148 live96 closing this weekmost from Karnataka Neeravari Nigam Limited and Minor Irrigation Department
148 results • Best match
Drilling of Borewell in the Land of 1) Sri. Manjunatha S/o Narayanaswamy in Dhanamattahalli Village, 2) Sri. Ramesh S/o Late Muniyappa in Vemgal Village, Kolar Taluk, Kolar District.
Drilling of Borewell in the Land of 1) Sri. Munihanumappa S/o Venkateshappa, Yalavara Village, 2) Sri. Byrappa S/o Late Boolappa, Danahalli Village, Kolar Taluk, Kolar District. (Reserved for SC Category contractor only)
Drilling of Borewell in the Land of Sri. D.V. Srinivasa S/o Venkateshappa, Devarahalli Village, Kolar Taluk, Kolar District. (Reserved for CAT-II(A) Category contractor only)
Drilling of Borewell in the Land of 1) Sri. Gangamma W/o Late Hanumappa, Mylandahalli Village, 2) Sri. Muniramakka W/o Muniyappa, Ramasandra Village, Kolar Taluk, Kolar District. (Reserved for ST Category contractor only)
Drilling of Borewell in the Land of Sri. Nagaraja.V S/o Late Venkataramappa, Purahalli Village, Kolar Taluk, Kolar District. (Reserved for CAT-II(A) Category contractor only)
Drilling of Borewell in the Land of Sri. Gangamma W/o Anjappa, Sugaturu Village, Srinivaspura Taluk, Kolar District. (Reserved for CAT-I Category contractor only)
Drilling of Borewell in the Land of Sri. Narayanaswamy S/o Ramanna, Shettimadamangala Village, Srinivaspura Taluk, Kolar District. (Reserved for SC Category contractor only)
CONSTRUCTION OF A BRIDGE-CUM-BARRAGE ON THE ROAD IN BETWEEN PARAPURA, NEAR BASANNA TEMPLE IN NAGARABENCHI VILLAGE OF MASKI ASSEMBLY CONSTITUENCY, RAICHUR DISTRICT
Construction of an Impounding Reservoir near Kurdi Village in Manvi Taluk of Raichur District.
Consultancy Services for Survey,Investigation, Designs, Drawings & Preparation of DPR for Construction of Checkdam cum Bridge near Yambali Vaddarahatti village in Kudligi taluk Vijayanagara District
Consultancy Services for Survey, Investigation, Designs, Drawings & Preparation of Detailed Project Report(DPR) for Construction of Pickup cum Bridge across Tungabhadra river near Gharbhagudi and Belur village in Harapanahalli Taluk of Vijayanagara Dist.(Previous nomenclature Renebennur taluk Haveri District)(Balance work)
Consultancy Services for Survey, Investigation, Designs, Drawings & Preparation of DPR for Rejuvenation of Garbhagudi-1 LIS in Harapanahalli Taluk Vijayanagar District
Consultancy Services for Survey,Investigation, Designs, Drawings & Preparation of DPR for Construction of Percolation Tank Between Chikkakumbalagunte and Hulikere villages in Kudligi Constituency of Kudligi taluk Vijayanagara District
Construction of Checkdam cum bridges across halla at Venkatapura-Siddapura to Nagatihalli village road and across halla at Chikkur to Sankondanahalli village road in Banavara Hobli , Arsikere Taluk, Hassan District
Improvements to Hampasandra Kere in Gudibande taluk, Chikkaballapura District
Construction of bridge cum vented dam at Aramanakatti Santhyaru in Kinya village of Ullala taluk in Dakshina Kannada district
Desilting and improvement of rain water public drain flowing near Arkula Valacchil Jari in Adyar gram panchayath of Mangaluru taluk in Dakshina Kannada district
Construction of substation and commissioning of Mugalolli LIS Site-2 at Mugalolli Village of Bagalkote Taluk and Dist (Under 4702 LIS) for 2025-26
Improvements of Service road and removal of jungle & silt in distributary of 98 A & 98 B of TLBC(In selected reaches)
Construction of Retaining wall in distributary 98 for embankment reaches to avoid overflow at PO 13A and gate repairs under TLBC.
