km 53.200 of Madakasira Branch Canal near Manchepalli (V) Somandepalli (M) Sri Satya Sai ( District).
Temporary Restoration of L/S and R/S Damaged Canal from Km 11.050 to Km 14.625 of 4L Major under 5th Branch Canal
FDR 10/20225 SP BPRC Temporary Restoration of L/s Canal Bank at Km 0.200 of Rudrakota Major Distributory of BPR Kavali Canal
Repairs and Strengthening to the right side bank of K C Canal from km 97.000 to km 98.000 of Main K C Canal
Repairs to Shutters on West Escape at Km Gate No. 8,7,6 on Krishna Eluru Main Canal Under Krishna Canal Section in Eluru Town.
Desilting Canal bed of 21L Kethaveerunipadu Minor from Km 0.00 to Km 4.700 of Eturu major-II of Nandigama Brach Canal of NSLBC
Excavation of silt from the canal bed between km 0.000 to Km.1.075 on CBR Right canal in Parnapalle village of YSR District.
Excavation of canal at Km.5.60 of SKD Tail end canal from Km.0.000 to Km.1.250 at Santhakovvuru Village in Thonduru Mandal
Repairs to Shutters on West Escape at Km Gate No. 5,4,3 on Krishna Eluru Main Canal Under Krishna Canal Section in Eluru Town
Providing cross bund across Eluru main canal near old raw water pumping station during canal closure period in Tadepalligudem Municipality for Summer 2026
Improvements to the canal right side bund of 14th block 1R Minor Distributory of TGP Main Canal from KM 0.000 to KM 3.500
Providing cross bund across Eluru main canal near old raw water pumping station during canal closure period in Tadepalligudem Municipality for summer 2021
Repairs to Shutters on West Escape at Km (Gate No. 5,4,3 ) on Krishna Eluru Main Canal Under Krishna Canal Section in Eluru Town.
Strengthening of inspection track,restoration of damaged dowel bank and filling gullies on canal banks between km 56.000 and km57.000 of SSG canal
Repairs to Shutters on West Escape at Km Gate No. 5,4,3 on Krishna Eluru Main Canal Under Krishna Canal Section in Eluru Town