Loading…
Loading…
13,359 results • Best match
Clearing of Jungle, Removal of slipped & settled Earth and forming of Canal banks and inspection track near KM 58.400 of Madakasira Branch Canal at Jangalapalli (V), Somandepalli (M),Sri Satya Sai (Dist).
O&M weed removal on Krishna Eluru canal from KM 43.500 to KM 54.00 under the jurisdication of KE canal section, perikeedu of west Godavari district for the year 2020-21 khariff
Completion of Balance Work Development of Landscape Work Retaining Walls and Beautification Work from Sai Baba Temple Side Canal drop to Vanthena SLRB for N.S.P Canal Kothapeta side Slopes in Vinukonda Municipality
O&M-Laying Sand bags on Sangam anicut to head up water and supply to BPR Canal and Kanupur Canal ayacut for Rabi 2021-22 in Sangam Mandal of SPSR Nellore District
HNSS PROJECT - Phase II - Madaksira Branch canal - Package No 35 construction OFF TAKE sluice AT Km 87.850 near Kotipi village of Hindupur Mandal on Madakasira Branch canal in Ananthapuramu District of A.P.
Clearing of Jungle, Removal of slipped & settled Earth and forming of Canal banks and inspection track near KM 58.400 of Madakasira Branch Canal at Jangalapalli (V), Somandepalli (M),Sri Satya Sai (Dist).
Desilting of Left Main Canal between chainages Km 1.60 to Km 3.50 and strengthening of canal banks between chainages Km 4.00 to Km 4.70 in Bhagiradhapuram colony village limits of Hiramandalam Mandal
Maintenance of Greenery at Ryves canal Left & Right side of canal bund from Tummalapalli Kalakshetram to Swarna Palace bridge for the period of 12months from 01-04-2021 to 31-03-2022
Breach Closing and protection wall to drain works at Km 1.822 Aquedact of 7L minor of Vizianagaram Branch Canal of Right Main Canal of SGL TBP Project to improveits water carrying potential.
HNSS PROJECT PHASE II Madakasira Branch canal Package 55 construction of OFF TAKE SLUICE at Km82.530 near Manepalli village of Lepakshi Mandal on Madakasira Branch canal in Ananthapuramu District of Andhra Pradesh
Excavation of feeder canal to feed Chennarayaswamy Gudi Project by gravity including construction of off take sluice at KM 63.325 of Punganuru Branch canal in Tanakallu (M) in Sri Sathya Sai District.
Clearing of Jungle, Removal of slipped & settled Earth and forming of Canal banks and inspection track near KM 34.000 of Madakasira Branch Canal at Sattarpalli (V),Roddam (M),Sri Satya Sai (Dist).
Clearing of Jungle, Removal of slipped & settled Earth and forming of Canal banks and inspection track near KM 37.300 of Madakasira Branch Canal at Adadhakulapalli (V),Penukonda (M),Sri Satya Sai (Dist).
HNSS PROJECT - Phase II - Madakasira Branch canal Package no:55 construction of OFF TAKE SLUICE at Km63.000 near Korlakunta village of Chilamathur Mandal on Madakasira Branch canal in Ananthapuramu district of A.P.,
Clearing of Jungle, Removal of slipped & settled Earth and forming of Canal banks and inspection track near KM 40.800 of Madakasira Branch Canal at Chennapuram (V),Somandepalli (M),Sri Satya Sai (Dist)
Clearing of Jungle, Removal of slipped & settled Earth and forming of Canal banks and inspection track near KM 55.500 of Madakasira Branch Canal at MaruvakuntaPalli (V), Somandepalli (M),Sri Satya Sai (Dist)
Clearing of Jungle, Removal of slipped & settled Earth and forming of Canal banks and inspection track near KM 41.100 of Madakasira Branch Canal at Chennapuram (V),Somandepalli (M),Sri Satya Sai (Dist).
Repairs to the MS Screw gear shuttering arrangements to the OT Sluice 4R Major @ KM 8.550 and OT Sluice of 12R Major at Km 19.900 of 7th Branch canal under SSG Canal.