Providing ManPower for Water Management of Basavan Bagewadi Branch Canal (From0.00to72.55KM )& its Distributary Network along with lifting of Vertical lift gate and Head Regulator Gates at Ch. 11th km, 19th Km &70th km of Bijapur Main canal for Tank Filling purpose for The Year 2026-27
Reconstruction of CTC at 5.15 and 10.05 km and Removal of silt and jungle in distributary 95 of TLBC(in selected reaches).
Reconstruction of CTC at Ch 54 and 87.5 Improvements of SR and removal of silt and jungle in distributary 94 under TLBC (in selected reaches)
Engaging of Hydraulic excavator and tractors for maintenance of canals for the year 2026-27
Improvements of Service Road, protective work and removal of jungle & silt in Sub-Disty 98/4L &98/5L in Distributary of 98 of TLBC(in selected reaches)
Improvements to Yerramanahalla Pickup and Pickup Canal under D-15 of RBHLC
Repairs of PO at ch 126 R/S and Removal of silt and jungle and improvement of SR in balance portion in Distributary 96 of TLBC (in selected reaches).
Improvement to Rupanagudi spring canal under D-16A of RBHLC in Ballari Tq
Repair of pipe outlets ,Removal of silt and jungle from km 0.00 to 15.00 and improvement of service road from km 14.00 to 15.00 of distributary 98 0f TLBC (in selected reaches)
Consultancy services for Detailed Survey, Investigation, preparation of design, drawings, estimates, Detailed Project Report, Package Estimate, DTP and LAQ proposals for intake structure, pumping machineries, electrical works, delivery chamber, ... Sub Distributary D25/11 ... of Distributary 25 ...
Improvements of Service road and removal of jungle & silt in Sub- Disty 98/2L & 98/3L and construction of CTC at ch 1.00 in 98/2L in Distributary of 98 of TLBC (in selected reaches)
Improvements to Service Road from 0.00 to 6.50 Km of M2 Distributary of RBLLC under Kampli Constituency
Improvements to Canal network,Drops and Reconstruction of Head sluice,Bridge,Superpassage and other structural works of Tungabhadra RBHLC
Construction of gauge room at Border of Karnataka at Km 42.50 of RDS Main Canal of Tq Dist Raichur.
Subsurface irrigation system at ICAR-IISR, RS, Appangala
Permanent overhead irrigation System at Block 16 ICAR-IISR, RS, Appangala
Supply of Manpower for Canal Water Management of D-25,D-26, D-29, and from ch.55.00 to 62.00km, 70.00 to 81.00km, ch.92.00 to 105.00km and ch.115.00 to127.00 km of D.Devaraju Urs canal, and Distributaries coming under these reaches, Yennehole RBC, ... pickup canal , ... pickup canal LBC ...
Reconstruction of damaged pipe outlets under NRBC, Reconstruction of damaged pipe outlets under NLBC, Construction of Bridge across Nugu Right bank canal at ch 0.60 km, Construction of Bridge across Nugu Right bank canal at ch 16th km, Construction ... Bank canal & ... Rampura Canal in ...
Establishment of irrigation to black pepper plants at Germplasm site Chettalli ICAR-IISR-RS, Appangala
Construction of FD in Sy No. 87,85,84 of 2nd Sub canal of Bhadra Right bank canal of Halasuru village & Sy No.119,117 of Halasuru village in Tarikere Taluk (Reserved for ST)
Supply of Man power for water management of RLIS canal network for three years
Construction of SP/CTC in km 1.00 of Kulgod dy Under GRBC Main canal
Supplying Labours For Hemavathy Canal Circle Office CR Patna for the Year 2026-27
Repairs to Gate & Bed Lining in vulnerable reaches of Chinchali main canal and Other connected works.
Providing Man Power for Water Management of canal network of Sonna LIS for the year 2026-27.
Providing Man power for Water Management of Canal network of Yalligutti Pipe network for The Year 2026-27
Providing Man Power for Water Management of Canal Network of Rolli Mannikeri LIS for the year 2026-27.
Providing Man Power for Water Management of canal network of Teggi Siddapur LIS for the year 2026-27
Construction of Foot Bridge connecting Masuvalli village to Yamasandhi across the canal, at Yamasandhi Grama Panchayat in Belur Taluk
Removal of Silt and Jungle in selected reaches of Old Akkihebbal canal coming under MRBC for the year 2026-27