Loading…
Loading…
13,359 results • Best match
Restoration of canal slip portion at Km 63/750 of RBHLC
Modernisation of Guntakal Branch Canal from Km.28.000 to Km.59.400
WIDENING OF HNSS MAIN CANAL FROM KM 79.075 TO KM 134.270
Formation of inspection path on G.E. bank canal near Pillanka Village
Improvements to PABR Right Canal between Km.25.000 to Km.30.000
Construction of Compound wall to Muncipal Guest house at Canal Bund
Repairs and Improvements near Km Minus 0.350 of PABR Right Canal
Improvements to ROFS stilling basin and Island area of Power Canal
Construction of Protection wall at Km 89.100 of PABR Right canal
Repairs to Muthyalampadu Escape on Eluru Canal in Vijayawada City Limits
Improvements to PABR Right canal from km 35.000 to km 40.000
O&M - Desilting of Bandar Canal from km 7.740 to 8.350
Improvements to Tadipatri Branch Canal from KM 2.100 to Km 2.300.
Improvements to feeder channel of Yerragunta tank from PABR Right Canal
Restoration of Mustooru O.T At Km.90.100 of PABR Right Canal
Improvements and repairs of 6RFC of 21st Distributory of M.P.South Canal
Improvements to PABR Right canal from Ch 100.000 to km105.000 Km
Embankment repairs from Km 194.200 to 196.700 on KCC Main Canal
CONSTRUCTION OF PAVANCHAL AT CANAL NEAR YETTIGATTU TOLETS IN 37TH DIVISION.
Embankment repairs from Km 191.700 to 194.200 on KCC Main Canal
Construction of pipe culvert at km.18.100 on Dharmavaram Branch Canal
O&M - Desilting of Bandar Canal from km 9.190 to 9.770
Canal Front Development in Kakinada Smart City - Phase-1/Zone-1
Providing guide walls to the canal at Km 7.727 of RBHLC
Construction of Super Passage at Km.31.125 on CBR Right Canal
Arresting of leakages from Km139.600 to Km 142.275 of SSG Canal
Improvements to PABR Right canal from Ch 95.000 to km100.000 Km
Improvements to PABR Right canal from km 30.000 to km 35.000
Improvements to PABR Right canal from Ch 108.000 to km112.000 Km
Construction of Pipe Culvert at Km 91.200 on PABR Right canal
Repairs of Neelapuram Minor and Gudipadu Major -1 of CMP Canal
Embankment repairs from Km 196.700 to 199.500 on KCC Main Canal
Restoration of flood damages at DLB Km.54.180 of SSG Canal
Restoration of Chintharlapalli O.T at Km.83.800 of PABR Right Canal
Improvements to canal cross regulator at Km.93/463 of RBHLC
Repairs to Structures on PABR Link Canal from 0.000 to 11.000
Improvements to canal cross regulator at Km.82/716 of RBHLC
Improvements to PABR Right canal from km 25.000 to km 30.000
Removal of weed by chemical, manual and ploughing on KE canal
Construction of Super Passage at Km.31.125 on CBR Right Canal
Repairs to 11th Distributory and other improvements in Right Main Canal
IMPROVEMENTS OF PABR RIGHT CANAL AT KM.23.150, KM.24.000 & 24.300
Improvements to PABR Right Canal between Km.35.000 to Km.40.000
Reconstruction of Karapa DP sluice at Km 50.103 of KMJ Canal
De silting SSG Main Canal from KM. 47.100 to Km 53.900
Improvements to Canal Cross Regulator at Km.118/050 of RBLLC.
Operation and Maintenance of Greenery at Dr.Y.S.R Park(from water edge to flyover) Pragathi Park(from water edge to road), & Ryves canal bund both left and right sides at irrigation locks in the Sambamurthy road for the period of 12 months (2025-2026) Rc.E3.PD3(Parks)-103359/2026
Restoration of irrigation system for effective water regulation including Monitoring & Management of KOR Gundlakamma Reservoir Project from Km 0.000 to Km 11.920 and all its distributaries 1L, 2L, 4R, 5L, 6R, 7L, 8R, 9L, 10R majors of Right Main ... Main Canal near ...
O&M Repairs to shutters on KS channel cross Regulator, surplus on KS channel, surplus on Manchili channel, Gate vents of Gummampadu lock, Paluru Head Regulator and Skinnerapuram channel no.1 Head regulator on Attili Main canal and its branch channels ... of irrigation section
O&M Removal of Tape Gross on Narasapuram Canal from km 30.400 to 40.200 and Achanta Channel and its branch channels from Km.0.00 to 11.00 and Rapaka Channel and branch channels from Km 0.00 to 26.800 and for the F-1432 in the jurisdiction of ... of Irrigation Section