HNSS PROJECT PHASE II Madakasira Branch canal Package No:55 construction of OFF TAKE SLUICE at Km69.200 near Mamidimakulapalli village of Lepakshi Mandal on Madakasira Branch canal of Ananthapuramu District of A.P.,
Clearing of Jungle, Removal of slipped & settled Earth and forming of Canal banks and inspection track near KM 22.400 of Madakasira Branch Canal at Konapuram (V),Penukonda (M),Sri Satya Sai (Dist).
Supply of human resources (labour) for maintenance of critical reaches of canal from Km 0.000 to Km 21.300 of Power Canal, TB Dam for the period from August 2024 to February 2025
Providing Road from Thatikayala madhu house to Irrigation culvert to Amabtivaripalem in P.Gannavaram(M) Est.Rs.220.00Lakhs
Construction of Regulator across Irrigation channel near Edagali Village in Venkatachalam Mandal of SPSR Nellore District.
Construction of RCC drain on Old HB Colony 3rd Cross road in 28th division. (Irrigation Grant)
Repairs to Culverts across Irrigation Channels near Padugupadu Village in Kovur Mnadal of SPSR Nellore Dt.
OM Estimate to Removal of shoals on Relangi channels under the Jurisdiction of Irrigation section, Attili.
FDR- Urgent Repairs to Irrigation Section, Tirupathi rural at Tirupathi of Chittoor District. (Item no.03)
Reparis to Irrigation Cum YellavaKalava of Edagali Village limits in Venkatachalam Mandal of SPSR Nellore District
Providing Road from Thatikayala madhu house to Irrigation culvert to Amabtivaripalem in P.Gannavaram(M) Est.Rs.220.00Lakhs
Removal of Silt from ambajipeta Channel between K.M.5.800 to K.M.14.400 in Irrigation Section, Gopalapuram.
Beautification - Painting to the Divider walls from Irrigation Office (Anam Venkata Reddy Statue) to Anil Gardens
Removal of Silt from ambajipeta Channel between K.M.5.800 to K.M.14.400 in Irrigation Section, Gopalapuram.
Construction of RCC drain on Old HB Colony 3rd Cross road in 28th division. (Irrigation Grant)
O&M to Desilting of Manchili channel from Km.0.00 to 6.00 in Irrigation Section, Attili.
Polavaram Irrigation Project - Package No.6 - Demolition of Temporary Pipe Bridge arrangement @ Km 140.380 of PIPRMC
Laying of pipeline from existing borewell for irrigation at N-Block, KVK, Venkataramannagudem, West Godavari District
Beautification - Painting to the Divider walls from Irrigation Office (Anam Venkata Reddy Statue) to Anil Gardens
OM to repairs to Damaged existing protection wall and office building at Irrigation sub division, Undi
Improvements to Irrigation channel under Sanjeevpuram Tanka near Sanjeevpuram (V) in Obulavaripalli Mandal of Tirupati Dist.
Restoration of irrigation system for effective water regulation including Monitoring & Management of works to MPR Dam.
Reparis to Irrigation Cum YellavaKalava of Duthapadu Village limits in Muthukur Mandal of SPSR Nellore District
Reparis to Irrigation Cum YellavaKalava of Pottempadu Village limits in Muthukur Mandal of SPSR Nellore District
Restoration of Irrigation System for effective Water Regulation including Monitoring and Management in Inampudi Major Drain
OM to repairs to Damaged existing protection wall and office building at Irrigation sub division, Undi
Construction of Uunder Tunnel across the Gumparru Channel in Irrigation Section, Siddantham in West Godavari District
Procurement and Maintenance of flood stores materials of Irrigation Section, Kovur for the year 2020-21
Infrastructure Works in Taduvai Layout of Jangareddigudem Mandal, Eluru District under R&R Polavaram Irrigation Project.
Desiliting work to Magam Main Channel from Km:0.000 to Km:15.700 in Irrigation Section, Mukteswaram.
Reparis to Irrigation Cum YellavaKalava of Pidathapoluru Village limits in Muthukur Mandal of SPSR Nellore District
Construction of Toilet block in the premises of Irrigation Circle office at Chittoor mandal and district.