Loading…
Loading…
9,644 results • Best match
Supply of Man Power for Maintance of Yermarus Camp, Rampur Camp water management and maintenance of main canal from mile 104 to 131 of TLBC Balancing reservoir at mile 109 of TLBC distributaries 99 99A 100 and 102 of TLBC for the year 2025-26
Repairs to Head wall on DOL-1 of Jamkhandi Branch Canal and Removal of Silt and Jungle clearance on selected reaches of Jamakhandi Branch Canal from Km No 5 to 9 and other works.
Supply of Man power for canal water Management (Sowdies) of HRBC, HRBHLC, ABLIS and APLIS, Gauging And other Miscellanious works of canal coming under No.1 HRBC Subdivision Arkalgud for the year 2025-26.
AME Of Main Canal from Ch 10.00 to 20.00 km of KBC and Main Canal from Ch 120.00 to 128.00 km and Dy 47 and Dy 55 of ILC For the year 2025-26
Providing Manpower for Water Management of from Km 0.00 to Km 63.88 Huvina Hipparagi Branch Canal and from 0.00 to 56.00 of Tidagundi Branch Canal for Tank Filling purpose for the year 2025-26
Providing Sowdies and outsource employees for water maintenance of Hemavathy Left Bank Canal from CH 0.00KM to 18.00 KM including chanagaravalli anecut canal and Distrubutory No 1 to 8A for the year 2026-27
Earthwork Excavation, Formation of Embankment, Providing Canal Lining to Damaged Portion of Canal network due to Rain flooding, control the Seepage to adjacent affected lands and improvement of SR and IP fromCh 32.300Km to Ch 32.500Km and Ch 34.800Km ... Main canal .
Improvements to Ghataprabha left bank canal colony and office building coming underRaibag sub division
Special repairs to head walls of Lateral L-1, CD of SL-01 of lateral L-1 and CD at ch-20.50 km of main Distributary -22 of Dy-22 under IBC
Supplying of man power for the water management of TBC Distributary No 13A, 14, 14A & 15 of TBC coming under the jurisdiction of No 4 HCSD Gubbi for the year 2025-26
Removal of Silt and Jungle clearance in selected reaches of main canal for smooth flow of water in canal for tank filling schemes
Removal of silt in of 1st, 2nd, 3rd to 8th dy and its Pickup canal under OMBC and 9th, 10th Dy 11th, 12th Dy, 13th, 13th A, 14th dy and its Pickup canal under NMBC.
Providing Man Power for Water Management of Combined Canal from Km 0.00 to 1.175 Bijapur Main Canal (from 0.00 to 90.00 Km) and its Distributaries Network for Tank filling purpose for the year 2025-26.
Removal of silt and weeds in selected reaches of RBC, LBC and CDS Extension canal and Repairs to Morkha addahall pickup, PO1 of RBC, PO1 of Morkha pickup canal under the atchkat of Bannur tank
Removal of jungle from km 0.00 to km 63.88 of Huvina Hipparagi Branch Canal and from km 0.00 to 56.00 of Tidagundi Branch Canal under MLIS-III for Tank Filling for the year 2025-26.
Removal of Silt and Jungle in Selected reaches of Remaining D-60, 61, 62, 63, 64, Rayarane pick up canal, Hosaholalu and B. Bachahalli high level, Doddanakatte pickup anecut canal and Minors coming under HLBC.
Excavation in AKS C C 20 M 15 for side liningfor canal C C 20 M 15 for Bed lining for canal TMT steel renforcement
Construction of Foot Bridge across the Seegehalla canal Ghatethavaru village in shivamogga Taluk.
Removal of silt and Jungle Clerance of Sonthi Branch Canal From km 0.80 to 11.60km
Emergent rain Damage work of restoration of lining at km 21.800 of Shahapur branch canal
Improvements to the Dy -27,28, 29,30 & DOL-31 of MRBC Main canal (RESERVED FOR ST)
Improvements to km No 51 to 55 of MRBC Main canal .(RESERVED FOR CAT-1)
Improvements and Providing trough wall to Kanva distributory canal of LBC at Rampura Village limit
Plugging leakages and Repairs to damaged bund from 1st to 5th Branches of RSM Canal
Clearing Jungle and Removal of Silt in Hemagiri Anecut Canal for the year 2025-26
Restoration of CC lining and embankment of Lateral No4 of Dy13A under CLIS East Canal
Removal of silt in Dy.60, 61, 62, 63 and Yashodarapura sluice canal under HRBC
Reconstruction of Cart Bridge across Kodagalli Tank halla near Gadijogihundi Village under CDS Main Canal
Removal of jungle in sides from ch 0.0 to 7.0 km of Kochanhalli Pickup canal
Scour filling and Restoration of cc lining at ch.35.40, 35.50km of SBC main canal
Restoration damaged CC lining at Ch 0.15km,2.20km,8.70km and 9.30km of JBC Main canal.
Removal of silt & jungle clearance tamba canal from 0.00 to 8.00km of NBC (selected reaches)
CONSTRUCTION OF SALAPURA MAIN CANAL FROM CH 1.00 to 1.62KM INCLUDING STRUCTURES UNDER SALAPURA LIS
AME of NBC KM 20.00 to 30.00 Including Kadlewada Canal For the year 2025-26
AME (Manpower) of Canal Ch159.60 km CR/Escape of IBC for the year 2025-26
Raising of plantation at Nelogi Canal Bridge to Kutanoor Raod 3 Km in Kalaburagi Range
Construction of sopanum & Improvements of road near Sarguru village under Hullahally canal in Nanjangud Taluk.
Repairs to Gates of Laterals under Dy-28, & 29 of Laterals of Indi Lift Canal.
Providing Basic Amenity to CBC canal reach of Shiragaon village in chikodi taluka (part-3)
Removal of Silt & Jungle clearance of Dy-46, 56,57 of Indi lift canal. (selected Reaches)
Removal of silt and jungle clearance from km 85.00 to 110.00 of Chimmalagi East Canal
Providing cement concrete lining to breached portion of UTP main canal at Ch.63.180 Km
Providing Basic Amenity to CBC canal reach of Shiragaon village in chikodi taluka (part-1)
Removal of silt in Dy 36,37,42 & 47 of Bijapur Main Canal under MLI Stage-lll
Shifting of HT LT line and DTC structure under Package-14 of Yettinahole gravity canal
AME of Canal Network of IBC Dy-1A and 1B . for the year 2025-26
Shifting of Naduvanahalli MS Pipe line of Hemavathi Project Crossing Yettinahole canal Project at Ch144.356km
Removal of jungle in sides from ch 0.00 to 7.00km of Yennehole Right bank canal
Providing basic aminity for Chikodi Branch Canal in Reaches of Vadagol village of Chikodi Taluka
Raising of plantation at Sona Cross to Nelogi Canal Bridge 3 Km in Kalaburagi Range